ML17201Q528: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/23/2017
| issue date = 05/23/2017
| title = 2017 Point Beach Nuclear Plant Initial License Examination Forms ES-301-5 Revision 1
| title = 2017 Point Beach Nuclear Plant Initial License Examination Forms ES-301-5 Revision 1
| author name = Seymour J L
| author name = Seymour J
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301 Transient and Event Checklist
{{#Wiki_filter:ES-301                               Transient and Event Checklist - Group 1                                   Form ES-301-5 Facility:                                               Date of Exam: May 8 - 19, 2017       Operating Test No.:2017 A           E                                                        Scenarios P           V 2                       3                     4                             T       M P            E O       I L            N            CREW                    CREW                  CREW            CREW T      N I           T          POSITION                 POSITION             POSITION         POSITION I
- Group 1 Form ES-301-5   Facility:
C                                                                                                          A S       A      B        S        A    B      S        A   B   S     A      B            M A            T                                                                                            L R       T      O       R        T     O     R       T    O   R      T     O              U N            Y O        C     P      O         C    P     O       C   P  O     C      P            M(*)
Date of Exam: May 8  
T            P E                                                                                                  R     I U RO           RX                                                       2                                       1     1   1 0 NOR                                                     1                                      1      1   1 1 SRO-I I/C                                                     3, 4, 5                                 3     4   4 2 SRO-U        MAJ                                                     6                                       1     2   2 1 TS                                                       3, 4, 5                                 3     0   2 2 SRO-U 1 RO            RX       2                       3                             2                             3     1   1 0 NOR       1                                                                                     1     1   1 1 SRO-I I/C       3, 4, 5                 1, 2, 4                       3, 5                           8     4   4 2 SRO-U        MAJ       6                       5, 7                           6                             4     2   2 1 TS       3, 4                     1, 3, 4                                                       5     0   2 2 SRO-I 1 RO           RX                 2                                                                             1     1   1 0 NOR                                               3                   1, 2                     3     1   1 1 SRO-I                           5, 7                           1, 2,               4, 7 I/C                                                                                              7     4   4 2 4
- 19, 2017 Operating Test No.:2017 A P P L I C A N T E V E N T  T Y P
SRO-U                            6                               5, 7                 6 MAJ                                                                                              4     2   2 1 TS                                                                                               0     0   2 2 RO 1 RO           RX                                         3                                                   1     1   1 0 NOR                       1, 2                                                                 2     1   1 1 SRO-I                                   3, 4,           6, 8 I/C                                                                                              5     4   4 2 8
E Scenarios 2 3 4 T O T A L      M       I      N       I     M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO SRO-I  SRO-U  SRO-U 1 RX       2      1 1 1 0 NOR       1      1 1 1 1 I/C       3, 4, 5      3 4 4 2 MAJ       6      1 2 2 1 TS       3, 4, 5      3 0 2 2 RO  SRO-I  SRO-U SRO-I 1 RX 2   3   2     3 1 1 0 NOR 1           1 1 1 1 I/C 3, 4, 5   1, 2, 4   3, 5     8 4 4 2 MAJ 6   5, 7   6     4 2 2 1 TS 3, 4   1, 3, 4         5 0 2 2 RO  SRO-I SRO-U  RO 1 RX 2           1 1 1 0 NOR     3   1, 2   3 1 1 1 I/C  5, 7   1, 2, 4, 7   7 4 4 2 MAJ  6   5, 7   6   4 2 2 1 TS             0 0 2 2 RO SRO-I  SRO-U  RO 2 RX     3       1 1 1 0 NOR   1, 2         2 1 1 1 I/C  3, 4, 6, 8       5 4 4 2 MAJ  6 5, 7       3 2 2 1 TS             0 0 2 2 Instructions:
SRO-U                                    6               5, 7 MAJ                                                                                              3     2   2 1 TS                                                                                               0     0   2  2 RO 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
-the-controls" (ATC) and "balance
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
: 4.         For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
-hand columns.
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters
, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.


ES-301 Transient and Event Checklist
ES-301                               Transient and Event Checklist - Group 2                                   Form ES-301-5 Facility:                                               Date of Exam: May 8 - 19, 2017       Operating Test No.:2017 A           E                                                        Scenarios P           V 1                       2                     4                             T       M P            E O       I L            N            CREW                    CREW                  CREW            CREW T      N I           T          POSITION                 POSITION             POSITION         POSITION I
- Group 2 Form ES-301-5   Facility:
C                                                                                                          A S      A      B        S        A    B      S       A   B   S     A      B            M A            T                                                                                            L R       T      O       R        T     O     R       T    O   R      T     O              U N            Y O      C       P      O         C    P     O       C   P  O     C      P            M(*)
Date of Exam: May 8  
T            P E                                                                                                  R     I U RO           RX                                                                                               0     1   1 0 NOR       4                                                                                     1     1   1 1 SRO-I I/C       1, 2, 5                                                                               3     4   4 2 SRO-U        MAJ       6                                                                                     1     2   2 1 TS       1, 3                                                                                   2     0   2 2 SRO-U 2 RO            RX                                         2            2                                       2      1   1 0 NOR                                                     1                                      1      1   1 1 SRO-I I/C                                         5, 7         3, 4, 5                                5      4   4 2 SRO-U        MAJ                                         6           6                                       2     2   2 1 TS                                                       3, 4, 5                                 3     0   2 2 SRO-I 2 RO            RX                                                               2                             1     1   1 0 NOR                       4       1                                                             2     1   1 1 SRO-I I/C                       1, 2, 7, 8 3, 4, 5                       3, 5                           9     4   4 2 SRO-U                                    6       6                             6 MAJ                                                                                              3     2   2 1 TS                                 3, 4                                                         2     0   2 2 SRO-I 3 RO           RX                 4                                                                             1     1   1 0 NOR                                               1, 2                 1, 2                     4     1   1 1 SRO-I                           5                               3, 4,               4, 7 I/C                                                                                              6     4   4 2 8
- 19, 2017 Operating Test No.:2017 A P P L I C A N T E V E N T  T Y P
SRO-U                            6                               6                   6 MAJ                                                                                              3     2   2 1 TS                                                                                               0     0   2 2 RO 3 Instructions:
E Scenarios 1 2 4 T O T A L      M       I      N       I     M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO SRO-I  SRO-U  SRO-U 2 RX             0 1 1 0 NOR 4           1 1 1 1 I/C 1, 2, 5           3 4 4 2 MAJ 6           1 2 2 1 TS 1, 3           2 0 2 2 RO  SRO-I  SRO-U SRO-I 2 RX     2 2      2 1 1 0 NOR       1      1 1 1 1 I/C     5, 7 3, 4, 5      5 4 4 2 MAJ     6 6      2 2 2 1 TS       3, 4, 5      3 0 2 2 RO  SRO-I SRO-U  SRO-I 3 RX       2     1 1 1 0 NOR   4 1         2 1 1 1 I/C   1, 2, 7, 8 3, 4, 5   3, 5     9 4 4 2 MAJ  6 6   6     3 2 2 1 TS   3, 4         2 0 2 2 RO  SRO-I SRO-U  RO 3 RX 4           1 1 1 0 NOR     1, 2   1, 2   4 1 1 1 I/C  5   3, 4, 4, 7   6 4 4 2 MAJ  6   6   6   3 2 2 1 TS             0 0 2 2 Instructions:
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 1. Check the applicant level and enter the operating test number and Form ES
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
-the-controls" (ATC) and "balance
: 4.         For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters
, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.
Note: In Scenario 1 the SRO is credited with a normal for the event 4 power change
Note: In Scenario 1 the SRO is credited with a normal for the event 4 power change


ES-301 Transient and Event Checklist
ES-301                               Transient and Event Checklist - Group 3                                   Form ES-301-5 Facility:                                               Date of Exam: May 8 - 19, 2017       Operating Test No.:2017 A           E                                                        Scenarios P           V 1                       3                     4                             T       M P            E O       I L            N            CREW                    CREW                  CREW            CREW T      N I           T          POSITION                 POSITION             POSITION         POSITION I
- Group 3 Form ES-301-5   Facility:
C                                                                                                          A S       A      B        S        A    B      S        A   B   S     A      B            M A            T                                                                                            L R       T      O       R        T     O     R       T    O   R      T     O              U N            Y O      C       P      O         C    P     O       C   P  O     C      P             M(*)
Date of Exam: May 8  
T            P E                                                                                                  R     I U RO           RX                 4                                     2                                      2      1   1 0 NOR                                               3     1                                       2     1   1 1 SRO-I I/C               5                               1, 2, 3, 4, 5                                 7     4   4 2 4
- 19, 2017 Operating Test No.:2017 A P P L I C A N T E V E N T  T Y P
SRO-U MAJ               6                               5, 7 6                                       4     2   2 1 TS                                                       3, 4, 5                                 3     0   2 2 SRO-I 5 RO            RX                                 3                             2                             2     1   1 0 NOR                       4                                                                     1     1   1 1 SRO-I I/C                       1, 2,   1, 2, 4                       3, 5                           9     4   4 2 7, 8 SRO-U MAJ                       6       5, 7                           6                             4     2   2 1 TS                                 1, 3, 4                                                       3     0   2 2 SRO-I 6 RO            RX       4                                 3                                                   2     1   1 0 NOR                                                                     1, 2                     2     1   1 1 SRO-I I/C       1, 2, 5                           6, 8                       4, 7                     7     4    4  2
E Scenarios 1 3 4 T O T A L      M       I      N       I     M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO SRO-I  SRO-U  SRO-I 5 RX 4     2      2 1 1 0 NOR     3 1      2 1 1 1 I/C 5   1, 2, 4 3, 4, 5      7 4 4 2 MAJ 6   5, 7 6      4 2 2 1 TS       3, 4, 5      3 0 2 2 RO  SRO-I SRO-U  SRO-I 6 RX   3   2     2 1 1 0 NOR   4         1 1 1 1 I/C   1, 2, 7, 8 1, 2, 4   3, 5     9 4 4 2 MAJ   6 5, 7   6     4 2 2 1 TS   1, 3, 4         3 0 2 2 RO  SRO-I SRO-U  SRO-I 7 RX 4   3       2 1 1 0 NOR         1, 2   2 1 1 1 I/C 1, 2, 5   6, 8   4, 7   7 4 4 2 MAJ 6    5, 7    6   4 2 2 1 TS 1, 3            2 0 2 2 RO SRO-I  SRO-U  RX              1 1 0 NOR              1 1 1 I/C              4 4 2 MAJ              2 2 1 TS              0 2 2 Instructions:
: 1. Check the applicant level and enter the operating test number and Form ES
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
-the-controls" (ATC) and "balance
-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D.  (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters
, the chief examiner may place SRO
-I applicants in either the ATC or BOP position to best evaluate the SRO
-I in manipulating plant controls.


ES-301 Transient and Event Checklist
SRO-U        MAJ      6                                5, 7                        6                        4      2    2  1 TS        1, 3                                                                                  2      0    2  2 SRO-I 7 RO            RX                                                                                                      1    1  0 NOR                                                                                                    1    1  1 SRO-I I/C                                                                                                    4    4  2 SRO-U        MAJ                                                                                                    2    2  1 TS                                                                                                      0    2  2 Instructions:
- Group 4 Form ES-301-5   Facility:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
Date of Exam: May 8  
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 19, 2017 Operating Test No.:2017 A P P L I C A N T E V E N T T Y P
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E Scenarios 2 3  T O T A L      M       I      N       I     M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O A T C B O P S R O A T C B O P S R O A T C B O P S R O A T C B O P R I U RO SRO-I  SRO-U  SRO-U 3 RX   3         1 1 1 0 NOR   1, 2         2 1 1 1 I/C   3, 4, 8 1, 2, 4         6 4 4 2 MAJ   6 5, 7         3 2 2 1 TS    1, 3, 4         3 0 2 2 RO SRO-I  SRO-U  SRO-I 4 RX 2   3       2 1 1 0 NOR 1           1 1 1 1 I/C 3, 4, 5   6, 8       5 4 4 2 MAJ 6   5, 7       3 2 2 1 TS 3, 4           2 0 2 2 RO  SRO-I SRO-U  RO 4 RX 2           1 1 1 0 NOR     3       1 1 1 1 I/C  5, 7   1, 2, 4      5 4 4 2 MAJ  6   5, 7       3 2 2 1 TS             0 0 2 2 RO SRO-I  SRO-U  RX             1 1 0 NOR             1 1 1 I/C             4 4 2 MAJ             2 2 1 TS             0 2 2 Instructions:
: 4.        For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
: 1. Check the applicant level and enter the operating test number and Form ES
 
-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at
ES-301                               Transient and Event Checklist - Group 4                                   Form ES-301-5 Facility:                                               Date of Exam: May 8 - 19, 2017       Operating Test No.:2017 A           E                                                      Scenarios P           V 2                      3                                                  T       M P           E O       I L            N            CREW                    CREW              CREW                CREW T      N I           T          POSITION                 POSITION             POSITION           POSITION I
-the-controls" (ATC) and "balance
C                                                                                                          A S       A      B        S        A    B    S    A     B     S     A      B            M A            T                                                                                            L R       T      O       R        T     O   R     T    O     R      T     O              U N            Y O        C     P      O         C    P   O     C     P      O     C      P             M(*)
-of-plant" (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO
T            P E                                                                                                  R     I U RO           RX                                 3                                                             1     1   1 0 NOR                       1, 2                                                                 2     1   1 1 SRO-I I/C                       3, 4,   1, 2, 4                                                       6     4   4 2 8
-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
SRO-U MAJ                       6       5, 7                                                         3     2   2 1 1, 3, 4 SRO-U 3 TS                                                                                                    3     0   2 2 RO           RX       2                                 3                                                   2     1   1 0 NOR       1                                                                                     1     1   1 1 SRO-I I/C       3, 4, 5                           6, 8                                                 5     4   4 2 SRO-U        MAJ       6                                 5, 7                                                 3     2   2 1 TS       3, 4                                                                                   2     0   2 2 SRO-I 4 RO           RX                 2                                                                             1     1   1 0 NOR                                               3                                             1     1   1 1 SRO-I                           5, 7                           1, 2, I/C                                                                                              5     4   4 2 4
: 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis. 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right
SRO-U                            6                               5, 7 MAJ                                                                                              3     2   2 1 TS                                                                                               0     0   2 2 RO 4 RO            RX                                                                                                     1   1 0 NOR                                                                                                     1   1 1 SRO-I I/C                                                                                                     4   4 2 SRO-U        MAJ                                                                                                     2   2 1 TS                                                                                                     0   2 2 Instructions:
-hand columns.
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 4. For licensees that use the ATC operator primarily for monitoring plant parameters
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
, the chief examiner may place SRO
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
-I applicants in either the ATC or BOP position to best evaluate the SRO
: 4.         For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}}
-I in manipulating plant controls.}}

Latest revision as of 01:53, 30 October 2019

2017 Point Beach Nuclear Plant Initial License Examination Forms ES-301-5 Revision 1
ML17201Q528
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/23/2017
From: Jesse Seymour
Operations Branch III
To:
Point Beach
Shared Package
ML16319A342 List:
References
Download: ML17201Q528 (4)


Text

ES-301 Transient and Event Checklist - Group 1 Form ES-301-5 Facility: Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A E Scenarios P V 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 3, 4, 5 3 4 4 2 SRO-U MAJ 6 1 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-U 1 RO RX 2 3 2 3 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 3, 4, 5 1, 2, 4 3, 5 8 4 4 2 SRO-U MAJ 6 5, 7 6 4 2 2 1 TS 3, 4 1, 3, 4 5 0 2 2 SRO-I 1 RO RX 2 1 1 1 0 NOR 3 1, 2 3 1 1 1 SRO-I 5, 7 1, 2, 4, 7 I/C 7 4 4 2 4

SRO-U 6 5, 7 6 MAJ 4 2 2 1 TS 0 0 2 2 RO 1 RO RX 3 1 1 1 0 NOR 1, 2 2 1 1 1 SRO-I 3, 4, 6, 8 I/C 5 4 4 2 8

SRO-U 6 5, 7 MAJ 3 2 2 1 TS 0 0 2 2 RO 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist - Group 2 Form ES-301-5 Facility: Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A E Scenarios P V 1 2 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 0 1 1 0 NOR 4 1 1 1 1 SRO-I I/C 1, 2, 5 3 4 4 2 SRO-U MAJ 6 1 2 2 1 TS 1, 3 2 0 2 2 SRO-U 2 RO RX 2 2 2 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 5, 7 3, 4, 5 5 4 4 2 SRO-U MAJ 6 6 2 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-I 2 RO RX 2 1 1 1 0 NOR 4 1 2 1 1 1 SRO-I I/C 1, 2, 7, 8 3, 4, 5 3, 5 9 4 4 2 SRO-U 6 6 6 MAJ 3 2 2 1 TS 3, 4 2 0 2 2 SRO-I 3 RO RX 4 1 1 1 0 NOR 1, 2 1, 2 4 1 1 1 SRO-I 5 3, 4, 4, 7 I/C 6 4 4 2 8

SRO-U 6 6 6 MAJ 3 2 2 1 TS 0 0 2 2 RO 3 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

Note: In Scenario 1 the SRO is credited with a normal for the event 4 power change

ES-301 Transient and Event Checklist - Group 3 Form ES-301-5 Facility: Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A E Scenarios P V 1 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 4 2 2 1 1 0 NOR 3 1 2 1 1 1 SRO-I I/C 5 1, 2, 3, 4, 5 7 4 4 2 4

SRO-U MAJ 6 5, 7 6 4 2 2 1 TS 3, 4, 5 3 0 2 2 SRO-I 5 RO RX 3 2 2 1 1 0 NOR 4 1 1 1 1 SRO-I I/C 1, 2, 1, 2, 4 3, 5 9 4 4 2 7, 8 SRO-U MAJ 6 5, 7 6 4 2 2 1 TS 1, 3, 4 3 0 2 2 SRO-I 6 RO RX 4 3 2 1 1 0 NOR 1, 2 2 1 1 1 SRO-I I/C 1, 2, 5 6, 8 4, 7 7 4 4 2

SRO-U MAJ 6 5, 7 6 4 2 2 1 TS 1, 3 2 0 2 2 SRO-I 7 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist - Group 4 Form ES-301-5 Facility: Date of Exam: May 8 - 19, 2017 Operating Test No.:2017 A E Scenarios P V 2 3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION I

C A S A B S A B S A B S A B M A T L R T O R T O R T O R T O U N Y O C P O C P O C P O C P M(*)

T P E R I U RO RX 3 1 1 1 0 NOR 1, 2 2 1 1 1 SRO-I I/C 3, 4, 1, 2, 4 6 4 4 2 8

SRO-U MAJ 6 5, 7 3 2 2 1 1, 3, 4 SRO-U 3 TS 3 0 2 2 RO RX 2 3 2 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 3, 4, 5 6, 8 5 4 4 2 SRO-U MAJ 6 5, 7 3 2 2 1 TS 3, 4 2 0 2 2 SRO-I 4 RO RX 2 1 1 1 0 NOR 3 1 1 1 1 SRO-I 5, 7 1, 2, I/C 5 4 4 2 4

SRO-U 6 5, 7 MAJ 3 2 2 1 TS 0 0 2 2 RO 4 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.