{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL | {{#Wiki_filter:UNITED STATES | ||
B. Hanson -2- In accordance with Title 10 of the Code of Federal Regulations | NUCLEAR REGULATORY COMMISSION | ||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | REGION III | ||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | 2443 WARRENVILLE RD. SUITE 210 | ||
LISLE, IL 60532-4352 | |||
July 25, 2016 | |||
Mr. Bryan C. Hanson | |||
Senior VP, Exelon Generation Company, LLC | |||
President and CNO, Exelon Nuclear | |||
4300 Winfield Road | |||
Warrenville, IL 60555 | |||
SUBJECT: DRESDEN NUCLEAR PLANT, UNIT 3 - NOTIFICATION OF NRC | |||
BASELINE INSPECTION AND REQUEST FOR INFORMATION; | |||
INSPECTION REPORT 05000249/2016004 | |||
Dear Mr. Hanson: | |||
On October 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline | |||
Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed | |||
October 31, 2016, through November 4, 2016. | |||
Experience has shown that this inspection is resource intensive both for the NRC inspector and | |||
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive | |||
inspection for both sides, we have enclosed a request for documents needed for this inspection. | |||
These documents have been divided into two groups. | |||
The first group identifies information necessary to ensure that the inspector is adequately | |||
prepared. The second group identifies the information the inspector will need upon arrival at | |||
the site. It is important that all of these documents are up-to-date, and complete, in order to | |||
minimize the number of additional documents requested during the preparation and/or the | |||
onsite portions of the inspection. | |||
We have discussed the schedule for inspection activities with your staff and understand that our | |||
regulatory contact for this inspection will be Mr. DJ Walker, of your organization. If there are | |||
any questions about this inspection or the material requested, please contact the lead inspector | |||
Dr. Laura Smith at 630-829-9688, or via e-mail at Laura.Smith@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to | |||
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, Control Number | |||
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, | |||
a request for information or an information collection requirement unless the requesting | |||
document displays a currently valid Office of Management and Budget Control Number. | |||
B. Hanson -2- | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public | |||
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy | |||
of this letter and its enclosure will be available electronically for public inspection in the NRCs | |||
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's | |||
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible | |||
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic | |||
Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Laura Smith, Reactor Inspector | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos. 50-237, 50-249 | |||
License Nos. DPR-19; DPR-25 | |||
Enclosure: | |||
Baseline Inservice Inspection Document Request | |||
cc: Distribution via LISTSERV | |||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | |||
Inspection Report: 05000249/2016004 | |||
Inspection Dates: October 31, 2016 - November 4, 2016 | |||
Inspection Procedures: Inspection Procedure 71111-08, Inservice Inspection | |||
Lead Inspector: Laura Smith, DRS | |||
630-829-9688 | |||
Laura.Smith@nrc.gov | |||
I. Information for the In-Office Preparation Week | |||
The following information (electronic copy CD ROM if possible) is requested by | |||
October 17, 2016, to facilitate the selection of specific items that will be reviewed during | |||
the onsite inspection week. The inspector will select specific items from the information | |||
requested below and request a list of additional documents needed onsite to your staff. | |||
We request that the specific items selected from the lists be available and ready for | |||
review on the first day of inspection. If you have any questions regarding this | |||
information, please call the inspector as soon as possible. | |||
1. For the upcoming outage, a detailed schedule and description of: | |||
a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2 Systems | |||
and containment, performed as part of your American Society of Mechanical | |||
Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition | |||
and addenda of Code committed to), and NDEs planned for other systems | |||
performed as part of a Risk-Informed ISI Program, or other augmented | |||
inspection programs commitments, as part of an industry initiative. For each | |||
weld examination, include the weld identification number, description of weld | |||
(component name), category, class, type of exam and procedure number, and | |||
date of examination; and | |||
b. welding on Code Class 1, 2, or 3 components | |||
2. A copy of the NDE procedures and welding procedures used to perform the activities | |||
identified in A.1 (including NDE calibration and flaw characterization/sizing procedures | |||
and Welding Procedure Qualification Records). For ultrasonic examination procedures | |||
qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide | |||
documentation supporting the procedure qualification (e.g., the Electric Power | |||
Research Institute performance demonstration qualification summary sheets). | |||
3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations | |||
identified in A.1. A copy of the 10-year ISI Program showing those required exams | |||
scheduled to be performed this outage, and those which have been completed. | |||
4. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye | |||
penetrant), which have identified relevant indications on Code Class 1 and 2 | |||
Systems since the beginning of the last refueling outage. | |||
Enclosure | |||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | |||
5. List with short description of the welds in Code Class 1 and 2 Systems, which have | |||
been fabricated due to component repair/replacement activities since the beginning | |||
of the last refueling outage and identify the system, weld number, and reference | |||
applicable documentation (e.g., NIS-2 forms with definitions of system and | |||
component acronyms). | |||
6. If reactor vessel weld examinations required by the ASME Code are scheduled to | |||
occur during the inspection period, provide a detailed description of the welds to be | |||
examined, and the extent of the planned examination. | |||
7. List with description of ISI related issues such as piping degradation or damage | |||
(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors | |||
identified in piping examinations that have been entered into your corrective action | |||
system since the beginning of the last refueling outage. Also, include a list of | |||
corrective action records associated with foreign material introduced/identified in | |||
the reactor vessel or reactor coolant system since the beginning of the last refueling | |||
outage. | |||
8. Copy of any Title 10 Code of Federal Regulations, Part 21 reports applicable to your | |||
structures, systems, or components within the scope of Section XI of the ASME | |||
Code that have been identified since the beginning of the last refueling outage. | |||
II. Onsite Information to be Provided to the Inspector on the First Day of the | |||
Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies | |||
(e.g., Paper Records) of the Following Documents. | |||
1. For welds selected by the inspector from A.1.b and A.6 above, provide copies of the | |||
following documents: | |||
a. Document of the weld number and location (e.g., system, train, branch); | |||
b. Document with a detail of the weld construction (e.g., drawing); | |||
c. Applicable Code Edition and Addenda for construction of the weldment | |||
(e.g., B31.1 or ASME Section III); | |||
d. Applicable Code Edition and Addenda for weld procedure qualification; | |||
e. Applicable weld procedures and completed weld data sheets used to fabricate | |||
the welds; | |||
f. Copies of procedure qualification records supporting the weld procedures; | |||
g. Copies of welders performance qualification records; | |||
h. Copies of mechanical test reports identified in the procedure qualification | |||
records above; | |||
i. Copies of the non-conformance reports for the selected welds; | |||
j. Access to radiographs and equipment to view radiographs of the selected welds; | |||
and | |||
k. Copies of the pre-service examination records for the selected welds. | |||
2 | |||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | |||
2. For the ISI-related corrective action issues selected by the inspector from Item A.7 | |||
above, provide a copy of the corrective actions and supporting documentation. | |||
3. For the NDE reports with relevant indications on Code Class 1 and 2 Systems | |||
selected by the inspector from Item A.4 above, provide a copy of the examination | |||
records and associated corrective action documents. | |||
4. Updated schedules for Item A.1 (including schedule showing contingency repair | |||
plans if available). | |||
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined | |||
during the outage. Also provide any drawings used by NDE vendors to locate these | |||
welds. | |||
6. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory | |||
Commission inspection location for the duration of the inspection: | |||
a. Sections V, IX, and XI of the ASME Code with Editions applicable to the | |||
Inservice Inspection Program and the Repair/Replacement Program; and | |||
b. Copy of the performance demonstration initiative (PDI) generic procedures with | |||
the latest applicable Revisions that support site qualified ultrasonic examination | |||
of piping welds and components (e.g., PDI-UT-1, PDI-UT-2, PDI-UT-3, PDI-UT- | |||
10 etc.). | |||
7. Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if | |||
required to access the NDEs selected by the inspector for observation. | |||
If you have questions regarding the information requested, please contact the lead inspector. | |||
3 | |||
B. Hanson -2- | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public | |||
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy | |||
of this letter and its enclosure will be available electronically for public inspection in the NRCs | |||
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's | |||
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible | |||
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic | |||
Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Laura Smith, Reactor Inspector | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos. 50-237, 50-249 | |||
License Nos. DPR-19; DPR-25 | |||
Enclosure: | |||
Baseline Inservice Inspection Document Request | |||
cc: Distribution via LISTSERV | |||
DISTRIBUTION: | |||
Jeremy Bowen | |||
RidsNrrDorlLpl3-2 Resource | |||
RidsNrrPMDresden Resource | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Darrell Roberts | |||
Richard Skokowski | |||
Allan Barker | |||
Carole Ariano | |||
Linda Linn | |||
DRPIII | |||
DRSIII | |||
ADAMS Accession Number ML16208A028 | |||
Publicly Available Non-Publicly Available Sensitive Non-Sensitive | |||
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | |||
OFFICE RIII RIII RIII RIII | |||
NAME LSmith:cl | |||
DATE 07/25/16 | |||
OFFICIAL RECORD COPY | |||
}} | }} |
Revision as of 16:14, 30 October 2019
ML16208A028 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 07/25/2016 |
From: | Laura Smith NRC/RGN-III/DRS/EB1 |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
References | |
IR 2016004 | |
Download: ML16208A028 (6) | |
See also: IR 05000249/2016004
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
July 25, 2016
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: DRESDEN NUCLEAR PLANT, UNIT 3 - NOTIFICATION OF NRC
BASELINE INSPECTION AND REQUEST FOR INFORMATION;
INSPECTION REPORT 05000249/2016004
Dear Mr. Hanson:
On October 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline
Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed
October 31, 2016, through November 4, 2016.
Experience has shown that this inspection is resource intensive both for the NRC inspector and
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive
inspection for both sides, we have enclosed a request for documents needed for this inspection.
These documents have been divided into two groups.
The first group identifies information necessary to ensure that the inspector is adequately
prepared. The second group identifies the information the inspector will need upon arrival at
the site. It is important that all of these documents are up-to-date, and complete, in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for inspection activities with your staff and understand that our
regulatory contact for this inspection will be Mr. DJ Walker, of your organization. If there are
any questions about this inspection or the material requested, please contact the lead inspector
Dr. Laura Smith at 630-829-9688, or via e-mail at Laura.Smith@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
B. Hanson -2-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter and its enclosure will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Sincerely,
/RA/
Laura Smith, Reactor Inspector
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-237, 50-249
Enclosure:
Baseline Inservice Inspection Document Request
cc: Distribution via LISTSERV
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Report: 05000249/2016004
Inspection Dates: October 31, 2016 - November 4, 2016
Inspection Procedures: Inspection Procedure 71111-08, Inservice Inspection
Lead Inspector: Laura Smith, DRS
630-829-9688
Laura.Smith@nrc.gov
I. Information for the In-Office Preparation Week
The following information (electronic copy CD ROM if possible) is requested by
October 17, 2016, to facilitate the selection of specific items that will be reviewed during
the onsite inspection week. The inspector will select specific items from the information
requested below and request a list of additional documents needed onsite to your staff.
We request that the specific items selected from the lists be available and ready for
review on the first day of inspection. If you have any questions regarding this
information, please call the inspector as soon as possible.
1. For the upcoming outage, a detailed schedule and description of:
a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2 Systems
and containment, performed as part of your American Society of Mechanical
Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition
and addenda of Code committed to), and NDEs planned for other systems
performed as part of a Risk-Informed ISI Program, or other augmented
inspection programs commitments, as part of an industry initiative. For each
weld examination, include the weld identification number, description of weld
(component name), category, class, type of exam and procedure number, and
date of examination; and
b. welding on Code Class 1, 2, or 3 components
2. A copy of the NDE procedures and welding procedures used to perform the activities
identified in A.1 (including NDE calibration and flaw characterization/sizing procedures
and Welding Procedure Qualification Records). For ultrasonic examination procedures
qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide
documentation supporting the procedure qualification (e.g., the Electric Power
Research Institute performance demonstration qualification summary sheets).
3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations
identified in A.1. A copy of the 10-year ISI Program showing those required exams
scheduled to be performed this outage, and those which have been completed.
4. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye
penetrant), which have identified relevant indications on Code Class 1 and 2
Systems since the beginning of the last refueling outage.
Enclosure
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
5. List with short description of the welds in Code Class 1 and 2 Systems, which have
been fabricated due to component repair/replacement activities since the beginning
of the last refueling outage and identify the system, weld number, and reference
applicable documentation (e.g., NIS-2 forms with definitions of system and
component acronyms).
6. If reactor vessel weld examinations required by the ASME Code are scheduled to
occur during the inspection period, provide a detailed description of the welds to be
examined, and the extent of the planned examination.
7. List with description of ISI related issues such as piping degradation or damage
(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors
identified in piping examinations that have been entered into your corrective action
system since the beginning of the last refueling outage. Also, include a list of
corrective action records associated with foreign material introduced/identified in
the reactor vessel or reactor coolant system since the beginning of the last refueling
outage.
8. Copy of any Title 10 Code of Federal Regulations, Part 21 reports applicable to your
structures, systems, or components within the scope of Section XI of the ASME
Code that have been identified since the beginning of the last refueling outage.
II. Onsite Information to be Provided to the Inspector on the First Day of the
Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies
(e.g., Paper Records) of the Following Documents.
1. For welds selected by the inspector from A.1.b and A.6 above, provide copies of the
following documents:
a. Document of the weld number and location (e.g., system, train, branch);
b. Document with a detail of the weld construction (e.g., drawing);
c. Applicable Code Edition and Addenda for construction of the weldment
(e.g., B31.1 or ASME Section III);
d. Applicable Code Edition and Addenda for weld procedure qualification;
e. Applicable weld procedures and completed weld data sheets used to fabricate
the welds;
f. Copies of procedure qualification records supporting the weld procedures;
g. Copies of welders performance qualification records;
h. Copies of mechanical test reports identified in the procedure qualification
records above;
i. Copies of the non-conformance reports for the selected welds;
j. Access to radiographs and equipment to view radiographs of the selected welds;
and
k. Copies of the pre-service examination records for the selected welds.
2
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
2. For the ISI-related corrective action issues selected by the inspector from Item A.7
above, provide a copy of the corrective actions and supporting documentation.
3. For the NDE reports with relevant indications on Code Class 1 and 2 Systems
selected by the inspector from Item A.4 above, provide a copy of the examination
records and associated corrective action documents.
4. Updated schedules for Item A.1 (including schedule showing contingency repair
plans if available).
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined
during the outage. Also provide any drawings used by NDE vendors to locate these
6. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory
Commission inspection location for the duration of the inspection:
a. Sections V, IX, and XI of the ASME Code with Editions applicable to the
Inservice Inspection Program and the Repair/Replacement Program; and
b. Copy of the performance demonstration initiative (PDI) generic procedures with
the latest applicable Revisions that support site qualified ultrasonic examination
of piping welds and components (e.g., PDI-UT-1, PDI-UT-2, PDI-UT-3, PDI-UT-
10 etc.).
7. Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if
required to access the NDEs selected by the inspector for observation.
If you have questions regarding the information requested, please contact the lead inspector.
3
B. Hanson -2-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter and its enclosure will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Sincerely,
/RA/
Laura Smith, Reactor Inspector
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-237, 50-249
Enclosure:
Baseline Inservice Inspection Document Request
cc: Distribution via LISTSERV
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource
RidsNrrPMDresden Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ADAMS Accession Number ML16208A028
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII RIII RIII
NAME LSmith:cl
DATE 07/25/16
OFFICIAL RECORD COPY