ML17201Q527: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 05/23/2017 | | issue date = 05/23/2017 | ||
| title = 2017 Point Beach Nuclear Plant Initial License Examination Forms ES-301-5 Revision 0 | | title = 2017 Point Beach Nuclear Plant Initial License Examination Forms ES-301-5 Revision 0 | ||
| author name = Seymour J | | author name = Seymour J | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:ES-301 Transient and Event Checklist - Group 1 Form ES-301-5 Facility: Point Beach Date of Exam: May 8 - 19, 2017 Operating Test No.: 2017 A E Scenarios P V 1 2 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I | |||
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*) | |||
T P E R I U RO RX 4 2 2 1 1 0 NOR 1, 2 2 1 1 1 SRO-I I/C 1, 2, 5 3, 4, 8 | |||
3, 5, 7 9 4 4 2 SRO-U 6 6 6 MAJ 3 2 2 1 TS 1, 3 2 0 2 2 SRO-I 1 RO RX 4 2 2 1 1 0 NOR 1 1, 2 3 1 1 1 SRO-I I/C 5 3, 4, 5 4, 8 6 4 4 2 SRO-U MAJ 6 6 6 3 2 2 1 TS 3, 4 2 0 2 2 SRO-I 2 RO RX 2 2 2 1 1 0 NOR 4 1 2 1 1 1 SRO-I I/C 1, 2, 7, 8 5, 7 3, 4, 5 9 4 4 2 SRO-U 6 6 6 MAJ 3 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-I 3 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions: | |||
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. | |||
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls. | |||
ES-301 Transient and Event Checklist - Group 2 Form ES-301-5 Facility: Point Beach Date of Exam: May 8 - 19, 2017 Operating Test No.: 2017 A E Scenarios P V 1 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I | |||
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*) | |||
T P E R I U RO RX 4 2 2 1 1 0 NOR 3 1 1 1 1 SRO-I I/C 1, 2, 5 1, 2, 4 | |||
3, 5, 7 9 4 4 2 SRO-U 6 5 6 MAJ 3 2 2 1 TS 1, 3 2 0 2 2 SRO-I 4 RO RX 4 3 2 1 1 0 NOR 1, 2 2 1 1 1 SRO-I I/C 5 1, 2, 4 4, 8 6 4 4 2 SRO-U MAJ 6 5 6 3 2 2 1 TS 1, 3, 4 3 0 2 2 SRO-I 5 RO RX 3 2 2 1 1 0 NOR 4 1 2 1 1 1 SRO-I I/C 1, 2, 7, 8 6, 7, 8 3, 4, 5 10 4 4 2 SRO-U 6 5 6 MAJ 3 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-I 6 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions: | |||
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. | |||
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls. | |||
ES-301 Transient and Event Checklist - Group 3 Form ES-301-5 Facility: Point Beach Date of Exam: May 8 - 19, 2017 Operating Test No.: 2017 A E Scenarios P V 1 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I | |||
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*) | |||
T P E R I U RO RX 4 3 2 3 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 1, 2, 5 6, 7, 8 3, 4, 5 9 4 4 2 SRO-U MAJ 6 5 6 3 2 2 1 TS 1, 3 3, 4, 5 5 0 2 2 SRO-I 7 RO RX 4 3 2 1 1 0 NOR 1, 2 2 1 1 1 SRO-I I/C 5 1, 2, 4 4, 8 6 4 4 2 SRO-U MAJ 6 5 6 3 2 2 1 TS 1, 3, 4 3 0 2 2 SRO-I 8 RO RX 2 1 1 1 0 NOR 4 3 2 1 1 1 SRO-I 1, 2, 1, 2, 3, 5, 7 I/C 10 4 4 2 7, 8 4 SRO-U 6 5 6 MAJ 3 2 2 1 TS 0 0 2 2 RO 1 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions: | |||
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. | |||
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls. | |||
ES-301 Transient and Event Checklist - Group 4 Form ES-301-5 Facility: Point Beach Date of Exam: May 8 - 19, 2017 Operating Test No.: 2017 A E Scenarios P V 2 3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I | |||
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*) | |||
T P E R I U RO RX 2 1 1 1 0 NOR 1 3 2 1 1 1 SRO-I I/C 3, 4, 5 1, 2, 6 4 4 2 4 | |||
SRO-U MAJ 6 5 2 2 2 1 3, 4 SRO-U 1 TS 2 0 2 2 RO RX 3 1 1 1 0 NOR 2 1 1 1 1 SRO-I I/C 5, 7 1, 2, 4 5 4 4 2 SRO-U MAJ 6 5 2 2 2 1 TS 1, 3, 4 3 0 2 2 SRO-I 9 RO RX 2 3 2 1 1 0 NOR 1 1 1 1 1 SRO-I 3, 4, 6, 7, 8 I/C 6 4 4 2 8 | |||
SRO-U 6 5 MAJ 2 2 2 1 TS 0 0 2 2 RO 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions: | |||
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. | |||
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls. | |||
ES-301 Transient and Event Checklist - Group 5 Form ES-301-5 Facility: Point Beach Date of Exam: May 8 - 19, 2017 Operating Test No.: 2017 A E Scenarios P V 2 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I | |||
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*) | |||
T P E R I U RO RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 3, 4, 5 3 4 4 2 SRO-U MAJ 6 1 2 2 1 TS 3, 4 2 0 2 2 SRO-U 2 RO RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 3, 4, 5 3 4 4 2 SRO-U MAJ 6 1 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-U 3 RO RX 2 1 1 1 0 NOR 1, 2 2 1 1 1 SRO-I 5, 7 4, 8 I/C 4 4 4 2 SRO-U MAJ 6 6 2 2 2 1 TS 0 0 2 2 RO 3 RO RX 2 1 1 1 0 NOR 1, 2 2 1 1 1 SRO-I 3, 4, 3, 5, 7 I/C 6 4 4 2 8 | |||
SRO-U 6 6 MAJ 2 2 2 1 TS 0 0 2 2 RO 4 Instructions: | |||
: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. | |||
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. | |||
: 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns. | |||
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}} |
Latest revision as of 00:53, 30 October 2019
ML17201Q527 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 05/23/2017 |
From: | Jesse Seymour Operations Branch III |
To: | Point Beach |
Shared Package | |
ML16319A342 | List: |
References | |
Download: ML17201Q527 (5) | |
Text
ES-301 Transient and Event Checklist - Group 1 Form ES-301-5 Facility: Point Beach Date of Exam: May 8 - 19, 2017 Operating Test No.: 2017 A E Scenarios P V 1 2 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 4 2 2 1 1 0 NOR 1, 2 2 1 1 1 SRO-I I/C 1, 2, 5 3, 4, 8
3, 5, 7 9 4 4 2 SRO-U 6 6 6 MAJ 3 2 2 1 TS 1, 3 2 0 2 2 SRO-I 1 RO RX 4 2 2 1 1 0 NOR 1 1, 2 3 1 1 1 SRO-I I/C 5 3, 4, 5 4, 8 6 4 4 2 SRO-U MAJ 6 6 6 3 2 2 1 TS 3, 4 2 0 2 2 SRO-I 2 RO RX 2 2 2 1 1 0 NOR 4 1 2 1 1 1 SRO-I I/C 1, 2, 7, 8 5, 7 3, 4, 5 9 4 4 2 SRO-U 6 6 6 MAJ 3 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-I 3 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist - Group 2 Form ES-301-5 Facility: Point Beach Date of Exam: May 8 - 19, 2017 Operating Test No.: 2017 A E Scenarios P V 1 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 4 2 2 1 1 0 NOR 3 1 1 1 1 SRO-I I/C 1, 2, 5 1, 2, 4
3, 5, 7 9 4 4 2 SRO-U 6 5 6 MAJ 3 2 2 1 TS 1, 3 2 0 2 2 SRO-I 4 RO RX 4 3 2 1 1 0 NOR 1, 2 2 1 1 1 SRO-I I/C 5 1, 2, 4 4, 8 6 4 4 2 SRO-U MAJ 6 5 6 3 2 2 1 TS 1, 3, 4 3 0 2 2 SRO-I 5 RO RX 3 2 2 1 1 0 NOR 4 1 2 1 1 1 SRO-I I/C 1, 2, 7, 8 6, 7, 8 3, 4, 5 10 4 4 2 SRO-U 6 5 6 MAJ 3 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-I 6 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist - Group 3 Form ES-301-5 Facility: Point Beach Date of Exam: May 8 - 19, 2017 Operating Test No.: 2017 A E Scenarios P V 1 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 4 3 2 3 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 1, 2, 5 6, 7, 8 3, 4, 5 9 4 4 2 SRO-U MAJ 6 5 6 3 2 2 1 TS 1, 3 3, 4, 5 5 0 2 2 SRO-I 7 RO RX 4 3 2 1 1 0 NOR 1, 2 2 1 1 1 SRO-I I/C 5 1, 2, 4 4, 8 6 4 4 2 SRO-U MAJ 6 5 6 3 2 2 1 TS 1, 3, 4 3 0 2 2 SRO-I 8 RO RX 2 1 1 1 0 NOR 4 3 2 1 1 1 SRO-I 1, 2, 1, 2, 3, 5, 7 I/C 10 4 4 2 7, 8 4 SRO-U 6 5 6 MAJ 3 2 2 1 TS 0 0 2 2 RO 1 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist - Group 4 Form ES-301-5 Facility: Point Beach Date of Exam: May 8 - 19, 2017 Operating Test No.: 2017 A E Scenarios P V 2 3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 2 1 1 1 0 NOR 1 3 2 1 1 1 SRO-I I/C 3, 4, 5 1, 2, 6 4 4 2 4
SRO-U MAJ 6 5 2 2 2 1 3, 4 SRO-U 1 TS 2 0 2 2 RO RX 3 1 1 1 0 NOR 2 1 1 1 1 SRO-I I/C 5, 7 1, 2, 4 5 4 4 2 SRO-U MAJ 6 5 2 2 2 1 TS 1, 3, 4 3 0 2 2 SRO-I 9 RO RX 2 3 2 1 1 0 NOR 1 1 1 1 1 SRO-I 3, 4, 6, 7, 8 I/C 6 4 4 2 8
SRO-U 6 5 MAJ 2 2 2 1 TS 0 0 2 2 RO 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist - Group 5 Form ES-301-5 Facility: Point Beach Date of Exam: May 8 - 19, 2017 Operating Test No.: 2017 A E Scenarios P V 2 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I
C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)
T P E R I U RO RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 3, 4, 5 3 4 4 2 SRO-U MAJ 6 1 2 2 1 TS 3, 4 2 0 2 2 SRO-U 2 RO RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 3, 4, 5 3 4 4 2 SRO-U MAJ 6 1 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-U 3 RO RX 2 1 1 1 0 NOR 1, 2 2 1 1 1 SRO-I 5, 7 4, 8 I/C 4 4 4 2 SRO-U MAJ 6 6 2 2 2 1 TS 0 0 2 2 RO 3 RO RX 2 1 1 1 0 NOR 1, 2 2 1 1 1 SRO-I 3, 4, 3, 5, 7 I/C 6 4 4 2 8
SRO-U 6 6 MAJ 2 2 2 1 TS 0 0 2 2 RO 4 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.