ML16197A039: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16197A039
| number = ML16197A039
| issue date = 07/15/2016
| issue date = 07/15/2016
| title = Watts Bar, Units 1 and 2 - NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations
| title = NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations
| author name = Simmons P
| author name = Simmons P
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::RIS 2016-09]]


=Text=
=Text=
{{#Wiki_filter:Tennessee  
{{#Wiki_filter:Tennessee Valley Authority, 1 101 Market Street, Chattanooga, Tennessee 37402 July 15, 2016 10 cFR 50.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and2 Facility Operating License No. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391
Valley Authority,  
 
1 101 Market Street, Chattanooga,  
==Subject:==
Tennessee  
Nuclear Regulatory Commission (NRC) Regulatory lssue Summary (RlS) 2016 Preparation and Scheduling of Operator Licensing Examinations
37402July 15, 201610 cFR 50.4U. S. Nuclear Regulatory  
 
Commission
==Reference:==
ATTN: Document  
NRC RIS 2016-09, "Preparation and Scheduling of Operator Licensing Examinations," dated June 16, 2016 Regulatory lssue Summary (RlS) 2016-09 requested information regarding Watts Bar Nuclear Plant's (WBN's) projected operator licensing examination schedules and the estimated number of applicants. The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for WBN on NRC Form 536.
Control DeskWashington,  
There are no new regulatory commitments in this letter. Should you have any questions regarding this submittal, please contact Walter Smith, Operations Training Manager at (423) 365-8081 or Gordon Arent, Director of Watts Bar Site Licensing at (423) 365-2004.
D.C. 20555-0001
Respectfully, Paul Simmons Site Vice President Watts Bar Nuclear Plant
Watts Bar Nuclear Plant, Units 1 and2Facility
 
Operating  
U.S. Nuclear Regulatory Commission Page 2 July 15, 2016
License No. NPF-90 and NPF-96NRC Docket Nos. 50-390 and 50-391Subject:  
 
Nuclear Regulatory  
==Enclosure:==
Commission  
NRC Form 536 - Operator Licensing Examination Data cc (Enclosure):
(NRC) Regulatory  
NRC Project Manager - Watts Bar Nuclear Plant NRC RegionalAdministrator - Region l!
lssue Summary(RlS) 2016-09 - Preparation  
cc: w/o Enclosure NRC Senior Resident lnspector
and Scheduling  
 
of Operator  
Enclosure NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Watts Bar Nuclear Plant, Units { and 2 NRG Docket Nos. 50-390 and 50-391
Licensing
 
Examinations
U. S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO.               3150-0131                           EXPIRES:       1013112017 Estimated burden per response to oomply with this voluntary information collection request t hour. This information collection is used to plan budgets and resources for operator examinations. Senc OPERATOR LICENSING                  comments regarding burden estimate to the FOIA, Privacy, and lnfurmation Collections Branch (T-[
Reference:  
F53), U.S. Nuclear Regulatory Commission, Washington, 0C2055S0001,                   or by   e-mail tc EXAMINATION DATA                lnbcollects.Resource@nrc.gov, and to the Desk Officer, Office of lnformation and Regulatory Affairs NEOB-10202, (3150-0131), ffice of Management and Budget, Washington, DC 20503. lf a means used to impose an infurmation oolleclion does not display a currently valid OMB control number, the NRC may not mnduct or sponsor, and a person is not required to respond to, the information collection.
NRC RIS 2016-09,  
FACILITY                                                                                                  NRC REGION Watts Bar Nuclear Plant, Units 1 and 2                                                                          il A. PROPOSED EXAMINATION                   PREPARATION SCHEDULE PROPOSED NUMBER              cY39lx                cY 2019                                cY 2020                                    cY 2021 ESTIMATED NUMBER OF LICENSEE.PREPARED                 1                    0                                          I                                          0 EXAMINATIONS ESTIMATED NUMBER OF NRC.PREPARED                   0                    0                                          0                                          0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER              cY 2018              cY 2019                            cY 2020                                    cY 202t NUMBER OF REACTOR OPERATORS 10                    0                                          7                                          0 NUMBER OF SENIOR REACTOR OPERATORS. INSTANT 6                    0                                          7                                          0 NUMBER OF SENIOR REACTOR OPERATORS. UPGRADE 2                    0                                          2                                          0 NUMBER OF SENIOR REACTOR OPERATORS. LIMITED                0                    0                                          0                                          0 PROPOSED DATES PRIMARY DATE                07 12018                NA                                    0712020                                        NA ALTERNATE DATE              0912018                NA                                    0912020                                        NA
"Preparation  
: c. pRoposED GENERTC FUNDAMENTALS EXAMINATTON (GFE) SCHEDULE PROPOSED                        cY    2017                                                        cY        2018 NUMBER MARCH                  SEPTEMBER                          MARCH                                          SEPTEMBER ESTIMATED NUMBER OF                0                      0                                  0                                                    18 CANDIDATES NRC FORM s36 (0S2016)}}
and Scheduling  
of Operator  
Licensing
Examinations,"  
dated June 16, 2016Regulatory
lssue Summary (RlS) 2016-09 requested  
information  
regarding  
Watts BarNuclear Plant's (WBN's) projected  
operator  
licensing  
examination  
schedules  
and theestimated
number of applicants.  
The enclosure  
to this letter addresses  
the NRC'srequest and provides  
an estimate  
of the examination  
requirements  
for WBN on NRCForm 536.There are no new regulatory  
commitments  
in this letter. Should you have anyquestions
regarding  
this submittal,  
please contact Walter Smith, Operations  
TrainingManager at (423) 365-8081  
or Gordon Arent, Director  
of Watts Bar Site Licensing  
at(423) 365-2004.
Respectfully,
Paul SimmonsSite Vice President
Watts Bar Nuclear Plant  
U.S. Nuclear Regulatory  
Commission
Page 2July 15, 2016Enclosure:  
NRC Form 536 - Operator  
Licensing  
Examination  
Datacc (Enclosure):
NRC Project Manager - Watts Bar Nuclear PlantNRC RegionalAdministrator  
- Region l!cc: w/o Enclosure
NRC Senior Resident  
lnspector
Enclosure
NRC Form 536Operator
Licensing  
Examination  
DataTennessee
Valley Authority
Watts Bar Nuclear Plant, Units { and 2NRG Docket Nos. 50-390 and 50-391  
U. S. NUCLEAR REGULATORY  
COMMISSION
OPERATOR
LICENSING
EXAMINATION
DATAAPPROVED
BY OMB: NO. 3150-0131  
EXPIRES:  
1013112017
Estimated  
burden per response  
to oomply with this voluntary  
information  
collection  
request t hour. Thisinformation
collection  
is used to plan budgets and resources  
for operator  
examinations.  
Senccomments
regarding  
burden estimate  
to the FOIA, Privacy,  
and lnfurmation  
Collections  
Branch (T-[F53), U.S. Nuclear Regulatory  
Commission,  
Washington,  
0C2055S0001,  
or by e-mail tclnbcollects.Resource@nrc.gov,  
and to the Desk Officer,  
Office of lnformation  
and Regulatory  
AffairsNEOB-10202,  
(3150-0131),  
ffice of Management  
and Budget, Washington,  
DC 20503. lf a meansused to impose an infurmation  
oolleclion  
does not display a currently  
valid OMB control number, theNRC may not mnduct or sponsor,  
and a person is not required  
to respond to, the information  
collection.
FACILITYWatts Bar Nuclear Plant, Units 1 and 2NRC REGIONilA. PROPOSED  
EXAMINATION  
PREPARATION  
SCHEDULEPROPOSED
NUMBERcY39lxcY 2019cY 2020cY 2021ESTIMATED
NUMBER OFLICENSEE.PREPARED
EXAMINATIONS
10I0ESTIMATED
NUMBER OFNRC.PREPARED
EXAMINATIONS
0000B. INITIAL OPERATOR  
LICENSE EXAMINATIONS
PROPOSED  
NUMBERcY 2018cY 2019cY 2020cY 202tNUMBER OF REACTOROPERATORS
10070NUMBER OF SENIOR REACTOROPERATORS.  
INSTANT6070NUMBER OF SENIOR REACTOROPERATORS.  
UPGRADE2020NUMBER OF SENIOR REACTOROPERATORS.  
LIMITED0000PROPOSED
DATESPRIMARY DATE07 12018NA0712020NAALTERNATE
DATE0912018NA0912020NAc. pRoposED  
GENERTC FUNDAMENTALS  
EXAMINATTON  
(GFE) SCHEDULEPROPOSEDNUMBERcY 2017cY 2018MARCHSEPTEMBER
MARCHSEPTEMBER
ESTIMATED
NUMBER OFCANDIDATES
00018NRC FORM s36 (0S2016)
}}

Latest revision as of 17:48, 30 October 2019

NRC Regulatory Issue Summary 2016-09 - Preparation and Scheduling of Operator Licensing Examinations
ML16197A039
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 07/15/2016
From: Simmons P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-2016-09
Download: ML16197A039 (4)


Text

Tennessee Valley Authority, 1 101 Market Street, Chattanooga, Tennessee 37402 July 15, 2016 10 cFR 50.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and2 Facility Operating License No. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391

Subject:

Nuclear Regulatory Commission (NRC) Regulatory lssue Summary (RlS) 2016 Preparation and Scheduling of Operator Licensing Examinations

Reference:

NRC RIS 2016-09, "Preparation and Scheduling of Operator Licensing Examinations," dated June 16, 2016 Regulatory lssue Summary (RlS) 2016-09 requested information regarding Watts Bar Nuclear Plant's (WBN's) projected operator licensing examination schedules and the estimated number of applicants. The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for WBN on NRC Form 536.

There are no new regulatory commitments in this letter. Should you have any questions regarding this submittal, please contact Walter Smith, Operations Training Manager at (423) 365-8081 or Gordon Arent, Director of Watts Bar Site Licensing at (423) 365-2004.

Respectfully, Paul Simmons Site Vice President Watts Bar Nuclear Plant

U.S. Nuclear Regulatory Commission Page 2 July 15, 2016

Enclosure:

NRC Form 536 - Operator Licensing Examination Data cc (Enclosure):

NRC Project Manager - Watts Bar Nuclear Plant NRC RegionalAdministrator - Region l!

cc: w/o Enclosure NRC Senior Resident lnspector

Enclosure NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Watts Bar Nuclear Plant, Units { and 2 NRG Docket Nos. 50-390 and 50-391

U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112017 Estimated burden per response to oomply with this voluntary information collection request t hour. This information collection is used to plan budgets and resources for operator examinations. Senc OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and lnfurmation Collections Branch (T-[

F53), U.S. Nuclear Regulatory Commission, Washington, 0C2055S0001, or by e-mail tc EXAMINATION DATA lnbcollects.Resource@nrc.gov, and to the Desk Officer, Office of lnformation and Regulatory Affairs NEOB-10202, (3150-0131), ffice of Management and Budget, Washington, DC 20503. lf a means used to impose an infurmation oolleclion does not display a currently valid OMB control number, the NRC may not mnduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Watts Bar Nuclear Plant, Units 1 and 2 il A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER cY39lx cY 2019 cY 2020 cY 2021 ESTIMATED NUMBER OF LICENSEE.PREPARED 1 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC.PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER cY 2018 cY 2019 cY 2020 cY 202t NUMBER OF REACTOR OPERATORS 10 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS. INSTANT 6 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS. UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS. LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 07 12018 NA 0712020 NA ALTERNATE DATE 0912018 NA 0912020 NA

c. pRoposED GENERTC FUNDAMENTALS EXAMINATTON (GFE) SCHEDULE PROPOSED cY 2017 cY 2018 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0 0 0 18 CANDIDATES NRC FORM s36 (0S2016)