| number = ML17004A177
| number = ML17004A177
| issue date = 01/04/2017
| issue date = 01/04/2017
| title = Comanche Peak Nuclear Power Plant - Notification of NRC Triennial Heat Sink Performance Inspection (05000445/2017001 and 05000446/2017001) and Request for Information
| title = Notification of NRC Triennial Heat Sink Performance Inspection (05000445/2017001 and 05000446/2017001) and Request for Information
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Peters K J
| addressee name = Peters K
| addressee affiliation = TEX Operations Company, LLC
| addressee affiliation = TEX Operations Company, LLC
| docket = 05000445, 05000446
| docket = 05000445, 05000446
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000445/2017001]]
See also: [[see also::IR 05000445/2017001]]


=Text=
=Text=
{{#Wiki_filter:January 4, 2017  
{{#Wiki_filter:UNITED STATES
  Mr. Ken J. Peters, Senior Vice President  
                            NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                                          1600 E. LAMAR BLVD
                                        ARLINGTON, TX 76011-4511
                                            January 4, 2017
Mr. Ken J. Peters, Senior Vice President
  and Chief Nuclear Officer
Attention: Regulatory Affairs
TEX Operations Company LLC
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT:        COMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC
                TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000445/2017001
                AND 05000446/2017001) AND REQUEST FOR INFORMATION
Dear Mr. Peters:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct a triennial heat sink performance inspection at your Comanche Peak Nuclear
Power Plant, Units 1 and 2, from January 30, 2017, through February 3, 2017. The inspection
will consist of two reactor inspectors from the NRCs Region IV office for one week. The
inspection will be conducted in accordance with NRC Inspection Procedure 71111.07, Heat
Sink Performance.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by January 23, 2017. We request
that during the on-site inspection week you ensure that copies of analyses, evaluations, or
documentation regarding the implementation and maintenance of your heat exchanger program
are available. Of specific interest are those documents that establish that your heat exchanger
program satisfies NRC regulatory requirements and conforms to applicable NRC guidance.
Also, appropriate personnel knowledgeable of safety-related heat exchangers should be
available to support the inspector at the site during the inspection.
We have discussed the schedule for this inspection activity with your staff and understand that
our regulatory contact for this inspection will be Gary Merka of your licensing organization. If
there are any questions about this inspection or the material requested, please contact the
inspector, Jonathan Braisted, by telephone at 817-200-1194 or by e-mail at
Jonathan.Braisted@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to


  and Chief Nuclear Officer
K. Peters                                        2
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
this letter and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
                                                  /RA/
                                                  Thomas R. Farnholtz, Chief
                                                  Engineering Branch 1
                                                  Division of Reactor Safety
Docket Nos. 50-445 and 50-446
License Nos. NPF-87 and NPF-89
Enclosure:
Triennial Heat Sink Performance
  Inspection Request for Information
cc: Electronic Distribution


Attention:  Regulatory Affairs
TEX Operations Company LLC
P.O. Box 1002 Glen Rose, TX  76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000445/2017001
AND 05000446/2017001)
AND REQUEST FOR INFORMATION
Dear Mr. Peters: 


   
  ML17004A177
The purpose of this letter is to notify you that
  SUNSI Review            ADAMS          Publicly Available      Non-Sensitive Keyword:
U.S. Nuclear Regulatory Commission (NRC) staff will conduct a triennial heat sink performance inspection at your Comanche Peak Nuclear  
By: JBraisted              Yes  No      Non-Publicly Available  Sensitive    NRC-002
Power Plant, Units 1 and 2, from January 30, 2017, through February 3, 2017. The inspection will consist of two reactor inspectors from the NRC's Region IV office for one week. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.07, "Heat  
OFFICE        RI:EB1    C:EB1
Sink Performance."
NAME          JBraisted  TFarnholtz
SIGNATURE      /RA/      /RA/
DATE          1/4/17    1/4/17
                                     
                                      Request for Information
                          Triennial Heat Sink Performance Inspection
                              Comanche Peak Nuclear Power Plant
Inspection Reports:              05000445/2017001 and 05000446/2017001
Inspection Dates:                January 30, 2017, through February 3, 2017
Inspection Procedure:            IP 71111.07, Triennial Heat Sink Performance
Inspectors:                      J. Braisted, Reactor Inspector
                                C. Smith, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (Certrec IMS preferred), to the attention of Jonathan Braisted, by January 16, 2017. The
inspector will select specific items from the information requested below and then request from
your staff additional documents needed during the on-site inspection week. We also request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspector, and provide subject
documentation during the first day of the on-site inspection. If you have any questions
regarding this information request, please call the lead inspector as soon as possible.
The following heat exchangers/heat sinks have been selected for inspection:
    *  Ultimate Heat Sink
    *  Residual Heat Removal Heat Exchanger 2-01
    *  Component Cooling Water Heat Exchanger 2-01
    *  Safety Chilled Water System Centrifugal Chiller 2-05
For all Generic Letter 89-13 exchangers:
    1. List of corrective action program documents (with a short description) associated with
        Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
        exchanger cavitation, or heat exchanger testing, in the previous three years
    2. System health report(s) and maintenance rule system notebooks for all the Generic
        Letter 89-13 heat exchangers
    3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the
        previous three years
                                                                                Enclosure


  4. Copies of any heat exchanger program procedure and procedures developed to
Experience has shown that this
      implement the recommendations of Generic Letter 89-13 (e.g., the Generic Letter 89-13
inspection is resource intens
      Heat Exchanger Program description)
ive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
  5. Copies of any commitments to the Generic Letter 89-13 program
Please note that the documents are requested to be provided by January 23, 2017.  We request that during the on-site inspection week you ensure that copies of analyses, evaluations, or documentation regarding the implementation and m
  6. Schedule of any work to be performed on the selected samples during the inspection
aintenance of your heat exchanger program are available. Of specific interest are those documents that establish that your heat exchanger  
For the specific heat exchangers selected:
program satisfies NRC regulatory requirement
  Testing Documents
s and conforms to applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should be
  7. Copies of the two most recently completed tests confirming thermal performance for
available to support the inspector at the site during the inspection.  
      those heat exchangers which are performance tested
  8. Instrument uncertainties of the instruments used during testing
  9. Copy of any operability determinations or other documentation of degradation
      associated with the heat exchangers or the systems that support the operation for the
      selected heat exchangers
  10. Documents that show the as-found results are recorded, evaluated, and appropriately
      dispositioned such that the as-left condition is acceptable
  Cleaning Documents
  11. The cleaning and inspection maintenance schedule for each heat exchanger for the next
      five years
  12. Copy of the document describing the inspection results for the last two cleaning and
      inspection activities completed on each heat exchanger
  13. Cleaning procedures with acceptance criteria for the selected heat exchangers
  14. Copies of the documents that verify the structural integrity of the heat exchanger,
      (e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection
      results)
  15. Copies of those documents that describe the methods taken to control water chemistry
      in the heat exchangers
  Design Documents
  16. Copies of the design basis documents and applicable pages from the updated final
      safety analysis report and technical specifications for the selected heat exchangers
  17. Provide a list of calculations with a description which currently apply to each heat
      exchanger
                                                -2-


  18. Copies of vendor manuals and data sheets and design basis data for the selected heat
We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Gary Merka of your licensing organization.  If there are any questions about this inspection or the material requested, please contact the  
      exchangers
inspector, Jonathan Braisted, by telephone at 817-200-1194 or by e-mail at
  19. Copy of the calculation which establishes the limiting (maximum) design basis heat load
Jonathan.Braisted@nrc.gov.  
      which is required to be removed by each of these heat exchangers
  20. Copy of the calculation which correlates surveillance testing results from these heat
      exchangers with design basis heat removal capability (e.g., basis for surveillance test
      acceptance criteria)
  21. Copy of the calculations or documents which evaluate the potential for water hammer or
      excessive tube vibration in the heat exchanger or associated piping
  22. Copy of the document which identifies the current number of tubes in service for each
      heat exchanger and the supporting calculation which establishes the maximum number
      of tubes which can be plugged in each heat exchanger
  23. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes
      which are identified in each heat exchanger
For the ultimate heat sink or safety-related service water system:
  24. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)
  25. Copies of calculations and surveillances that determine the ultimate heat sink reservoir
      capacity and heat transfer capability (if applicable)
  26. Copies of any design changes performed on the ultimate heat sink or safety-related
      service water system
  27. Copies of procedures for a loss of ultimate heat sink or safety-related service water
      system
  28. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells,
      debris, etc.) and aquatic life
  29. Copies of inspections and/or maintenance-related to preventing biotic fouling
  30. Copies of procedures and/or test results to survey or monitor interface valves between
      the safety-related section of the service water system and the nonsafety-related section
  31. Copy of the most recent service water flow balance test results, both as-found and as-
      left
  32. History of any thru-wall pipe leaks on the safety-related service water system
                                                -3-


This letter does not contain new or amended information collection requirements subject  to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information
Inspector Contact Information:
collection requirements were approved by the Office of Management and Budget, control
Jonathan Braisted             Chris Smith
number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to
Reactor Inspector             Reactor Inspector
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
817-200-1194                   817-200-1095
K. Peters 2
Jonathan.Braisted@nrc.gov     Chris.Smith@nrc.gov
respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control
Mailing Address:
 
U.S. NRC, Region IV
number.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
Attn: Jonathan Braisted
 
1600 East Lamar Blvd.
this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Arlington, TX 76011-4511
Sincerely,  /RA/ 
                                        -4-
Thomas R. Farnholtz, Chief  Engineering Branch 1
Division of Reactor Safety
 
Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89
 
Enclosure: 
Triennial Heat Sink Performance 
  Inspection Request for Information
cc:  Electronic Distribution
 
 
 
  ML17004A177  SUNSI Review By:  JBraisted
ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE RI:EB1 C:EB1      NAME JBraisted TFarnholtz      SIGNATURE /RA/ /RA/      DATE 1/4/17 1/4/17     
  Enclosure
Request for Information
Triennial Heat Sink Performance Inspection  Comanche Peak Nuclear Power Plant
 
Inspection Reports:  05000445/2017001 and 05000446/2017001
 
Inspection Dates:  January 30, 2017, through February 3, 2017
 
Inspection Procedure:  IP 71111.07, Triennial Heat Sink Performance
Inspectors:  J. Braisted, Reactor Inspector C. Smith, Reactor Inspector
  Information Requested for the In-Office Preparation Week
  The following information should be sent to the Region IV office in hard copy or electronic
format (Certrec IMS preferred), to the attention of Jonathan Braisted, by January 16, 2017.  The inspector will select specific items from t
he information requested below and then request from your staff additional documents needed during the on-site inspection week.  We also request
that you categorize the documents in your response with the numbered list below.  Please provide requested documentation electronically if possible.  If requested documents are large
and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the on-site inspection.  If you have any questions regarding this information request, please call the lead inspector as soon as possible.
The following heat exchangers/heat sinks have been selected for inspection:
 
* Ultimate Heat Sink
* Residual Heat Removal Heat Exchanger 2-01
* Component Cooling Water Heat Exchanger 2-01
* Safety Chilled Water System Centrifugal Chiller 2-05
For all Generic Letter 89-13 exchangers
:  1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
 
exchanger cavitation, or heat exchanger testing, in the previous three years
 
2. System health report(s) and maintenance rule system notebooks for all the Generic
Letter 89-13 heat exchangers 
3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the
previous three years 
 
  - 2 -  4. Copies of any heat exchanger program procedure and procedures developed to implement the recommendations of Generic Letter 89-13 (e.g., the Generic Letter 89-13
Heat Exchanger Program description) 
5. Copies of any commitments to the Generic Letter 89-13 program
6. Schedule of any work to be performed on the selected samples during the inspection
For the specific heat exchangers selected:
Testing Documents
7. Copies of the two most recently completed tests confirming thermal performance for those heat exchangers which are performance tested 
8. Instrument uncertainties of the instruments used during testing
9. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the
selected heat exchangers 
10. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable
Cleaning Documents
11. The cleaning and inspection maintenance schedule for each heat exchanger for the next
five years 
12. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger 
13. Cleaning procedures with acceptance criteria for the selected heat exchangers
14. Copies of the documents that verify the structural integrity of the heat exchanger, (e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results) 
15. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers 
Design Documents
16. Copies of the design basis documents and applicable pages from the updated final safety analysis report and technical specifications for the selected heat exchangers 
17. Provide a list of calculations with a description which currently apply to each heat
exchanger 
 
 
  - 3 -  18. Copies of vendor manuals and data sheets and design basis data for the selected heat
exchangers 
19. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers 
20. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test
acceptance criteria)
21. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping 
22. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger 
23. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger
  For the ultimate heat sink or safety-related service water system: 
24. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)
25. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable)
26. Copies of any design changes performed on the ultimate heat sink or safety-related service water system 
27. Copies of procedures for a loss of ultimate heat sink or safety-related service water system  28. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life
29. Copies of inspections and/or maintenance-related to preventing biotic fouling 
30. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety-related section 
31. Copy of the most recent service water flow balance test results, both as-found and as-
left  32. History of any thru-wall pipe leaks on the safety-related service water system 
 
 
  - 4 -  Inspector Contact Information:  
 
Jonathan Braisted   Chris Smith Reactor Inspector   Reactor Inspector  
817-200-1194   817-200-1095  
Jonathan.Braisted@nrc.gov Chris.Smith@nrc.gov  
 
Mailing Address:  
U.S. NRC, Region IV  
Attn: Jonathan Braisted
1600 East Lamar Blvd. Arlington, TX 76011-4511
}}
}}

Latest revision as of 09:44, 30 October 2019

Notification of NRC Triennial Heat Sink Performance Inspection (05000445/2017001 and 05000446/2017001) and Request for Information
ML17004A177
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/04/2017
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Peters K
TEX Operations Company
References
IR 2017001
Download: ML17004A177 (7)


See also: IR 05000445/2017001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

January 4, 2017

Mr. Ken J. Peters, Senior Vice President

and Chief Nuclear Officer

Attention: Regulatory Affairs

TEX Operations Company LLC

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000445/2017001

AND 05000446/2017001) AND REQUEST FOR INFORMATION

Dear Mr. Peters:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct a triennial heat sink performance inspection at your Comanche Peak Nuclear

Power Plant, Units 1 and 2, from January 30, 2017, through February 3, 2017. The inspection

will consist of two reactor inspectors from the NRCs Region IV office for one week. The

inspection will be conducted in accordance with NRC Inspection Procedure 71111.07, Heat

Sink Performance.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by January 23, 2017. We request

that during the on-site inspection week you ensure that copies of analyses, evaluations, or

documentation regarding the implementation and maintenance of your heat exchanger program

are available. Of specific interest are those documents that establish that your heat exchanger

program satisfies NRC regulatory requirements and conforms to applicable NRC guidance.

Also, appropriate personnel knowledgeable of safety-related heat exchangers should be

available to support the inspector at the site during the inspection.

We have discussed the schedule for this inspection activity with your staff and understand that

our regulatory contact for this inspection will be Gary Merka of your licensing organization. If

there are any questions about this inspection or the material requested, please contact the

inspector, Jonathan Braisted, by telephone at 817-200-1194 or by e-mail at

Jonathan.Braisted@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

K. Peters 2

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-445 and 50-446

License Nos. NPF-87 and NPF-89

Enclosure:

Triennial Heat Sink Performance

Inspection Request for Information

cc: Electronic Distribution

ML17004A177

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: JBraisted Yes No Non-Publicly Available Sensitive NRC-002

OFFICE RI:EB1 C:EB1

NAME JBraisted TFarnholtz

SIGNATURE /RA/ /RA/

DATE 1/4/17 1/4/17

Request for Information

Triennial Heat Sink Performance Inspection

Comanche Peak Nuclear Power Plant

Inspection Reports: 05000445/2017001 and 05000446/2017001

Inspection Dates: January 30, 2017, through February 3, 2017

Inspection Procedure: IP 71111.07, Triennial Heat Sink Performance

Inspectors: J. Braisted, Reactor Inspector

C. Smith, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (Certrec IMS preferred), to the attention of Jonathan Braisted, by January 16, 2017. The

inspector will select specific items from the information requested below and then request from

your staff additional documents needed during the on-site inspection week. We also request

that you categorize the documents in your response with the numbered list below. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector, and provide subject

documentation during the first day of the on-site inspection. If you have any questions

regarding this information request, please call the lead inspector as soon as possible.

The following heat exchangers/heat sinks have been selected for inspection:

  • Component Cooling Water Heat Exchanger 2-01
  • Safety Chilled Water System Centrifugal Chiller 2-05

For all Generic Letter 89-13 exchangers:

1. List of corrective action program documents (with a short description) associated with

Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat

exchanger cavitation, or heat exchanger testing, in the previous three years

2. System health report(s) and maintenance rule system notebooks for all the Generic

Letter 89-13 heat exchangers

3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the

previous three years

Enclosure

4. Copies of any heat exchanger program procedure and procedures developed to

implement the recommendations of Generic Letter 89-13 (e.g., the Generic Letter 89-13

Heat Exchanger Program description)

5. Copies of any commitments to the Generic Letter 89-13 program

6. Schedule of any work to be performed on the selected samples during the inspection

For the specific heat exchangers selected:

Testing Documents

7. Copies of the two most recently completed tests confirming thermal performance for

those heat exchangers which are performance tested

8. Instrument uncertainties of the instruments used during testing

9. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation for the

selected heat exchangers

10. Documents that show the as-found results are recorded, evaluated, and appropriately

dispositioned such that the as-left condition is acceptable

Cleaning Documents

11. The cleaning and inspection maintenance schedule for each heat exchanger for the next

five years

12. Copy of the document describing the inspection results for the last two cleaning and

inspection activities completed on each heat exchanger

13. Cleaning procedures with acceptance criteria for the selected heat exchangers

14. Copies of the documents that verify the structural integrity of the heat exchanger,

(e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection

results)

15. Copies of those documents that describe the methods taken to control water chemistry

in the heat exchangers

Design Documents

16. Copies of the design basis documents and applicable pages from the updated final

safety analysis report and technical specifications for the selected heat exchangers

17. Provide a list of calculations with a description which currently apply to each heat

exchanger

-2-

18. Copies of vendor manuals and data sheets and design basis data for the selected heat

exchangers

19. Copy of the calculation which establishes the limiting (maximum) design basis heat load

which is required to be removed by each of these heat exchangers

20. Copy of the calculation which correlates surveillance testing results from these heat

exchangers with design basis heat removal capability (e.g., basis for surveillance test

acceptance criteria)

21. Copy of the calculations or documents which evaluate the potential for water hammer or

excessive tube vibration in the heat exchanger or associated piping

22. Copy of the document which identifies the current number of tubes in service for each

heat exchanger and the supporting calculation which establishes the maximum number

of tubes which can be plugged in each heat exchanger

23. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes

which are identified in each heat exchanger

For the ultimate heat sink or safety-related service water system:

24. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)

25. Copies of calculations and surveillances that determine the ultimate heat sink reservoir

capacity and heat transfer capability (if applicable)

26. Copies of any design changes performed on the ultimate heat sink or safety-related

service water system

27. Copies of procedures for a loss of ultimate heat sink or safety-related service water

system

28. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells,

debris, etc.) and aquatic life

29. Copies of inspections and/or maintenance-related to preventing biotic fouling

30. Copies of procedures and/or test results to survey or monitor interface valves between

the safety-related section of the service water system and the nonsafety-related section

31. Copy of the most recent service water flow balance test results, both as-found and as-

left

32. History of any thru-wall pipe leaks on the safety-related service water system

-3-

Inspector Contact Information:

Jonathan Braisted Chris Smith

Reactor Inspector Reactor Inspector

817-200-1194 817-200-1095

Jonathan.Braisted@nrc.gov Chris.Smith@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Jonathan Braisted

1600 East Lamar Blvd.

Arlington, TX 76011-4511

-4-