{{#Wiki_filter:Attachment 2 EGG-MS-8923 TECHNICAL EVALUATION REPORT ON THE THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN: ROCHESTER GAS AND ELECTRIC CORPORATION, R.E.GINNA NUCLEAR POWER STATION, DOCKET NUMBER 50-244 B.W.Brown J.D.Mudlin Published April 1990 Idaho National Engineering Laboratory EG&G Ida'ho, Inc.Idaho Falls, Idaho 83415 Prepared for: U.S.Nuclear Regulatory Commission Washington, D.C.20555 under DOE Contract No.DE-AC07-76ID01570 FIN No.D6022 (Project 5)9008080272 9 PDR ADOCK 900806 05000244 PDC ABSTRACT This report presents the results of the evaluation of the R.E.Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection (ISI)Program Plan, submitted July 21, 1989, including the requests for relief from the American Society of Mechanical Engineers (ASHE)Boiler and Pressure Vessel Code Section XI requirements which the Licensee has determined to be impractical.
{{#Wiki_filter:Attachment 2 EGG-MS-8923 TECHNICAL EVALUATION REPORT ON THE THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN:
The R.E.Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan is evaluated in Section 2 of this report.The ISI Program Plan is evaluated for (a)compliance with the"appropriate edition/addenda of Section XI, (b)acceptability of examination sample, (c)correctness of the application of system or component examination exclusion criteria, and (d)compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC)reviews.The requests for relief are evaluated in Section 3 of this report.This work was funded under: U.S.Nuclear Regulatory Commission FIN No.06022, Project 5 Operating Reactor, Licensing Issues Program, Review of ISI for ASHE Code Class 1, 2, and 3 Components  
ROCHESTER GAS AND ELECTRIC CORPORATION, R. E. GINNA NUCLEAR POWER STATION, DOCKET NUMBER   50-244 B. W. Brown J. D. Mudlin Published April 1990 Idaho National Engineering Laboratory EG&G Ida'ho, Inc.
Idaho Falls, Idaho 83415 Prepared for:
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 under DOE Contract No. DE-AC07-76ID01570 FIN No. D6022 (Project 5) 9008080272 900806 PDR ADOCK 05000244 9
PDC
 
ABSTRACT This report presents the results of the evaluation of the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection (ISI)
Program Plan, submitted July 21, 1989, including the requests for relief from the American Society of Mechanical Engineers (ASHE) Boiler and Pressure Vessel Code Section XI requirements which the Licensee has determined to be impractical. The R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan is evaluated in Section 2 of this report. The ISI Program Plan is evaluated for (a) compliance with the "appropriate edition/addenda of Section XI, (b) acceptability of examination sample, (c) correctness of the application of system or component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC) reviews. The requests for relief are evaluated in Section 3 of this report.
This work was funded under:
U.S. Nuclear Regulatory Commission FIN No. 06022, Project 5 Operating Reactor, Licensing Issues Program, Review of ISI for ASHE Code Class 1, 2, and 3 Components


==SUMMARY==
==SUMMARY==
The Licensee, Rochester Gas and Electric Corporation, has prepared the R.E.Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection (ISI)Program Plan to meet the requirements of the 1986 Edition of the ASME Code Section XI.The third 10-year interval began January 1, 1990 and ends December 31, 1999.The information in the R.E.Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan, submitted July 21, 1989, was reviewed.Included in the review were the requests for relief from the ASME Code Section XI requirements which the Licensee has determined to be impractical.
 
As a result of this review, a request for additional information (RAI)was prepared describing the information and/or clarification required from the Licensee in order to complete the review.The Licensee provided additional information in the submittal dated January 16, 1990.Based on the review of the R.E.Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan, the Licensee's response to the Nuclear Regulatory Commission's RAI, and the recommendations for granting relief from the ISI examination requirements that have been determined to be impractical, it is concluded that the R.E.Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan, with the exception oF Request for Relief Nos.10 and 13, is acceptable and in compliance with 10 CFR 50.55a(g)(4).
The Licensee, Rochester Gas and Electric Corporation, has prepared the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection ( ISI) Program Plan to meet the requirements of the 1986 Edition of the ASME Code Section XI. The third 10-year interval began January 1, 1990 and ends December 31, 1999.
111 I~, CONTENTS ABSTRACT~~~~1 1
The information in the R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan, submitted July 21, 1989, was reviewed. Included in the review were the requests for relief from the ASME Code Section XI requirements which the Licensee has determined to be impractical. As a result of this review, a request for additional information (RAI) was prepared describing the information and/or clarification required from the Licensee in order to complete the review. The Licensee provided additional information in the submittal dated January 16, 1990.
Based on the review of the R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan, the Licensee's response to the Nuclear Regulatory Commission's RAI, and the recommendations for granting relief from the ISI examination requirements that have been determined to be impractical,   it is concluded that the R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan, with the exception oF Request for Relief Nos. 10 and 13, is acceptable and in compliance with 10 CFR 50.55a(g)(4).
111
 
I
  ~,
CONTENTS 1 1 ABSTRACT                                                                                                                     ~ ~ ~ ~


==SUMMARY==
==SUMMARY==
~~~~~~o ill I NTRODUCT I ON~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~t~~~~~~~~~~~~~1 2.EVALUATION OF INSERVICE INSPECTION PROGRAM PLAN...................
                                                                                                                ~ ~ ~ ~ ~ ~ o ill I NTRODUCT I ON   ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~       1
3 2.1 Documents Evaluated...........................................
: 2. EVALUATION OF INSERVICE INSPECTION PROGRAM PLAN                                         ...................                         3
3 2.2 Compliance with Code Requirements
: 2. 1   Documents Evaluated ...........................................                                                                 3 2.2   Compliance with Code Requirements ..........                                                                                     3 2.2.1     Compliance with Applicable Code Editions                                                                                   3 2.2,2     Acceptability of the Examination                               Sample       ...
..........
2.2.3     Exclusion Criteria                 .           ~   ~ ~   ~ ~ ~   ~                         ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
2.2.1 Compliance with Applicable Code Editions 2.2,2 Acceptability of the Examination Sample...3 3 2.2.3 Exclusion Criteria.~~~~~~~~~~~~~~~~~~~~2.2.4 Augmented Examination Commitments
2.2.4     Augmented Examination Commitments                               ..........................                               4 2..3   Conclusions                 ~ ~ ~ ~       ~   ~   ~ ~ ~   ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
..........................
: 3. EVALUATION OF RELIEF REQUESTS                       ...................................                                   ~ .       5
4 2..3 Conclusions
: 3. 1   Class     1 Components           .............................................                                             . 5
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~3.EVALUATION OF RELIEF REQUESTS...................................
: 3. 1. 1   Reactor Pressure               Vessel
~.5 3.1 Class 1 Components
: 3. 1. 1. 1   Request       for Relief           No. 1, Examination Category B-A, Item Bl.30, Deferral of                       RPV Shell-to-Flange Weld Examinations             ..........'...............................                                       ~ .       5
.............................................
: 3. 1. 1.2   Request for Relief No. 2, Examination Category B-D, Items B3.90 and B3. 100, Reactor Pressure Vessel Nozzle-to-Vessel Welds and Nozzle Inside Radius S ections       ,..............                                       ~   ~ ~ ~               ~   ~ ~ ~         . 8 3.1.2     Pressurizer           (No     relief       requests) 3.1.3    Heat Exchangers             and Steam Generators                       (No     relief 'requests) 3.1.4    P'ping Pressure Boundary                       ...................................                                       11
.5 3.1.1 Reactor Pressure Vessel 3.1.1.1 Request for Relief No.1, Examination Category B-A, Item Bl.30, Deferral of RPV Shell-to-Flange Weld Examinations
: 3. 1.4. 1   Request       for Relief           No. 16       (Part       1   of 2), Examination Category B-K-I, Item B10. 10, Class                                 1   Piping Integrally Welded Attachments                             ......'....................                             ll
..........'...............................
: 3. 1.5   Pump Pressure     Boundary                                                                               12 3.1.5.1   Request     for Relief No. 4, Examination Category B-L-1 and B-L-2, Items B12. 10 and B12.20, Class 1 Pump Casing Welds and Pump Casings                                   .............             12
~.5 3.1.1.2 Request for Relief No.2, Examination Category B-D, Items B3.90 and B3.100, Reactor Pressure Vessel Nozzle-to-Vessel Welds and Nozzle Inside Radius S ections ,..............
: 3. 1.6   Valve Pressure       Boundary           ..                                                                 15 3.1.6.1   Request     for Relief           No. 5, Examination Category     B-H-2,       Item     B12.50, Class 1 Valve Body Internal Surfaces             ......................................                                 15
~~~~~~~~.8 3.1.2 3.1.3 3.1.4 Pressurizer (No relief requests)Heat Exchangers and Steam Generators (No relief'requests)
: 3. 1.7   General     (No relief       requests) 3.2   Class   2 Components       ...........                                                                           18 3.2.1   Pressure   Vessels         (No     relief       requests) 3 .2.2   Piping   ....                 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~   ~ ~ ~ ~                                   18 3.2.2. 1   Request     for Relief           No. 15, Examination Category     C-F-1       and     C-F-2, Items C5.10 and C5.50, Class 2 Piping           Welds       ..   .............                 ...............               18 3.2.2.2   Request     for Relief           No. 16 (Part 2 of 2),
P'ping Pressure Boundary...................................
Examination Category C-C, Item C3.20, Class                                   2 Piping Integrally Welded Attachments .                                                                 18 3.2.3   Pumps     (No relief requests) 3.2.4 Valves (No relief requests) 3 '.5   General     (No relief requests) 3.3 Class 3 Components (No relief requests) 3'     Pressure   Tests   . .           ~ ~   ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~       ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ \ 19 3.4. 1 Class   1 System Pressure             Tests (No           relief     requests) 3.4.2   Class 2   System Pressure             Tests       ..............................                         19 3.4.2.1   Request for Relief No. 7, System Hydrostatic Test of Three Charging Pumps and Discharge Piping to Discharge Isolation Valves in the Chemistry and Volume Control System                 ...............'.               .     .............             19 3.4.2.2   Request     for Relief           No. 8, System Hydrostatic Test of Reactor Coolant System Overpressure Protection Nitrogen Accumulator System Valves PCV 430 and PCV 431C                         o'                        ~                                           20
11 3.1.4.1 Request for Relief No.16 (Part 1 of 2), Examination Category B-K-I, Item B10.10, Class 1 Piping Integrally Welded Attachments
                              ~ ~ ~ ~ ~ ~ ~ ~ ~ ~     ~ ~ ~ ~   ~ ~   ~ ~ ~     ~
......'....................
ll 3.1.5 Pump Pressure Boundary 12 3.1.5.1 Request for Relief No.4, Examination Category B-L-1 and B-L-2, Items B12.10 and B12.20, Class 1 Pump Casing Welds and Pump Casings.............
12 3.1.6 Valve Pressure Boundary..15 3.1.6.1 Request for Relief No.5, Examination Category B-H-2, Item B12.50, Class 1 Valve Body Internal Surfaces......................................
15 3.1.7 General (No relief requests)3.2 Class 2 Components
...........
3.2.1 Pressure Vessels (No relief requests)3.2.2 Piping....~~~~~~~~~~~~~~~~~~~~18 18 3.2.2.1 Request for Relief No.15, Examination Category C-F-1 and C-F-2, Items C5.10 and C5.50, Class 2 Piping Welds...............
...............
18 3.2.2.2 Request for Relief No.16 (Part 2 of 2), Examination Category C-C, Item C3.20, Class 2 Piping Integrally Welded Attachments
.3.2.3 Pumps (No relief requests)3.2.4 Valves (No relief requests)3'.5 General (No relief requests)3.3 Class 3 Components (No relief requests)18 3'Pressure Tests..~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~\19 3.4.1 Class 1 System Pressure Tests (No relief requests)3.4.2 Class 2 System Pressure Tests..............................
19 3.4.2.1 Request for Relief No.7, System Hydrostatic Test of Three Charging Pumps and Discharge Piping to Discharge Isolation Valves in the Chemistry and Volume Control System...............'.
..............
19 3.4.2.2 Request for Relief No.8, System Hydrostatic Test of Reactor Coolant System Overpressure Protection Nitrogen Accumulator System Valves PCV 430 and PCV 431C~~~~~~~~~~o'~~~~~~~~~~~20 3.4.2.3 Request for Relief No.9, System Hydrostatic Test of the Secondary Side of the Steam Generator and Associated Hain Steam Piping.....22 3.4.2.4 Request for Relief No.13, System Hydrostatic Test of Non-ISI Classified Systems............
.......25 3.4.3 Class 3 System Pressure Tests.28 3.4.3.1 Request for Relief No.6, System Hydrostatic Test of the Radioactive Waste Holdup Tank...................
28 3.4.3.2 Request for Relief No.10, System Hydrostatic Test of the Standby Auxiliary Feedwater Pump Recirculation Line....................
28 3.4.3.3 Request for Relief No.11, System Hydrostatic Test of the Boric Acid Filter and Associated Piping in the Chemical and Volume Control System.3.4.3.4 Request for Relief No.12, System Hydrostatic Test of Portions of the Emergency Diesel Generation 30 S ystem 0~~~~~~~~~~~~~~~~~~~~~~~~~\~~~~~~~~~~~~~~~~~~~~~~30 3.4.3.5 Request for Relief No.14, System Hydrostatic Test of All Pressure Retaining Components Within the Class 3 Portion of the Service Water System............
32 3.4.4 General (No relief requests)3.5 General~~~~~~~~~~~~~~~~~34 3.5.1 Ultrasonic Examination Techniques (No relief requests)3.5.2 Exempted Components (No relief requests)3.5.3 Other.~~~~~I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~35 3.5.3.1 Request for Relief No.3, Use of an Authorized Inspection Agency to Provide Inspection Services.......'5~CONC LUS ION~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~t,~~~~~~~~~~~38 4 5.REFERENCES
......................
~~~~~~~~~~~~~~~~~~~~~~~~~40
.r.*L~+pip I I" TECHNICAL EVALUATION REPORT ON THE THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN: ROCHESTER GAS AND ELECTRIC CORPORATION, R.E.GINNA NUCLEAR POWER STATION, DOCKET NUMBER 50-244 1.INTRODUCTION Throughout the service life of a water-cooled nuclear power facility, 10 CFR 50.55a(g)(4)(Reference 1)requires that components (including supports)that are classified as American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code Class 1, Class 2, and Class 3 meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code Section XI,"Rules for Inservice Inspection of Nuclear Power Station Components," (Reference 2)to the extent practical within the limitations of design, geometry, and materials of construction of the components..
This section of the regulations also requires that inservice examinations of components and system pressure tests conducted during successive 120-month inspection intervals shall comply with the requirements in the latest edition and addenda of the Code incorporated by reference in 10 CFR 50.55a(b)on the date 12 months prior to the start of the 120-month inspection interval, subject to the limitations and modifications listed therein.The components (including supports)may meet requirements set forth in subsequent editions and addenda of this Code which are incorporated by reference in 10 CFR 50.55a(b)subject to the limitations and modifications listed therein.The Licensee, Rochester Gas and Electric Corporation, has prepared the R.E.Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection (ISI)Program Plan to meet the requirements of the 1986 Edition of the ASME Code Section XI.The third 10-year interval began January 1;1990 and ends December 31, 1999.As required by 10 CFR 50.55a(g)(5), if the licensee determines that certain Code examination requirements are impractical and requests relief from them, the licensee shall submit information and justifications to the Nuclear Regulatory Commission (NRC)to support that determination.
'Pursuant to 10 CFR 50.55a(g)(6), the NRC will evaluate the licensee's determinations under 10 CFR 50.55a(g)(5) that Code requirements are impractical.
The NRC may grant relief and may impose alternative requirements that are determined to be authorized by law, will not endanger life or property or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the 6'licensee that could result if the requirements were imposed on the facility.The information in the R.E.Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan (Reference 3), submitted July 21, 1989, was reviewed, including the requests for relief from the ASHE Code Section XI requirements which the Licensee has determined to be impractical.
Review of the ISI Program Plan was performed using the Standard Review Plans of NUREG-0800 (Reference 4), Section 5.2.4,"Reactor Coolant Boundary Inservice Inspections and Testing," and Section 6.6,"Inservice Inspection of Class 2 and 3 Components." In a letter dated November 16, 1989 (Reference 5), the NRC requested additional information required in order to complete the review of the ISI Program Plan.Additional information was provided by the Licensee in a submittal dated January 16, 1990 (Reference 6).The R.E.Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan is evaluated in Section 2 of this report.The ISI Program Plan is evaluated for (a)compliance with the appropriate edition/addenda of Section XI, (b)acceptability of examination sample, (c)correctness of the application of system or component examination exclusion criteria, and (d)compliance with ISI-related commitments identified during previous NRC reviews.The requests for relief are evaluated in Section 3 of this report.Unless otherwise stated, references to the Code refer to the ASHE Code, Section XI, 1986 Edition.Specific inservice test (IST)programs for pumps and valves are being evaluated in other reports.
0 2.EVALUATION OF INSERVICE INSPECTION PROGRAM PLAN This evaluation consisted of a review of the applicable program documents to determine whether or not they are in compliance with the Code requirements and any license conditions pertinent to ISI activities.
This section describes the submittals reviewed and the results of the review.2.1 Oocuments Evaluated Review has been completed on the following information provided by the Licensee: (a)R.E.Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan;and (b)Letter, dated January 16, 1990, containing the Licensee's response to the NRC request for additional information.
2.2 Compliance with Code Re uirements 2.2.1 Com liance with A licable Code Editions The Inservice Inspection Program Play shall be based on the Code editions defined in 10 CFR 50.55a(g)(4) and 10 CFR 50.55a(b).
Based on the starting date of January 1, 1990, for the R.E.Ginna Nuclear Power Station, the Code applicable to the third 10-year interval ISI program plan is the 1986 Edition.As stated in Section 1 of this report, the Licensee has written the R.E.Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan to meet the requirements of the,1986 Edition of the ASHE Code.I 2.2.2 Acce tabilit of the Examination Sam le Inservice volumetric, surface, and visual examinations shall be performed on ASHE Code Class 1, 2, and 3 components and their supports using sampling schedules described in Section XI of the ASME Code and 0 A 10 CFR 50.55a(b).
Sample size and weld selection have been implemented in accordance with the Code and appear to be correct.2.2.3 Exclusion Criteria The criteria used to exclude components from examination shall be consistent with Paragraphs IWB-1220, IWC-1220, IWC-1230, IWO-1220', and 10 CFR 50.55a(b).
The exclusion criteria have been applied by the Licensee in accordance with the Code as discussed in the ISI Program Plan and appear to be correct.2.2.4 Au mented Examination Commitments In addition to the requirements specified in Section XI of the ASME Code, the Licensee has committed to perform augmented examinations in accordance with NRC Regulatory Guide 1.14,"Reactor Coolant Pump Flywheel Integrity," Revision 1, (Reference 7)and NRC Regulatory Gu'ide 1.150,"Ultrasonic Testing of Reactor Vessel Welds Ouring Preservice and Inservice Examinations," Revision 1 (Reference 8).Also, circumferential butt welds in high energy piping outside of containment where a failure would result in unacceptable consequences will receive radiographic or ultrasonic volumetric examinations and magnetic particle surface examinations.
'2.3 Conclusions Based on review of the documents listed above, it is concluded that the R.E.Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan is acceptable and in compliance with 10 CFR 50.55a(g)(4).


3.EVALUATION OF RELIEF REQUESTS Requests for relief from the ASHE Code requirements that the Licensee has determined to be impractical for the third 10-year inspection interval are evaluated in the following sections.3.1 Class 1 Com onents 3.1.1 Reactor Pressure Vessel 3.1.1.1 Re uest for Relief No.1 Examination Cate or B-A Item Bl.30.Deferral of RPV Shell-to-Flan e Weld Examinations Code Re uirement: Section XI, Table IWB-2500-1, Examination Category B-A, Item 81.30 requires a 100%volumetric examination of the Reactor Pressure Vessel shell-to-flange weld as defined by Figure IWB-2500-4.
3.4.2.3    Request        for Relief            No. 9, System Hydrostatic Test of the Secondary Side of the Steam Generator and Associated Hain Steam Piping                                .....                                                  22 3.4.2.4    Request        for Relief            No. 13, System                  Hydrostatic Test of Non-ISI Classified                        Systems          ............                        .  ......      25 3.4.3    Class    3  System Pressure                  Tests        .                                                            28 3.4.3. Request for Relief                    No. 6, System Hydrostatic Test 1
Note 5 states that, if partial examinations are conducted from the flange face, the remaining volumetric examinations required to be conducted from the vessel wall may be performed at or near the end of each inspection interval.Note 6 states that the examination of shell-to-flange welds may be performed during the first and'hird inspection periods in conjunction with the nozzle examination of Examination Category B-D.At least 50%of shell-to-flange welds shall be examined by the end of the first inspection period and the remainder by the end of the third inspection period.Licensee's Code Relief Re uest: Relief is requested to defer the volumetric examination of the Reactor Pressure Vessel (RPV)shell-to flange weld to the end of the inspection interval.Licensee's Pro osed Alternative Examination:
of the Radioactive                    Waste Holdup Tank                    ...................                    28 3.4.3.2    Request        for Relief No. 10, System Hydrostatic Test of the        Standby          Auxiliary Feedwater Pump Recirculation Line                      ....................                                                        28 3.4.3.3    Request for Relief No. 11, System Hydrostatic Test of the Boric Acid Filter and Associated Piping in the Chemical and Volume Control System                                          .                                  30 3.4.3.4    Request        for Relief            No. 12, System Hydrostatic Test of Portions of the                    Emergency Diesel Generation S ystem      0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~    ~ ~ \ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~ ~ ~ ~ 30 3.4.3.5    Request        for Relief No. 14, System Hydrostatic Test of All Pressure Retaining Components Within the Class 3 Portion of the Service Water System ............                                                            32 3.4.4    General        (No    relief        requests) 3.5  General                                ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~ ~                                                    34 3.5. 1  Ultrasonic Examination Techniques                                  (No    relief        requests) 3.5.2    Exempted Components                    (No    relief          requests) 3 .5.3  Other    .          ~ ~ ~ ~ ~ I~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ ~ ~ 35 for Relief No. 3, Use of an Authorized 3.5.3.1  Request Inspection Agency to Provide Inspection Services                                                      ....... '5 4 ~  CONC LUS ION  ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~    t, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 38
The Licensee states that, during the third interval, 100%of the accessible length of all RPV welds, including the shell-to-flange weld, will be performed at or near the end of the interval when all the required examinations can be performed at the same.time.
: 5. REFERENCES    ......................                                          ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  40
Licensee's Basis for Re uestin Relief: The Licensee states that the required shell-to-flange examination is impractical if performed during the periods specified as it can be accomplished only from the flange surface.During the first two inspection intervals, 100%of the accessible length of the RPV welds, including the shell-to-flange weld, was examined at or near the end of the interval when the entire examination could be performed from both the flange surface and the vessel wall.This is a more practical approach in that the required examinations from both surfaces can be performed at the same time.The Licensee's January 16, 1990 submittal stated that Rochester Gas and Electric received relief for R.E.Ginna for the second interval (1979-1989) allowing deferral of all vessel mechanized examinations including category B-A to the end of the second interval.Full examination of the RPV shell-to-flange weld (Category B-A)was performed from the flange surface and from the vessel shell during the end of interval March-April 1989 refueling outage.The examination was performed in accordance with the 1974 Edition, Summer 1975 Addenda of the ASME Code.Indications were recorded and analyzed during the series of examinations performed at the 1989 outage.Comparisons of their size to the same indications recorded during the preservice examination and the 1979 end of the first interval inservice examination led to no indications of growth of defects.The indications were sized utilizing, both conventional beam spread techniques and specially developed focused beam sizing techniques.
 
No evidence of growth was detected by utilizing these examination techniques.
.r .*
These examinations were witnessed by the NRC and their consultants during the 1989 outage.
L~+
t I f't)9  
pip I I"
~0 The results of the 1989 examinations with comparative sizing calculations.and fracture mechanics evaluation were submitted to the NRC on Hay 4, 1989.The data provided were accepted by the NRC on June 5, 1989 with no requirements for augmented examinations.
 
The Licensee has, therefore, scheduled the next series of Category B-A RPV examinations for the 1999 time frame (end of this 10-year interval).
TECHNICAL EVALUATION REPORT ON THE THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN:
Examination Category B-A in Table IWB-2500 Item number B1.30 already allows examination deferral as indicated in footnote 5 of the notes.By following the 1986 Code criteria, the Code would require a vessel-to-flange examination from the flange seal surface during the first period of the third interval.Since all reactor vessel examinations, including the vessel-to-flange weld from the flange surface and wall, were accomplished in 1989, the prescribed B-A, B1.30, Code criteria would allow another 10 years before the reexamination.
ROCHESTER GAS AND ELECTRIC CORPORATION, R. E. GINNA NUCLEAR POWER STATION, DOCKET NUMBER  50-244
Since the examination of the RPV vessel-to-flange weld was accomplished completely in 1989, the Licensee proposes to reexamine the weld at the end of the third interval.The Licensee also believes that the results obtained from an examination performed during the first period of the third interval would not provide the best data to ensure additional safety and system reliability.
: 1. INTRODUCTION Throughout the service life of a water-cooled nuclear power facility, 10 CFR 50.55a(g)(4) (Reference 1) requires that components (including supports) that are classified as American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Class 1, Class 2, and Class 3 meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code Section XI, "Rules for Inservice Inspection of Nuclear Power Station Components," (Reference 2) to the extent practical within the limitations of design, geometry, and materials of construction of the components.. This section of the regulations also requires that inservice examinations of components and system pressure tests conducted during successive 120-month inspection intervals shall comply with the requirements in the latest edition and addenda of the Code incorporated by reference in 10 CFR 50.55a(b) on the date 12 months prior to the start of the 120-month inspection interval, subject to the limitations and modifications listed therein. The components (including supports) may meet requirements set forth in subsequent editions and addenda of this Code which are incorporated by reference in 10 CFR 50.55a(b) subject to the limitations and modifications listed therein. The Licensee, Rochester Gas and Electric Corporation, has prepared the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection ( ISI) Program Plan to meet the requirements of the 1986 Edition of the ASME Code Section XI. The third 10-year interval began January 1; 1990 and ends December 31, 1999.
Also, performing this type of examination at a constant frequency rather than a year or two following a major examination of that same component will produce more meaningful results.Evaluation:
As  required by  10 CFR  50.55a(g)(5),  if the licensee determines that certain Code examination requirements are impractical and requests relief from them, the licensee shall submit information and justifications to the Nuclear Regulatory Commission (NRC) to support that determination.
Paragraph IWB-2420(a),"Successive Inspections," states that the sequence of component examinations established during the first inspection interval shall be repeated during each successive inspection interval, to the extent practical.
 
'Pursuant to    10 CFR 50.55a(g)(6), the NRC will evaluate the licensee's determinations under 10 CFR 50.55a(g)(5) that Code requirements are impractical. The NRC may grant relief and may impose alternative requirements that are determined to be authorized by law, will not endanger life or property or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the if 6'
licensee that could result      the requirements were imposed on the facility.
The  information in the R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan (Reference 3), submitted July 21, 1989, was reviewed, including the requests for relief from the ASHE Code Section XI requirements which the Licensee has determined to be impractical. Review of the ISI Program Plan was performed using the Standard Review Plans of NUREG-0800 (Reference 4), Section 5.2.4, "Reactor Coolant Boundary Inservice Inspections and Testing," and Section 6.6, "Inservice Inspection of Class 2 and 3 Components."
In  a  letter dated November 16, 1989 (Reference 5), the NRC requested additional information required in order to complete the review of the ISI Program Plan. Additional information was provided by the Licensee in a submittal dated January 16,    1990 (Reference  6).
The R. E. Ginna    Nuclear Power Station Third 10-Year Interval ISI Program Plan is evaluated in Section 2 of this report. The ISI Program Plan is evaluated for (a) compliance with the appropriate edition/addenda of Section XI, (b) acceptability of examination sample, (c) correctness of the application of system or component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous NRC reviews.
The  requests for relief are evaluated in Section 3 of this report. Unless otherwise stated, references to the Code refer to the ASHE Code, Section XI, 1986 Edition. Specific inservice test (IST) programs for pumps and valves are being evaluated in other reports.
: 2. EVALUATION OF INSERVICE 0
INSPECTION PROGRAM PLAN This evaluation consisted of a review of the applicable program documents to determine whether or not they are in compliance with the Code requirements and any license conditions pertinent to ISI activities.            This section describes the submittals reviewed and the results of the review.
: 2. 1  Oocuments  Evaluated Review has been completed on the        following information provided    by the Licensee:
(a)    R. E. Ginna  Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan; and (b)    Letter, dated January 16, 1990, containing the Licensee's response to the NRC request for additional information.
2.2    Compliance with Code    Re  uirements 2.2.1  Com  liance with  A    licable  Code Editions The  Inservice Inspection Program Play shall be based        on  the Code editions defined in 10 CFR 50.55a(g)(4) and 10 CFR 50.55a(b).          Based on the starting date of January 1, 1990, for the R. E. Ginna Nuclear Power Station, the Code applicable to the third 10-year interval ISI program plan is the 1986 Edition. As stated in Section 1 of this report, the Licensee has written the R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan to meet the requirements of the,1986 Edition of the ASHE Code.
I 2.2.2  Acce  tabilit of    the Examination    Sam le Inservice volumetric, surface,      and  visual examinations shall  be performed on ASHE Code Class    1, 2, and 3 components and their supports using sampling schedules    described in Section XI of the ASME Code and
 
A 0
10 CFR  50.55a(b). Sample size and weld selection have been implemented in accordance with the Code and appear to be correct.
2.2.3    Exclusion Criteria The  criteria  used  to exclude components from examination shall be consistent with Paragraphs IWB-1220, IWC-1220, IWC-1230, IWO-1220', and 10 CFR 50.55a(b). The exclusion criteria have been applied by the Licensee in accordance with the Code as discussed in the ISI Program Plan and appear to be correct.
2.2.4    Au mented  Examination Commitments In addition to the requirements specified in Section XI of the ASME Code, the Licensee has committed to perform augmented examinations in accordance with NRC Regulatory Guide 1. 14, "Reactor Coolant Pump Flywheel Integrity,"
Revision 1, (Reference 7) and NRC Regulatory Gu'ide 1. 150, "Ultrasonic Testing of Reactor Vessel Welds Ouring Preservice and Inservice Examinations," Revision 1 (Reference 8).
Also, circumferential butt welds in high energy piping outside of containment where a failure would result in unacceptable consequences will receive radiographic or ultrasonic volumetric examinations and magnetic particle surface examinations.
'2.3  Conclusions Based on    review of the documents listed above,  it is concluded that the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan is acceptable and in compliance with 10 CFR  50.55a(g)(4).
: 3. EVALUATION OF RELIEF REQUESTS Requests    for relief from the    ASHE Code  requirements that the Licensee has determined to be impractical for the third 10-year inspection interval are evaluated in the following sections.
: 3. 1  Class    1 Com  onents 3.1.1    Reactor Pressure    Vessel
: 3. 1. 1. 1   Re uest for Relief   No. 1 Examination Cate or B-A   Item Bl.30.
Deferral of   RPV Shell-to-Flan e Weld Examinations Code Re uirement:   Section XI, Table IWB-2500-1, Examination Category B-A, Item 81.30 requires a 100% volumetric examination of the Reactor Pressure Vessel shell-to-flange weld as defined by Figure IWB-2500-4. Note 5 states that,     if partial examinations are conducted from the flange face, the remaining volumetric examinations required to be conducted from the vessel wall may be performed at or near the end of each inspection interval. Note 6 states that the examination of shell-to-flange welds may be performed during the first and'hird inspection periods in conjunction with the nozzle examination of Examination Category B-D. At least 50% of shell-to-flange welds shall be examined by the end of the first inspection period and the remainder by the end of the third inspection period.
Licensee's Code Relief Re uest: Relief is requested to defer the volumetric examination of the Reactor Pressure Vessel (RPV) shell-to flange weld to the end of the inspection interval.
Licensee's Pro osed Alternative Examination: The Licensee states that, during the third interval, 100% of the accessible length of all RPV welds, including the shell-to-flange weld, will be performed at or near the end of the interval when all the required examinations can be performed at the same .time.
 
Licensee's Basis for Re uestin Relief: The Licensee states that the required shell-to-flange examination is impractical   if performed during the periods specified as it can be accomplished only from the flange surface.
During the first two inspection intervals, 100% of the accessible length of the RPV welds, including the shell-to-flange weld, was examined at or near the end of the interval when the entire examination could be performed from both the flange surface and the vessel wall. This is a more practical approach in that the required examinations from both surfaces can be performed at the same time.
The Licensee's January 16, 1990 submittal stated that Rochester Gas and Electric received relief for R. E. Ginna for the second interval (1979-1989) allowing deferral of all vessel mechanized examinations including category B-A to the end of the second interval. Full examination of the RPV shell-to-flange weld (Category B-A) was performed from the flange surface and from the vessel shell during the end of interval March-April 1989 refueling outage. The examination was performed in accordance with the 1974 Edition, Summer 1975 Addenda of the ASME Code.
Indications were recorded and analyzed during the series of examinations performed at the 1989 outage. Comparisons of their size to the same indications recorded during the preservice examination and the 1979 end of the first interval inservice examination led to no indications of growth of defects. The indications were sized utilizing,both conventional beam spread techniques and specially developed focused beam sizing techniques. No evidence of growth was detected by utilizing these examination techniques. These examinations were witnessed by the NRC and their consultants during the 1989 outage.
 
t I f
't)9
 
          ~                                 0 The results of the 1989 examinations with comparative sizing calculations .and fracture mechanics evaluation were submitted to the NRC on Hay 4, 1989. The data provided were accepted by the NRC on June 5, 1989 with no requirements for augmented examinations. The Licensee has, therefore, scheduled the next series of Category B-A RPV examinations for the 1999 time frame (end of this 10-year interval). Examination Category B-A in Table IWB-2500 Item number B1.30 already allows examination deferral as indicated in footnote 5 of the notes. By following the 1986 Code criteria, the Code would require a vessel-to-flange examination from the flange seal surface during the first period of the third interval. Since all reactor vessel examinations, including the vessel-to-flange weld from the flange surface and wall, were accomplished in 1989, the prescribed B-A, B1.30, Code criteria would allow another 10 years before the reexamination.
Since the examination of the RPV vessel-to-flange weld was accomplished completely in 1989, the Licensee proposes to reexamine the weld at the end of the third interval. The Licensee also believes that the results obtained from an examination performed during the first period of the third interval would not provide the best data to ensure additional safety and system reliability. Also, performing this type of examination at a constant frequency rather than a year or two following a major examination of that same component will produce more meaningful  results.
Evaluation: Paragraph IWB-2420(a), "Successive Inspections,"
states that the sequence of component examinations established during the first inspection interval shall be repeated during each successive inspection interval, to the extent practical.
Since the examinations were performed during the third period of the second interval with'NRC approval, the intent of the Code will be met by examining these welds during the third period of the third interval.
Since the examinations were performed during the third period of the second interval with'NRC approval, the intent of the Code will be met by examining these welds during the third period of the third interval.
l I t O'I II  
 
l I
t O'I II
 
== Conclusions:==
Based on the above,      it is concluded that the intent of the Code will be met by the alternative schedule, Therefore,  it is recommended that relief be granted as requested.
: 3. 1. 1.2 Re  uest for Relief  No. 2  Examination Cate or 8-D Items 83.90 and B3. 100 Reactor Pressure Vessel Nozzle-to-Vessel Welds and Nozzle Inside Radius Sections Code Re  uirement:    Section XI, Table IWB-2500-1, Examination Category B-D, Item B3.90 requires a 100% volumetric examination of the RPV nozzle-to-vessel welds as defined by Figure IWB-2500-7. Inspections may be partially deferred under the following conditions: If examinations are conducted from inside the component and the nozzle weld is examined by straight beam ultrasonic method from the nozzle bore, the remaining examinations required to be conducted from the shell inside diameter may be performed at or near the end of each inspection interval.
Examination Category B-D, Item B3. 100 requires a 100%
volumetric examination of. the RPV nozzle inside radius sections as defined by Figure IWB-2500-7. At least 25% but not more than 50% (credited) of the nozzles shall be examined by the end of the first inspection period and the remainder by the end of the inspection interval.
Licensee's Code Relief Re uest: Relief is requested to defer the volumetric examinations of the RPV nozzle-to-vessel welds and nozzle inside radius sections to the end of the inspection interval.
Licensee's Pro osed Alternative Examination: The Licensee proposes to perform both nozzle-to-vessel examinations (from the nozzle bore and from the shell inside diameter) at or near
 
I the end of the interval. The nozzle inside radius examinations will also be performed at this time. This more practical approach will allow all the required examinations to be performed at the same time on all the nozzles and nozzle inside radii.
Licensee's Basis for Re uestin Relief: The Licensee states that examinations from the nozzle bore and nozzle inside radius examinations can be performed on only two (outlets) of the six major nozzles without removal of the core barrel. The mechanized examination of the two accessible nozzle and inside radius sections is expensive, and the nozzle-to-vessel examination is only a partial examination from the nozzle bore. From a technical position considering the progress which is being made in ultrasonic examination equipment and techniques and for the correlation of data obtained from the bore with that obtained from the shell,  it is highly desirable to perform both examinations at the same time.
The  Licensee's January 16, 1990 submittal stated that Rochester Gas and Electric received relief for R. E. Ginna for the second interval (1979-1989) allowing deferral of all vessel mechanized examinations including category B-D to the end of the second interval. Full examinations of the RPV nozzle-to-vessel welds (Category B-D) were performed from the nozzle bores during the end of interval March-April 1989 refueling outage. All RPV nozzle inside radius section examinations were also performed at this time. All examinations were performed in accordance with the 1974 Edition, Summer 1975 Addenda of the ASME Code.
Indications were recorded and analyzed during the series of examinations performed at the 1989 outage. Comparisons of their size to the same indications recorded during the preservice examination and the 1979 end of the first interval inservice examination led to no indications of growth of defects. The indications were sized utilizing both
 
    ~ I ~ ~
fg'
 
conventional  beam spread  techniques and specially developed focused beam sizing techniques. No evidence of growth was detected by utilizing these examination techniques. These examinations were witnessed by the NRC and their consultants during the 1989 outage.
Results of the 1989 examinations with comparative sizing calculations and fracture mechanics evaluation were submitted to the NRC on May, 4, 1989. The data provided were accepted by the NRC on June 5, '1989 with no requirements for augmented examinations. The Licensee has, therefore, scheduled the next series of Category B-D RPV examinations for the 1999 time frame (end of this 10-year interval). The Category B-D welds and inside radius sections for all vessels other than the reactor vessel have been scheduled for examination during the three periods of the third interval. By following the 1986 Code criteria, the Code would require a nozzle examination from the bore during the first period of the third interval. Since all reactor vessel examinations, including nozzle-to-shell from both the bore and shell and nozzle inside radius sections, were accomplished in 1989, the prescribed B-D, B3.90 and B3.100 Code criteria would allow another 10 years before the reexamination.
Since the examinations were accomplished completely in 1989, the Licensee proposes to reexamine them at the end of the third interval. The Licensee also believes that the, results obtained from an examination performed during the first period of the third interval would not provide the best data to ensure additional safety and system reliability. Also, performing this type of examination at a constant frequency rather than  a year or two following a major examination of that same component  will produce more meaningful  results.
Evaluation: Paragraph IWB-2420(a), "Successive Inspections,"
states that the sequence of component examinations established during the first inspection interval shall be repeated during 10
 
each successive      inspection interval, to the extent practical.
Since the examinations were performed during the third period of the second interval with NRC approval, the intent of the Code will be met by examining these welds during the third period of the third interval.
 
== Conclusions:==
Based on the above,            it  is concluded that the intent of the Code will be met by the alternative schedule.
Therefore,    it  is recommended that relief be granted as requested.
: 3. 1.2  Pressurizer    (No  relief  requests)
: 3. 1.3  Heat Exchan ers and Steam Generators            (No  relief requests)
: 3. 1.4  Pi in  Pressure    Boundar 3.1.4.1  Re  uest for Relief No. 16          Part  1 of  2    Examination Cate or B-K-I Item B10.10 Class          1  Pi  in  Inte  rail  Welded Attachments NOTE:    Request  for Relief. No.      16 was  withdrawn by the Licensee in the January 16, 1990 submittal, which states the following:
                  "Relief    Request Number 16 is not required by the Code. The  associated program plan tables will be corrected and updated to assure accurate accounting.
This  activity will    be performed      to reflect the
                  'non-requirement'ode          status since the associated thicknesses are < 5/8" for class 1 and < 3/4" for class 2. Relief Request Number 16 is not required and  will  be  deleted."
11
: 3. 1.5  Pum  Pressure  Boundar 3.1.5.1  Re  uest for Relief No.      4  Examination Cate or B-L-1 and B-L-2 Items B12. 10 and 812.20        Class 1 Pum Casin Welds and Pum
            ~Cssin s Code Re    uirement: Section XI, Table IWB-2500-1, Examination Category B-L-1, Item B12.10 requires a 100% volumetric examination of Class 1 pump casing welds as defined by Figure IWB-2500-16. Examination Category B-L-2, Item B12.20 requires a 100% visual (VT-3) examination of the internal surfaces of Class  1  pump  casings.
Licensee's Code Relief Re uest: Relief is requested from performing the Code-required volumetric and visual (VT-3) examinations of the reactor coolant pump casing welds and internal, surfaces, respectively.
Licensee's Pro osed Alternative Examination: A visual examination (VT-1) of the external surfaces of the welds of one pump casing will be performed.          A visual examination (VT-3) of the internal surfaces will be performed each time a pump is disassembled.      A visual examination (VT-2) of the exterior of all pumps will be performed during the hydrostatic pressure test required by Table IWB-2500-1,'Category B-P. Also, an evaluation will be performed to demonstrate the safety and serviceability of the pump casing. In making this assessment, thermal aging embrittlement and any other processes that may degrade the properties of the pump casing during service will be considered.
Licensee's Basis for      Re  uestin  Relief:  The two  reactor pumps  for  R. E. Ginna    are Westinghouse Model 93 pumps.
                                                                              'oolant Each pump casing is fabricated by welding four stainless steel (SA351 CFS) castings together.          Thus, there are three 12
 
circumferential pressure retaining welds requiring volumetric inspection in accordance with Category B-L-l.
The Licensee  states that the unsuitability of ultrasonic examination was demonstrated during the "A" reactor coolant pump examination in 1980 when an attempt was made to determine the wall thicknesses using ultrasonic examination techniques.
At that time,  it  was determined that the casing welds must be inspected using the miniature linear accelerator (HINAC).
Radiographic examination using the HINAC was performed on the R. E. Ginna "A" reactor coolant pump during the Spring 1981 refueling outage. This examination was performed by placing the HINAC inside the pump casing and placing the film on the outside of the pump. To perform the examination, the pump was completely disassembled.      Also, the insulation on the casing exterior was removed to permit film placement.
Additionally, the    pump bowl must be  dry for installation of the HINAC. Therefore, all fuel assemblies were removed from the reactor  vessel and the vessel water level lowered to below the nozzles. Complete disassembly of the pump was also required to conduct  the VT-1 examination in accordance with-'Category B-L-2.
No problems have been found with the welds at R. E. Ginna or other sites. Additionally, no problems have been found during the Category B-L-2 visual examination. Visual examination was conducted at R. E. Ginna by using the video camera on the MINAC.
The whole body exposure    to personnel during the spring 1981 refueling outage directly attributable to the reactor coolant pump  "A" examinations  is 93,067 millirem. This    does not include the dose received during the complete core unload to get the plant in condition for the reactor coolant pump
                                                            'isassembly.
13
 
The  nuclear industry has been successfully applying leak-before-break concepts to primary loop and Class 1 auxiliary piping systems of commercial nuclear power pl,ants.
Currently, the analyses supporting such concepts come under the review of the NRC by General Design Criteria-4 (GOC-4).
Eight different models of reactor coolant      pumps are used in Westinghouse  PWRs. Model 93 methodology used in the analyses is consistent with that    recommended  in NUREG-1061, Vol. 3 and GDC-4. A  finite  element stress analysis model for the Model 93 pump was  developed.
The  reactor coolant pump casings are cast stainless steel. The chemistries of each heat of material used in the pumps were used to determine the fracture toughness.        The phenomenon of thermal aging was addressed.
The program  successfully demonstrates that leak-before-break analyses are applicable to all primary pump casings of all Westinghouse  design  PWRs  for which the screening loads are reasonably applicable and the fracture toughness is known.
Evaluation: The volumetric examination is impractical to perform to the extent required by the Code because radiographic techniques for the subject pump casing welds require complete disassembly of the pumps, and ultrasonic examinations are limited by the coarse grain structure inherent in thick stainless steel castings.
The  visual examination is performed to determine whether unanticipated severe degradation of the casing is occurring due to phenomena such as erosion, corrosion, or cracking. However, previous experience during examination of similar pumps at other 'plants has not shown any significant degradation of pump casings.
14
 
0 "I
I QF
~t
 
The disassembly  of the  pumps  for the sole purpose  of inspection is a major effort and, in addition to the possibility of damage to the pumps, could result in personnel receiving excessive radiation exposure. However, if the pumps are disassembled for maintenance, the Code-required volumetric and visual examinations should be performed.
 
== Conclusions:==
Based on the above evaluation,      it is concluded that the Code requirement is impractical. Therefore,      it  is recommended that relief be granted provided that (a) visual examination (VT-3) of the internal surfaces of the pumps is performed whenever the pumps are disassembled, (b) volumetric examination of the pump casing welds is performed whenever the welds are exposed due to disassembly of the pump, (c) a surface examination of the pump casing welds is performed      if the pumps are not disassembled, and (d)    if the pumps have not been disassembled, this fact should be reported by the Licensee in the ISI Summary Report at the end of the interval.
: 3. 1.6  Valve Pressure  Boundar 3.1.6.1  Re  vest for Relief No. 5 . Examination Cate or  8-M-2  Item B12.50  Class  1 Valve Bod Internal Surfaces Code Re  uirement:  Section XI, Table IWB-2500-1, Examination Category B-M-2, Item 812,50 requires- a 100% visual (VT-3) examination of Class 1 valve body internal surfaces.
Examinations are limited to at least one valve, within each group of valves that are of the same size, constructional design, and manufacturing method, and that perform similar functions in the system.
Licensee's Code Relief Re uest: Relief is requested from performing the Code-required visual (VT-3) examination of the valve body internal surfaces of one valve in each of the following four groups of Class 1 valves:
15
 
Size        Valve
~In.        Number          Mf T  e        Line Number 10          842A        Darling/Check    10-SI2-2501-A 10          842B        Darling/Check    10A-S I 2-2501- 8 10          867A        Darling/Check    10-SI2-2501-B 10          867B        Darling/Check    10A-S I 2-2501-B 10          700        Velan/Gate        10A-RCO-2501-A 10          701        Velan/Gate        10A-AC7-2501-A 10          720        Velan/Gate        10A-AC7-2501-B 10          721        Velan/Gate        10A-AC7-2501-B 853A        Velan/Gate        6A-RC-2501-A 853B        Velan/Gate        6A-RC-2501-B 852A        Velan/Check      6A-RC-2501-A 8528        Velan/Check      6A-RC-2501-B Licensee's Pro osed Alternative Examination: The Licensee states that, as standard maintenance practice dictates, when these valves are disassembled for maintenance purposes, a visual examination of the internals and internal pressure boundary surfaces will be performed to the extent practical.
Licensee's Basis for Re uestina Relief: The Licensee states that, to complete the subject examination, unnecessary expenditures of man-hours and manrem are required with essentially no compensating increase in plant safety. Also, the structural integrity afforded by valve casing material used will not significantly degrade over the lifetime of the valve.
Based on data compiled from  a plant similar in age and design to Ginna Station, it is expected that approximately 100 manhours and 5 manrem exposure would be required to disassemble, inspect, and reassemble these valv'es. Performing this visual examination under such adverse conditions, high dose rates (30 to 40 R/hr), and poor as-cast surface conditions, realistically provides little additional information as to the valve's casing integrity.
The  valve material, a high-strength cast stainless steel    (ASTt1 A351-CF8), is widely used in the nuclear industry and has 16
 
      ~
    ~
1 ~t
 
performed extremely well. The presence  of  some delta ferrite (typically 5% or more) substantially increases resistance to intergranular stress corrosion cracking. The delta ferrite also helps the material to resist pitting corrosion in chloride containing environments.
The Licensee  further states that  adequate    safety margins are inherent in the basic valve design and    that public health and safety will not be adversely affected by not performing a visual examination of the valve internal pressure boundary surfaces. Additionally, this visual examination adds little or no value to the overall safety of the plant and subjects plant personnel to unnecessary radiation exposure.
Evaluation: The visual examination is performed to determine whether unanticipated severe degradation of the valve body is occurring due to phenomena such as erosion, corrosion, or cracking. However, previous experience during examination of similar valves at other plants has not shown any significant degradation of valve bodies.
Disassembly of the valves for the sole purpose of inspection is a major effort and, in addition to the possibility of damage to the valves, could result in personnel receiving excessive radiation exposure. However,    if the valves are disassembled for maintenance, the internal surfaces should be examined.


==
==
Conclusions:==
Conclusions:==
Hased on the above evaluation,        it is concluded that the Code requirement is impractical. Therefore,        it  is recommended that relief be granted provided that (a) visual (VT-3) examination of the internal surfaces of the valves is performed whenever the internal surfaces are made accessible due to disassembly and (b)    if the valves have not been disassembled, this fact should be reported by the Licensee in the ISI Summary Report at the end of the interval.
17
l J f*
P
3: 1.7  General    (No  relief  requests) 3.2  Class    2 Com  onents 3.2. 1  Pressure    Vessels    (No  relief  requests) 3.2.2  ~Pi  in 3.2.2. 1  Re  uest  for Relief  No. 15    Examination Cate or C-F-1 and C-F-2    Items C5. 10  and C5.50 Class 2 Pi in Welds NOTE:    Request  for Relief    No. 15 was withdrawn by  the Licensee in the January 16, 1990 submittal, which states the following:
                      "Request  for Relief Number 15 is not required by the Code. In the Class 2 allocations tables, the welds concerning this relief are included in the tables and in the program plan tables. Since the relief request is not required to meet the code, this relief request will be deleted. Changes to the allocation tables and in the program plan tables will be made to insure correct accountability."
3.2.2.2    Re  uest for Relief No. 16    Part 2 of  2  Examination Cate or C-C Item C3.20 Class        2  Pi in Inte  rail Welded Attachments NOTE:    Request  for Relief    No. 16 was withdrawn by the Licensee in the January 16,    1990  submittal, which states the following:
                      "Relief  Request Number 16 is not required by the Code. The  associated program plan tables will be corrected and updated to assure accurate accounting.
This activity will be performed to reflect the "non-requirement" code status since the associated thicknesses are < 5/8" for class 1 and < 3/4" for class 2. Relief Request Number 16 is not required and  will be  deleted."
3.2.3    ~Pum  s  (No  relief  requests) 18
Ipl v
gt' kt
'' 3.2.4    Valves    (No  relief  requests) 3.2.5    General      (No  relief  requests) 3.3  Class    3 Com  onents    (No  relief  requests) 3.4  Pressure    Tests 3.4. 1  Class  1  S  stem Pressure    Tests    (No  relief requests) 3.4.2  Class    2 S  stem Pressure    Tests 3.4.2. 1  Re  uest for Relief No. 7 S stem H drostatic Test of Three Char in Pum s and Dischar e Pi in to Dischar e Isolation Valves in the Chemistr and Volume Control S stem Code Re    uirement:    Section XI, Par'agraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.
Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of Charging Pumps 1, 2, and 3 and associated discharge piping to discharge isolation valves in the Chemistry and Volume Control System at the required pressure of 3420 psig.
Licensee's Pro osed Alternative Examination: The Licensee states that, during the hydrostatic test and associated VT-2 19


intent of the Therefore, it requested.
f l
Based on the above, it is concluded that the Code will be met by the alternative schedule, is recommended that relief be granted as 3.1.1.2 Re uest for Relief No.2 Examination Cate or 8-D Items 83.90 and B3.100 Reactor Pressure Vessel Nozzle-to-Vessel Welds and Nozzle Inside Radius Sections Code Re uirement: Section XI, Table IWB-2500-1, Examination Category B-D, Item B3.90 requires a 100%volumetric examination of the RPV nozzle-to-vessel welds as defined by Figure IWB-2500-7.
, ll cN
Inspections may be partially deferred under the following conditions:
If examinations are conducted from inside the component and the nozzle weld is examined by straight beam ultrasonic method from the nozzle bore, the remaining examinations required to be conducted from the shell inside diameter may be performed at or near the end of each inspection interval.Examination Category B-D, Item B3.100 requires a 100%volumetric examination of.the RPV nozzle inside radius sections as defined by Figure IWB-2500-7.
At least 25%but not more than 50%(credited) of the nozzles shall be examined by the end of the first inspection period and the remainder by the end of the inspection interval.Licensee's Code Relief Re uest: Relief is requested to defer the volumetric examinations of the RPV nozzle-to-vessel welds and nozzle inside radius sections to the end of the inspection interval.Licensee's Pro osed Alternative Examination:
The Licensee proposes to perform both nozzle-to-vessel examinations (from the nozzle bore and from the shell inside diameter)at or near I
the end of the interval.The nozzle inside radius examinations will also be performed at this time.This more practical approach will allow all the required examinations to be performed at the same time on all the nozzles and nozzle inside radii.Licensee's Basis for Re uestin Relief: The Licensee states that examinations from the nozzle bore and nozzle inside radius examinations can be performed on only two (outlets)of the six major nozzles without removal of the core barrel.The mechanized examination of the two accessible nozzle and inside radius sections is expensive, and the nozzle-to-vessel examination is only a partial examination from the nozzle bore.From a technical position considering the progress which is being made in ultrasonic examination equipment and techniques and for the correlation of data obtained from the bore with that obtained from the shell, it is highly desirable to perform both examinations at the same time.The Licensee's January 16, 1990 submittal stated that Rochester Gas and Electric received relief for R.E.Ginna for the second interval (1979-1989) allowing deferral of all vessel mechanized examinations including category B-D to the end of the second interval.Full examinations of the RPV nozzle-to-vessel welds (Category B-D)were performed from the nozzle bores during the end of interval March-April 1989 refueling outage.All RPV nozzle inside radius section examinations were also performed at this time.All examinations were performed in accordance with the 1974 Edition, Summer 1975 Addenda of the ASME Code.Indications were recorded and analyzed during the series of examinations performed at the 1989 outage.Comparisons of their size to the same indications recorded during the preservice examination and the 1979 end of the first interval inservice examination led to no indications of growth of defects.The indications were sized utilizing both
~I~~fg' conventional beam spread techniques and specially developed focused beam sizing techniques.
No evidence of growth was detected by utilizing these examination techniques.
These examinations were witnessed by the NRC and their consultants during the 1989 outage.Results of the 1989 examinations with comparative sizing calculations and fracture mechanics evaluation were submitted to the NRC on May, 4, 1989.The data provided were accepted by the NRC on June 5,'1989 with no requirements for augmented examinations.
The Licensee has, therefore, scheduled the next series of Category B-D RPV examinations for the 1999 time frame (end of this 10-year interval).
The Category B-D welds and inside radius sections for all vessels other than the reactor vessel have been scheduled for examination during the three periods of the third interval.By following the 1986 Code criteria, the Code would require a nozzle examination from the bore during the first period of the third interval.Since all reactor vessel examinations, including nozzle-to-shell from both the bore and shell and nozzle inside radius sections, were accomplished in 1989, the prescribed B-D, B3.90 and B3.100 Code criteria would allow another 10 years before the reexamination.
Since the examinations were accomplished completely in 1989, the Licensee proposes to reexamine them at the end of the third interval.The Licensee also believes that the, results obtained from an examination performed during the first period of the third interval would not provide the best data to ensure additional safety and system reliability.
Also, performing this type of examination at a constant frequency rather than a year or two following a major examination of that same component will produce more meaningful results.Evaluation:
Paragraph IWB-2420(a),"Successive Inspections," states that the sequence of component examinations established during the first inspection interval shall be repeated during 10 each successive inspection interval, to the extent practical.
Since the examinations were performed during the third period of the second interval with NRC approval, the intent of the Code will be met by examining these welds during the third period of the third interval.Conclusions:
Based on the above, it is concluded that the intent of the Code will be met by the alternative schedule.Therefore, it is recommended that relief be granted as requested.
3.1.2 Pressurizer (No relief requests)3.1.3 Heat Exchan ers and Steam Generators (No relief requests)3.1.4 Pi in Pressure Boundar 3.1.4.1 Re uest for Relief No.16 Part 1 of 2 Examination Cate or B-K-I Item B10.10 Class 1 Pi in Inte rail Welded Attachments NOTE: Request for Relief.No.16 was withdrawn by the Licensee in the January 16, 1990 submittal, which states the following: "Relief Request Number 16 is not required by the Code.The associated program plan tables will be corrected and updated to assure accurate accounting.
This activity will be performed to reflect the'non-requirement'ode status since the associated thicknesses are<5/8" for class 1 and<3/4" for class 2.Relief Request Number 16 is not required and will be deleted." 11


3.1.5 Pum Pressure Boundar 3.1.5.1 Re uest for Relief No.4 Examination Cate or B-L-1 and B-L-2 Items B12.10 and 812.20 Class 1 Pum Casin Welds and Pum~Cssin s Code Re uirement: Section XI, Table IWB-2500-1, Examination Category B-L-1, Item B12.10 requires a 100%volumetric examination of Class 1 pump casing welds as defined by Figure IWB-2500-16.
visual examination, the charging pumps and associated discharge piping to the first isolation valves will be tested at a pressure of 2400 psig.
Examination Category B-L-2, Item B12.20 requires a 100%visual (VT-3)examination of the internal surfaces of Class 1 pump casings.Licensee's Code Relief Re uest: Relief is requested from performing the Code-required volumetric and visual (VT-3)examinations of the reactor coolant pump casing welds and internal, surfaces, respectively.
Licensee's Basis for Re uestin Relief: The Licensee states that the charging pumps have a hydrostatic test pressure limitation on the seals of 2400 psig, as specified by the pump manufacturer. As a result, the pumps and associated discharge piping to the first isolation valves cannot be tested to the required Code test pressure.
Licensee's Pro osed Alternative Examination:
Evaluation:      The pump design does    not permit hydrostatic testing of the CVC charging pumps and associated discharge piping to the first isolation valves at the Code-required test pressure without overpressurizing the pump seals. Therefore, the Code-required hydrostatic test pressure is impractical to attain. The Licensee's proposed alternative test at the reduced pressure of 2400 psig will provide reasonable assurance of the continued inservice structural integrity.
A visual examination (VT-1)of the external surfaces of the welds of one pump casing will be performed.
 
A visual examination (VT-3)of the internal surfaces will be performed each time a pump is disassembled.
== Conclusions:==
A visual examination (VT-2)of the exterior of all pumps will be performed during the hydrostatic pressure test required by Table IWB-2500-1,'Category B-P.Also, an evaluation will be performed to demonstrate the safety and serviceability of the pump casing.In making this assessment, thermal aging embrittlement and any other processes that may degrade the properties of the pump casing during service will be considered.
Based on the above,          it is concluded that the Code-required hydrostatic test is impractical to perform.
Licensee's Basis for Re uestin Relief: The two reactor'oolant pumps for R.E.Ginna are Westinghouse Model 93 pumps.Each pump casing is fabricated by welding four stainless steel (SA351 CFS)castings together.Thus, there are three 12 circumferential pressure retaining welds requiring volumetric inspection in accordance with Category B-L-l.The Licensee states that the unsuitability of ultrasonic examination was demonstrated during the"A" reactor coolant pump examination in 1980 when an attempt was made to determine the wall thicknesses using ultrasonic examination techniques.
Therefore,    it is recommended that relief be granted as requested.
At that time, it was determined that the casing welds must be inspected using the miniature linear accelerator (HINAC).Radiographic examination using the HINAC was performed on the R.E.Ginna"A" reactor coolant pump during the Spring 1981 refueling outage.This examination was performed by placing the HINAC inside the pump casing and placing the film on the outside of the pump.To perform the examination, the pump was completely disassembled.
3.4.2.2 Re   uest for Relief   No. 8  S stem  H  drostatic Test of Reactor Coolant  S  stem Over  ressure Protection Nitro en Accumulator S  stem Valves    PCV 430 and   PCV  431C Code Re   uirement:     Section XI, Paragraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number 20
Also, the insulation on the casing exterior was removed to permit film placement.
 
Additionally, the pump bowl must be dry for installation of the HINAC.Therefore, all fuel assemblies were removed from the reactor vessel and the vessel water level lowered to below the nozzles.Complete disassembly of the pump was also required to conduct the VT-1 examination in accordance with-'Category B-L-2.No problems have been found with the welds at R.E.Ginna or other sites.Additionally, no problems have been found during the Category B-L-2 visual examination.
I' iO
Visual examination was conducted at R.E.Ginna by using the video camera on the MINAC.The whole body exposure to personnel during the spring 1981 refueling outage directly attributable to the reactor coolant pump"A" examinations is 93,067 millirem.This does not include the dose received during the complete core unload to get the plant in condition for the reactor coolant pump'isassembly.
 
13 The nuclear industry has been successfully applying leak-before-break concepts to primary loop and Class 1 auxiliary piping systems of commercial nuclear power pl,ants.Currently, the analyses supporting such concepts come under the review of the NRC by General Design Criteria-4 (GOC-4).Eight different models of reactor coolant pumps are used in Westinghouse PWRs.Model 93 methodology used in the analyses is consistent with that recommended in NUREG-1061, Vol.3 and GDC-4.A finite element stress analysis model for the Model 93 pump was developed.
e of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety 'or relief valves, the system design pressure shall be substituted for the system pressure.
The reactor coolant pump casings are cast stainless steel.The chemistries of each heat of material used in the pumps were used to determine the fracture toughness.
Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the reactor coolant system (RCS) overpressure protection nitrogen accumulator system valves PCV 430 and PCV 431C at the required test pressure of 137.5 psig.
The phenomenon of thermal aging was addressed.
Licensee's Pro osed Alternative Examination: The Licensee states that the RCS overpressure nitrogen accumulator system will be tested per the Code requirements up to the flex connection to the valve operator. In addition, an inservice pressure test at operating pressure will be performed once each inspection period on the piping, including the diaphragm.
The program successfully demonstrates that leak-before-break analyses are applicable to all primary pump casings of all Westinghouse design PWRs for which the screening loads are reasonably applicable and the fracture toughness is known.Evaluation:
Licensee's Basis for Reouestin Relief: The Licensee states that the diaphragms in the subject valve operators are only designed to withstand a maximum pressure of 105 psig and, therefore, cannot be tested to the required Code test pressure.
The volumetric examination is impractical to perform to the extent required by the Code because radiographic techniques for the subject pump casing welds require complete disassembly of the pumps, and ultrasonic examinations are limited by the coarse grain structure inherent in thick stainless steel castings.The visual examination is performed to determine whether unanticipated severe degradation of the casing is occurring due to phenomena such as erosion, corrosion, or cracking.However, previous experience during examination of similar pumps at other'plants has not shown any significant degradation of pump casings.14 0"I I QF~t The disassembly of the pumps for the sole purpose of inspection is a major effort and, in addition to the possibility of damage to the pumps, could result in personnel receiving excessive radiation exposure.However, if the pumps are disassembled for maintenance, the Code-required volumetric and visual examinations should be performed.
Evaluation:  The system's design does not permit hydrostatic testing of the RCS overpressure protection nitrogen accumulator system valves PCV 430 and PCV 431C at the Code-required test pressure without overpressurizing the diaphragms in the operators of these valves. Therefore; the Code-required hydrostatic test is impractical to perform. The inservice pressure test, which includes the diaphragms, will provide, reasonable assurance of the continued inservice structural integrity.
21
 
== Conclusions:==
Based on the above,      it is concluded that the Code-required hydrostatic test is impractical to perform.
Therefore,    it is recommended that relief be granted as requested.
3.4.2.3 Re  uest for Relief No. 9 S stem H drostatic Test of the Secondar Side of the Steam Generator and Associated Main Steam
        ~Pl 1 II Code Re  uirement:    Section XI, Paragraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1.10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.
Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the secondary side of the Steam Generator and associated Main Steam piping at the required pressure of 1356 psig.
Licensee's Pro osed Alternative Examination: The Licensee states that the secondary side of the Steam Generator and associated Hain Steam piping will be tested at a pressure of 1194 psig, which corresponds to 1. 10 times the system pressure.
Licensee's Basis for Re uestin Relief: The Licensee states that a pressure differential limitation of 800 psig between the primary and secondary side of the Steam Generator has been adopted. This was established early in plant life due to the 22
 
~ ~
experiences  of  some plants with primary side tubesheet cladding separation. To maintain this 800 psig differential and the required pressure on the secondary side, the primary system must be heated to a minimum of 160'F which would result in a problem with heat balance and a potential operational problem during implementation of the test procedure. The administrative controls necessary to ensure a proper and safe test and the complexity required for the test procedure result in a situation that should be minimized.
In addition to the Section XI volumetric and surface examination requirements, the piping is part of the augmented inspection program since    it falls within the high energy break criteria.
The  Licensee's January 16, 1990 submittal states the following:
      "The 800 psi  differential pressure limitation  was established early in the plant life of R. E. Ginna.
This limitation was initiated after several Westinghouse Steam Generators with explosively welded tubesheet cladding experienced primary side tubesheet cladding separation. The hydrostatic test causes the Steam Generator tubesheet to deflect due to reverse loading (in the direction opposite to normal operation). The pressure limitation of 800 psi is an attempt to limit tubesheet deflection and the potential for cladding failure.
To  maintain an 800 psi differential pressure across the tubesheet while performing a Code acceptable hydrostatic test of 1356 psi (1.25 x 1085 psi), the required primary system pressure would be 556 psi (1356 psi - 800 psi).
During, the period of time that a hydrostatic test and associated examination would be performed, the plant is operating with the Low Temperature Overpressure Protection System (LTOP) set points in effect. The LTOP set points are used to limit primary system pressure to 400 psi or less. In order to pressurize the primary system to 556 psi (a value greater than 400 psi) the LTOP set points must be changed to higher values and additionally the steam generators are required to be functional due to primary system pressure. When the steam generators are functional, 23
 
I P'g gap
 
safety valises and level instrumentation are also required to be functional. Safety valves cannot be functional during a hydrostatic test due to gagging requirements and level instrumentation cannot be functional since the steam generators are water solid and therefore level readings would be off scale.
LTOP set points are changed when the primary system temperature reaches 350 degree F, thus there is the potential of a Technical Specification violation    if the primary system is pressurized to 556 psi.
Technical Specification 3. 1. 1.2 limits the tubesheet differential temperature to 100 degree F while the potential for a differential temperature of 290 degree  F (350 deg. F - 60 deg. F) exists.
In order to alleviate these problems, the Steam Generator and downstream piping, to the class boundary, will be pressurized to 1194 psi (1. I x 1085 psi) instead of 1356 psi (1.25 x 1085 psi).
This action will minimize the potential for tubesheet problems while fulfilling the intent of a hydrostatic test to insure the integrity of the pressure boundary.
In addition to the above test, system pressure tests will  be performed each period at system operating pressure and temperature to assure system integrity.
The steam generator and associated systems are also subjected to volumetric and surface (Section XI) examinations. The Feedwater and Hain Steam piping is also included in an augmented inservice inspection program to provide additional assurances of the system  integrity."
Evaluation: The system's design does not permit pressurizing the secondary side of the Steam Generator and associated Hain Steam piping to the Code-required test pressure without the potential of cladding failure due to reverse loading.
Therefore, the Code-required hydrostatic test is impractical to perform. Pressurizing the components to the alternative test pressures will provide reasonable assurance of the continued inservice structural integrity.


==
==
Conclusions:==
Conclusions:==
Based on the above,    it is concluded that the Code-required hydrostatic test of the secondary side of the Steam Generator and associated Hain Steam piping is 24
impractical. Therefore,  it is  recommended  that relief be granted as  requested.
3.4.2.4 Re  uest for Relief No.'13    S stem  H drostatic Test of Non-ISI Classified  S stems Code Re  uirement:    Section XI, Paragraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.
Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the non- ISI classified systems, which do not carry radioactive gases or fluids, that contain lines penetrating primary containment.
Relief is requested'for the following lines:
Penetration                          Descri tion 120        Nitrogen Fill  to Safety Injection Accumulators; I-SI-903 121        Nitrogen Supply to Pressurizer Relief Tank; 3/4-RC-151 121        Reactor Nakeup Water to Pressurizer      Relief Tank; 2-RC-151 124        Post Accident Test Point Containment Atmosphere 124        Post Accident Test Point Containment Recirculating Filter and Cooling Unit C Discharge 132        Containment Depressurization and Mini-Purge Exhaust 202        Hydrogen Supply to Recombiner 8 Hain Burner 202        Hydrogen Supply to Recombiner 8 Pilot Burner 203        Post Accident Test Point Containment Atmosphere 25
(continued)
Penetration                        Descri tion 203      Post  Accident  Test Point Containment Recirculation Filter and Cooling  Unit 'D Discharge 210        Recombiner Oxygen Makeup to Containment 301        Heating Steam Supply to Containment; 2-HS-150-4 303        Heating Steam Condensate Return from Containment 304        Hydrogen Supply to Recombiner A Main Burner 304        Hydrogen Supply to Recombiner A Pilot Burner 305        Post Accident Test Point Containment Atmosphere 305        Post Accident Test Point Containment Recirculating Filter and Cooling Unit A Discharge 305        Post Accident Test Point Containment Recirculating Filter and Cooling Unit B Discharge 305        Containment  Air Sample Inlet 305        Containment  Air Sample Outlet 307        Fire Service Water 309        Containment Mini-Purge Supply 310        Instrument Air Supply to Containment; 2-IA-125-8 310        Service Air Supply to Containment 313        Containment Leakrate Test Connection Depressurization 317        Containment Leakrate Test Connection Supply; 6-AT-150-4 324        Demineralized Water 332        Hydrogen Monitor A Inlet 332        Hydrogen Monitor 8 Inlet 332        Hydrogen Monitor Outlet Licensee's Pro osed Alternative Examination: The Licensee proposes to test these lines in accordance with 10 CFR 50 Appendix J, "Reactor Cont'ainment Leakage Testing for Water Cooled Power Reactor," commensurate with the safety function the line performs in accordance with Technical Specification, Surveillance requirements. Additionally, at least once each period, exposed portions of the lines penetrating primary containment will be examined during normal system operation, Licensee's Basis for Re uestin Relief: The Licensee states that the safety function of these lines is to become part of the containment isolation system during periods when containment isolation is required. Therefore, the pressure testing requirements should be based on the containment system design not the associated process system design requirements.
26
l I I
Al)>>


Based on the above evaluation, it is concluded that the Code requirement is impractical.
The  Licensee's January 16, 1990 submittal states the following:
Therefore, it is recommended that relief be granted provided that (a)visual examination (VT-3)of the internal surfaces of the pumps is performed whenever the pumps are disassembled, (b)volumetric examination of the pump casing welds is performed whenever the welds are exposed due to disassembly of the pump, (c)a surface examination of the pump casing welds is performed if the pumps are not disassembled, and (d)if the pumps have not been disassembled, this fact should be reported by the Licensee in the ISI Summary Report at the end of the interval.3.1.6 Valve Pressure Boundar 3.1.6.1 Re vest for Relief No.5.Examination Cate or 8-M-2 Item B12.50 Class 1 Valve Bod Internal Surfaces Code Re uirement: Section XI, Table IWB-2500-1, Examination Category B-M-2, Item 812,50 requires-a 100%visual (VT-3)examination of Class 1 valve body internal surfaces.Examinations are limited to at least one valve, within each group of valves that are of the same size, constructional design, and manufacturing method, and that perform similar functions in the system.Licensee's Code Relief Re uest: Relief is requested from performing the Code-required visual (VT-3)examination of the valve body internal surfaces of one valve in each of the following four groups of Class 1 valves: 15 Size~In.10 10 10 10 10 10 10 10 Valve Number 842A 842B 867A 867B 700 701 720 721 853A 853B 852A 8528 Mf T e Darling/Check Darling/Check Darling/Check Darling/Check Velan/Gate Velan/Gate Velan/Gate Velan/Gate Velan/Gate Velan/Gate Velan/Check Velan/Check Line Number 10-SI2-2501-A 10A-S I 2-2501-8 10-SI2-2501-B 10A-S I 2-2501-B 10A-RCO-2501-A 10A-AC7-2501-A 10A-AC7-2501-B 10A-AC7-2501-B 6A-RC-2501-A 6A-RC-2501-B 6A-RC-2501-A 6A-RC-2501-B Licensee's Pro osed Alternative Examination:
      "Due to the vintage of the R. E. Ginna Plant, the piping within these penetration boundaries was not constructed to Class 2 requirements,   Regulatory Guide 1.26 does not require these penetrations to be classified as (juality Group B or Class 2. However, Rochester Gas and Electric has optionally classified these lines Class 2. For optionally classified piping, IWA-1320(e) allows the Owner the option to apply the Section XI rules. In the case of these lines, Rochester Gas & Electric has concluded that Appendix J testing and a VT-2 examination once per period during normal system operation  will  provide testing commensurate with the safety function.     In addition, these lines are now subject to ASHE Section XI rules for Repairs and Replacements."
The Licensee states that, as standard maintenance practice dictates, when these valves are disassembled for maintenance purposes, a visual examination of the internals and internal pressure boundary surfaces will be performed to the extent practical.
Evaluation: Although these lines were not constructed to Class 2 requirements, the Licensee has not shown that the system's safety criteria permit these lines to be nonnuclear safety class. Therefore, paragraph IWA-1320(e) may not be applicable.
Licensee's Basis for Re uestina Relief: The Licensee states that, to complete the subject examination, unnecessary expenditures of man-hours and manrem are required with essentially no compensating increase in plant safety.Also, the structural integrity afforded by valve casing material used will not significantly degrade over the lifetime of the valve.Based on data compiled from a plant similar in age and design to Ginna Station, it is expected that approximately 100 manhours and 5 manrem exposure would be required to disassemble, inspect, and reassemble these valv'es.Performing this visual examination under such adverse conditions, high dose rates (30 to 40 R/hr), and poor as-cast surface conditions, realistically provides little additional information as to the valve's casing integrity.
In addition, Appendix J addresses the structural integrity of the primary containment, not the structural integrity of the Code Class 2 process piping for which relief is being requested. The request for relief does not contain information about the pressures involved. The proposed Appendix J test pressure may be much lower than the Code-required test pressure, in which case the inservice structural integrity would not be identified. Also, the proposed Appendix J test does not identify the location of a leak    if present.
The valve material, a high-strength cast stainless steel (ASTt1 A351-CF8), is widely used in the nuclear industry and has 16
I
~~1~t performed extremely well.The presence of some delta ferrite (typically 5%or more)substantially increases resistance to intergranular stress corrosion cracking.The delta ferrite also helps the material to resist pitting corrosion in chloride containing environments.
The Licensee further states that adequate safety margins are inherent in the basic valve design and that public health and safety will not be adversely affected by not performing a visual examination of the valve internal pressure boundary surfaces.Additionally, this visual examination adds little or no value to the overall safety of the plant and subjects plant personnel to unnecessary radiation exposure.Evaluation:
The visual examination is performed to determine whether unanticipated severe degradation of the valve body is occurring due to phenomena such as erosion, corrosion, or cracking.However, previous experience during examination of similar valves at other plants has not shown any significant degradation of valve bodies.Disassembly of the valves for the sole purpose of inspection is a major effort and, in addition to the possibility of damage to the valves, could result in personnel receiving excessive radiation exposure.However, if the valves are disassembled for maintenance, the internal surfaces should be examined.Conclusions:
Hased on the above evaluation, it is concluded that the Code requirement is impractical.
Therefore, it is recommended that relief be granted provided that (a)visual (VT-3)examination of the internal surfaces of the valves is performed whenever the internal surfaces are made accessible due to disassembly and (b)if the valves have not been disassembled, this fact should be reported by the Licensee in the ISI Summary Report at the end of the interval.17 l J f*P 3: 1.7 General (No relief requests)3.2 Class 2 Com onents 3.2.1 Pressure Vessels (No relief requests)3.2.2~Pi in 3.2.2.1 Re uest for Relief No.15 Examination Cate or C-F-1 and C-F-2 Items C5.10 and C5.50 Class 2 Pi in Welds NOTE: Request for Relief No.15 was withdrawn by the Licensee in the January 16, 1990 submittal, which states the following: "Request for Relief Number 15 is not required by the Code.In the Class 2 allocations tables, the welds concerning this relief are included in the tables and in the program plan tables.Since the relief request is not required to meet the code, this relief request will be deleted.Changes to the allocation tables and in the program plan tables will be made to insure correct accountability." 3.2.2.2 Re uest for Relief No.16 Part 2 of 2 Examination Cate or C-C Item C3.20 Class 2 Pi in Inte rail Welded Attachments NOTE: Request for Relief No.16 was withdrawn by the Licensee in the January 16, 1990 submittal, which states the following: "Relief Request Number 16 is not required by the Code.The associated program plan tables will be corrected and updated to assure accurate accounting.
This activity will be performed to reflect the"non-requirement" code status since the associated thicknesses are<5/8" for class 1 and<3/4" for class 2.Relief Request Number 16 is not required and will be deleted." 3.2.3~Pum s (No relief requests)18 I pl v gt'kt
''3.2.4 Valves (No relief requests)3.2.5 General (No relief requests)3.3 Class 3 Com onents (No relief requests)3.4 Pressure Tests 3.4.1 Class 1 S stem Pressure Tests (No relief requests)3.4.2 Class 2 S stem Pressure Tests 3.4.2.1 Re uest for Relief No.7 S stem H drostatic Test of Three Char in Pum s and Dischar e Pi in to Dischar e Isolation Valves in the Chemistr and Volume Control S stem Code Re uirement: Section XI, Par'agraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1.10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F.The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested.For systems (or portions of systems)not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of Charging Pumps 1, 2, and 3 and associated discharge piping to discharge isolation valves in the Chemistry and Volume Control System at the required pressure of 3420 psig.Licensee's Pro osed Alternative Examination:
The Licensee states that, during the hydrostatic test and associated VT-2 19 f l , ll cN visual examination, the charging pumps and associated discharge piping to the first isolation valves will be tested at a pressure of 2400 psig.Licensee's Basis for Re uestin Relief: The Licensee states that the charging pumps have a hydrostatic test pressure limitation on the seals of 2400 psig, as specified by the pump manufacturer.
As a result, the pumps and associated discharge piping to the first isolation valves cannot be tested to the required Code test pressure.Evaluation:
The pump design does not permit hydrostatic testing of the CVC charging pumps and associated discharge piping to the first isolation valves at the Code-required test pressure without overpressurizing the pump seals.Therefore, the Code-required hydrostatic test pressure is impractical to attain.The Licensee's proposed alternative test at the reduced pressure of 2400 psig will provide reasonable assurance of the continued inservice structural integrity.


==
==
Conclusions:==
Conclusions:==
Based on the above evaluation,    it  is concluded that the Licensee has not justified the determination of impracticality. Therefore,    it is recommended that relief be denied.
27
0 I l
t'~I
  ~ )
e 3.4.3  Class  3 S  stem Pressure  Tests 3.4.3. 1  Re  uest for Relief No. 6. S stem        H  drostatic Test of the Radioactive Waste Holdu Tank NOTE:    Request  for Relief  No. 6 was withdrawn by      the Licensee in the January 16, 1990 submittal, which states the following:
                    "This request is specific to the Code hydrostatic test requirements concerning the waste hold-up tank.
Liquid waste from various locations in the plant including the reactor coolant drain tank, chemical drain tank, intermediate and auxiliary building sumps, floor, laundry and shower drains are diverted to the waste hold-up tank. During cold shut down and refueling outages, the level in this tank varies depending on the activities performed during an outage. If required to perform the Code examination when the tank is full, there is a possibility of a hazardous situation occurring. Liquid waste could be diverted to the waste hold-up tank while performing the required Code static head examination. This action could result in a liquid radioactive waste spill at one of various locations.
It was  the intent of this relief request to prevent a hazardous    event from occurring. Upon review of your inquiry, we have concluded that          it is possible to perform the required examination on this component.
It will require greater coordination with Operations and plant outage activities than is normally expected, but    it  can be performed.      Therefore, Relief Request Number 6 is no longer required."
3.4.3.2  Re  vest for Relief    No. 10    S  stem  H  drostatic Test of the Standb      Auxiliar  Feedwater    Pum  Recirculation Line Code Re      uirement:  Section XI, Paragraph IWD-5223(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems 28


Based on the above, it is concluded that the Code-required hydrostatic test is impractical to perform.Therefore, it is recommended that relief be granted as requested.
(or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.
3.4.2.2 Re uest for Relief No.8 S stem H drostatic Test of Reactor Coolant S stem Over ressure Protection Nitro en Accumulator S stem Valves PCV 430 and PCV 431C Code Re uirement: Section XI, Paragraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1.10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F.The system pressure shall be the lowest pressure setting among the number 20 I'iO e of safety or relief valves provided for overpressure protection within the boundary of the system to be tested.For systems (or portions of systems)not provided with safety'or relief valves, the system design pressure shall be substituted for the system pressure.Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the reactor coolant system (RCS)overpressure protection nitrogen accumulator system valves PCV 430 and PCV 431C at the required test pressure of 137.5 psig.Licensee's Pro osed Alternative Examination:
Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic, test of the Standby Auxiliary Feedwater Pump recirculation line between valves AOV 9710A and AOV 97108 and their associated downstream flow orifices.
The Licensee states that the RCS overpressure nitrogen accumulator system will be tested per the Code requirements up to the flex connection to the valve operator.In addition, an inservice pressure test at operating pressure will be performed once each inspection period on the piping, including the diaphragm.
Licensee's Pro osed Alternative Examination: The Licensee states that the Class 3 portion of this piping shall be VT-2 examined at operational discharge pressure once each period during functional testing.
Licensee's Basis for Reouestin Relief: The Licensee states that the diaphragms in the subject valve operators are only designed to withstand a maximum pressure of 105 psig and, therefore, cannot be tested to the required Code test pressure.Evaluation:
Licensee's Basis for Re uestin Relief: The Licensee states that, in order to hydrostatically test this piping to Section XI requirements, the pressure reducing flow orifices downstream of valve AOV 9710A and B would require removal and blank flanges installed. System piping does not provide an isolation valve between the orifices and the Condensate Supply Tank. A significant reduction in tank level would be required to facilitate orifice removal, which is considered to be impractical.
The system's design does not permit hydrostatic testing of the RCS overpressure protection nitrogen accumulator system valves PCV 430 and PCV 431C at the Code-required test pressure without overpressurizing the diaphragms in the operators of these valves.Therefore; the Code-required hydrostatic test is impractical to perform.The inservice pressure test, which includes the diaphragms, will provide, reasonable assurance of the continued inservice structural integrity.
Evaluation: The Licensee has not provided adequate information to justify the determination of impracticality. Information that should be addressed includes (a) why the Licensee considers it impractical to lower the Condensate Supply Tank level and (b) whether or not the use of freeze plugs has been considered and, if so, why it would be impractical to use them.
21


==
==
Conclusions:==
Conclusions:==
Based on the above,  it is concluded that the Licensee has not demonstrated that the Code-required hydrostatic test is impractical. Therefore,    it is recommended that relief be denied.
29
3.4.3.3 Re  uest for Relief No. 11 S stem H drostatic Test of the Boric Acid Filter and Associated Pi in in the Chemical and Volume Control S stem NOTE:    Request for Relief  No. 11 was withdrawn by    the Licensee in the January 16, 1990 submittal, which states the following:
              "The flange gasket was 'reviewed    with new  technical information that eliminated concerns over the safe working pressure of the Boric Acid Filter housing flange gasket.
Upon  review of your inquiry, it has been concluded that the Hydrostatic test is possible and will be incorporated into the plan. Therefore, Relief Request Number 11 is no longer required."
3.4.3.4 Re  uest for Relief No. 12 S stem    H  drostatic Test of Portions of the Emer enc Diesel Generation      S  stem Code Re  uirement:  Section XI, Paragraph IWD-5223(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.
Licen'see's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the following portions of the Emergency Diesel Generation System:
(a)  Starting Air, including receiver tanks      and associated piping, 30
0 \
(Wl


Based on the above, Code-required hydrostatic test is Therefore, it is recommended that requested.
(b)  Fuel Oil Transfer pumps, suction and discharge    lines, including miscellaneous lines terminating at oil storage tanks, and (c)   Jacket Cooling Water system, including miscellaneous    lines terminating at the cooling water expansion tanks.
it is concluded that the impractical to perform.relief be granted as 3.4.2.3 Re uest for Relief No.9 S stem H drostatic Test of the Secondar Side of the Steam Generator and Associated Main Steam~Pl 1 II Code Re uirement: Section XI, Paragraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1.10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F.The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested.For systems (or portions of systems)not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the secondary side of the Steam Generator and associated Main Steam piping at the required pressure of 1356 psig.Licensee's Pro osed Alternative Examination:
Licensee's Pro osed Alternative Examination:     The Licensee states that inservice testing shall be performed on the Air Start System at least once each period in accordance with the requirements of Section XI. Additionally, once each quarter, a pressure decay test shall be performed on the air receiver to verify check valve operability in the reverse direction for the air receiver inlet check.
The Licensee states that the secondary side of the Steam Generator and associated Hain Steam piping will be tested at a pressure of 1194 psig, which corresponds to 1.10 times the system pressure.Licensee's Basis for Re uestin Relief: The Licensee states that a pressure differential limitation of 800 psig between the primary and secondary side of the Steam Generator has been adopted.This was established early in plant life due to the 22
System  functional testing shall be performed at least once each period on the Diesel Fuel Oil Transfer and Jacket Cooling Water Systems in accordance with the requirements of Section XI.
~~
In addition to the testing discussed    above, Technical Specification 6.4. 1 requires surveillance testing to be performed on a monthly basis, such as verifying operability of the fuel oil transfer pumps and that the diesel starts from normal standby conditions.
experiences of some plants with primary side tubesheet cladding separation.
Licensee's Basis for Re uestin Relief: The Licensee states that only portions of the piping associated with the components identified above are capable of being pressure tested.
To maintain this 800 psig differential and the required pressure on the secondary side, the primary system must be heated to a minimum of 160'F which would result in a problem with heat balance and a potential operational problem during implementation of the test procedure.
The Air Start System pressure  test would require termination prior to reaching the e6gine  skid to preclude administrating air to the Air Start Motors. This would leave that portion of piping between the Air Start  Motors to the first isolation, prior to reaching the engine  skid, untestable.
The administrative controls necessary to ensure a proper and safe test and the complexity required for the test procedure result in a situation that should be minimized.
31
In addition to the Section XI volumetric and surface examination requirements, the piping is part of the augmented inspection program since it falls within the high energy break criteria.The Licensee's January 16, 1990 submittal states the following: "The 800 psi differential pressure limitation was established early in the plant life of R.E.Ginna.This limitation was initiated after several Westinghouse Steam Generators with explosively welded tubesheet cladding experienced primary side tubesheet cladding separation.
The hydrostatic test causes the Steam Generator tubesheet to deflect due to reverse loading (in the direction opposite to normal operation).
The pressure limitation of 800 psi is an attempt to limit tubesheet deflection and the potential for cladding failure.To maintain an 800 psi differential pressure across the tubesheet while performing a Code acceptable hydrostatic test of 1356 psi (1.25 x 1085 psi), the required primary system pressure would be 556 psi (1356 psi-800 psi).During, the period of time that a hydrostatic test and associated examination would be performed, the plant is operating with the Low Temperature Overpressure Protection System (LTOP)set points in effect.The LTOP set points are used to limit primary system pressure to 400 psi or less.In order to pressurize the primary system to 556 psi (a value greater than 400 psi)the LTOP set points must be changed to higher values and additionally the steam generators are required to be functional due to primary system pressure.When the steam generators are functional, 23 I P'g gap safety valises and level instrumentation are also required to be functional.
Safety valves cannot be functional during a hydrostatic test due to gagging requirements and level instrumentation cannot be functional since the steam generators are water solid and therefore level readings would be off scale.LTOP set points are changed when the primary system temperature reaches 350 degree F, thus there is the potential of a Technical Specification violation if the primary system is pressurized to 556 psi.Technical Specification 3.1.1.2 limits the tubesheet differential temperature to 100 degree F while the potential for a differential temperature of 290 degree F (350 deg.F-60 deg.F)exists.In order to alleviate these problems, the Steam Generator and downstream piping, to the class boundary, will be pressurized to 1194 psi (1.I x 1085 psi)instead of 1356 psi (1.25 x 1085 psi).This action will minimize the potential for tubesheet problems while fulfilling the intent of a hydrostatic test to insure the integrity of the pressure boundary.In addition to the above test, system pressure tests will be performed each period at system operating pressure and temperature to assure system integrity.
The steam generator and associated systems are also subjected to volumetric and surface (Section XI)examinations.
The Feedwater and Hain Steam piping is also included in an augmented inservice inspection program to provide additional assurances of the system integrity." Evaluation:
The system's design does not permit pressurizing the secondary side of the Steam Generator and associated Hain Steam piping to the Code-required test pressure without the potential of cladding failure due to reverse loading.Therefore, the Code-required hydrostatic test is impractical to perform.Pressurizing the components to the alternative test pressures will provide reasonable assurance of the continued inservice structural integrity.


==
e 1
Conclusions:==
I


Based on the above, it is concluded that the Code-required hydrostatic test of the secondary side of the Steam Generator and associated Hain Steam piping is 24 impractical.
The  Diesel Fuel Oil Transfer system would require flange connection disassembly and the installation of blind flanges to isolate the Diesel Oil Storage Tank, which is vented to atmosphere, and the Day Tank where no means is provided to isolate the transfer pump discharge piping at a point close to the day tank. Additionally, the overflow piping from the day tank to the storage tank, which is identified as Class 3, has no isolation valves installed and is vented to the atmosphere.
Therefore, it is recommended that relief be granted as requested.
Oue  to vents to the atmosphere, the Jacket Cooling Water System would require isolating the Cooling Water Expansion Tank, including most of the piping subject to pressure testing. Due to the amount of piping within the Class boundary which is unable to be pressurized, testing in accordance with Section XI requirements would not prove system integrity over and above the existing surveillance Inservice and Functional Testing.
3.4.2.4 Re uest for Relief No.'13 S stem H drostatic Test of Non-ISI Classified S stems Code Re uirement: Section XI, Paragraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1.10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F.The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested.For systems (or portions of systems)not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the non-ISI classified systems, which do not carry radioactive gases or fluids, that contain lines penetrating primary containment.
Evaluation:   The  system's design does not permit pressurizing all of these Class 3 lines to the Code-required test pressure.
Relief is requested'for the following lines: Penetration 120 121 121 124 124 132 202 202 203 Descri tion Nitrogen Fill to Safety Injection Accumulators; I-SI-903 Nitrogen Supply to Pressurizer Relief Tank;3/4-RC-151 Reactor Nakeup Water to Pressurizer Relief Tank;2-RC-151 Post Accident Test Point Containment Atmosphere Post Accident Test Point Containment Recirculating Filter and Cooling Unit C Discharge Containment Depressurization and Mini-Purge Exhaust Hydrogen Supply to Recombiner 8 Hain Burner Hydrogen Supply to Recombiner 8 Pilot Burner Post Accident Test Point Containment Atmosphere 25 (continued)
Therefore, the Code-required hydrostatic test pressure for the unisolatable portions of this piping is impractical to attain.
Penetration 203 210 301 303 304 304 305 305 305 305 305 307 309 310 310 313 317 324 332 332 332 Descri tion Post Accident Test Point Containment Recirculation Filter and Cooling Unit'D Discharge Recombiner Oxygen Makeup to Containment Heating Steam Supply to Containment; 2-HS-150-4 Heating Steam Condensate Return from Containment Hydrogen Supply to Recombiner A Main Burner Hydrogen Supply to Recombiner A Pilot Burner Post Accident Test Point Containment Atmosphere Post Accident Test Point Containment Recirculating Filter and Cooling Unit A Discharge Post Accident Test Point Containment Recirculating Filter and Cooling Unit B Discharge Containment Air Sample Inlet Containment Air Sample Outlet Fire Service Water Containment Mini-Purge Supply Instrument Air Supply to Containment; 2-IA-125-8 Service Air Supply to Containment Containment Leakrate Test Connection Depressurization Containment Leakrate Test Connection Supply;6-AT-150-4 Demineralized Water Hydrogen Monitor A Inlet Hydrogen Monitor 8 Inlet Hydrogen Monitor Outlet Licensee's Pro osed Alternative Examination:
The proposed alternative testing will provide reasonable assurance of the continued inservice structural integrity.
The Licensee proposes to test these lines in accordance with 10 CFR 50 Appendix J,"Reactor Cont'ainment Leakage Testing for Water Cooled Power Reactor," commensurate with the safety function the line performs in accordance with Technical Specification, Surveillance requirements.
Additionally, at least once each period, exposed portions of the lines penetrating primary containment will be examined during normal system operation, Licensee's Basis for Re uestin Relief: The Licensee states that the safety function of these lines is to become part of the containment isolation system during periods when containment isolation is required.Therefore, the pressure testing requirements should be based on the containment system design not the associated process system design requirements.
26 l I I Al)>>
The Licensee's January 16, 1990 submittal states the following: "Due to the vintage of the R.E.Ginna Plant, the piping within these penetration boundaries was not constructed to Class 2 requirements, Regulatory Guide 1.26 does not require these penetrations to be classified as (juality Group B or Class 2.However, Rochester Gas and Electric has optionally classified these lines Class 2.For optionally classified piping, IWA-1320(e) allows the Owner the option to apply the Section XI rules.In the case of these lines, Rochester Gas&Electric has concluded that Appendix J testing and a VT-2 examination once per period during normal system operation will provide testing commensurate with the safety function.In addition, these lines are now subject to ASHE Section XI rules for Repairs and Replacements." Evaluation:
Although these lines were not constructed to Class 2 requirements, the Licensee has not shown that the system's safety criteria permit these lines to be nonnuclear safety class.Therefore, paragraph IWA-1320(e) may not be applicable.
In addition, Appendix J addresses the structural integrity of the primary containment, not the structural integrity of the Code Class 2 process piping for which relief is being requested.
The request for relief does not contain information about the pressures involved.The proposed Appendix J test pressure may be much lower than the Code-required test pressure, in which case the inservice structural integrity would not be identified.
Also, the proposed Appendix J test does not identify the location of a leak if present.I


== Conclusions:==
== Conclusions:==
Based on the above,    it is concluded that the Code-required hydrostatic test is impractical. Therefore,    it is recommended that relief be granted as requested.
i 3.4.3.5 Re  uest for Relief No. 14 S stem H drostatic Test of All Pressure Retainin Com onents Within the Class 3 Portion of the Service Water S stem Code Re  uirement:  Section XI, Paragraph IWD-5223(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature 32
of 200'F or less,  and  at least 1.25 times the system pressure for systems with  Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.
Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of all pressure retaining components within the Class 3 portion of the Service Water System.
Licensee's Pro osed Alternative Examination: The Licensee states that pressure retaining components within the operational boundary will receive an inservice test at operating pressure and an associated VT-2 visual examination each period during the interval.
Licensee's Basis for Re uestin Relief: The Licensee states that the hydrostatic test requirement for the Service Water system is impractical due to system design which dictates the use of an open-ended test. The portion of the system downstream of the heat exchanger is also open-ended and cannot be hydrostatically tested. The remaining section of the system is only isolatable by means of butterfly valves which were not designed to provide a leak tight boundary. With the system as such,  it would be impractical to expect that the leakages, other than at the valves, could be detected.
The ample margin  in cooling capacity inherently provided  by system design does not dictate the need for an essentially leak tight boundary. Since the system is in constant operation, its integrity, is continually monitored. Thorough inspection of the system each period at the full operating pressure is adequate 33
C
\
<P l4


Based on the above evaluation, it is concluded that the Licensee has not justified the determination of impracticality.
to detect any gross failures in the system without degrading system safety or availability.
Therefore, it is recommended that relief be denied.27 0 I l t'~I~)
Evaluation: The Code-required hydrostatic pressure test of isolated portions of Class 3 piping associated with the Service Water System is impractical to perform because the butterfly valves of this system are unable to sustain the pressure required for the hydrostatic test. With regard to the open-ended portions of these lines, paragraph IWD-5223(d) of Section XI should apply. Paragraph IWD-5223(d) states that, for open-ended portions of discharge lines beyond the last shutoff valve in nonclosed systems (e.g., service water systems), confirmation of adequate flow during system operation shall be acceptable in lieu of system hydrostatic test. The.
e 3.4.3 Class 3 S stem Pressure Tests 3.4.3.1 Re uest for Relief No.6.S stem H drostatic Test of the Radioactive Waste Holdu Tank NOTE: Request for Relief No.6 was withdrawn by the Licensee in the January 16, 1990 submittal, which states the following: "This request is specific to the Code hydrostatic test requirements concerning the waste hold-up tank.Liquid waste from various locations in the plant including the reactor coolant drain tank, chemical drain tank, intermediate and auxiliary building sumps, floor, laundry and shower drains are diverted to the waste hold-up tank.During cold shut down and refueling outages, the level in this tank varies depending on the activities performed during an outage.If required to perform the Code examination when the tank is full, there is a possibility of a hazardous situation occurring.
inservice test and the confirmation of adequate flow during system operation will provide reasonable assurance of the continued inservice structural integrity.
Liquid waste could be diverted to the waste hold-up tank while performing the required Code static head examination.
This action could result in a liquid radioactive waste spill at one of various locations.
It was the intent of this relief request to prevent a hazardous event from occurring.
Upon review of your inquiry, we have concluded that it is possible to perform the required examination on this component.
It will require greater coordination with Operations and plant outage activities than is normally expected, but it can be performed.
Therefore, Relief Request Number 6 is no longer required." 3.4.3.2 Re vest for Relief No.10 S stem H drostatic Test of the Standb Auxiliar Feedwater Pum Recirculation Line Code Re uirement: Section XI, Paragraph IWD-5223(a) requires that the system hydrostatic test pressure be at least 1.10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F.The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested.For systems 28 (or portions of systems)not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic, test of the Standby Auxiliary Feedwater Pump recirculation line between valves AOV 9710A and AOV 97108 and their associated downstream flow orifices.Licensee's Pro osed Alternative Examination:
The Licensee states that the Class 3 portion of this piping shall be VT-2 examined at operational discharge pressure once each period during functional testing.Licensee's Basis for Re uestin Relief: The Licensee states that, in order to hydrostatically test this piping to Section XI requirements, the pressure reducing flow orifices downstream of valve AOV 9710A and B would require removal and blank flanges installed.
System piping does not provide an isolation valve between the orifices and the Condensate Supply Tank.A significant reduction in tank level would be required to facilitate orifice removal, which is considered to be impractical.
Evaluation:
The Licensee has not provided adequate information to justify the determination of impracticality.
Information that should be addressed includes (a)why the Licensee considers it impractical to lower the Condensate Supply Tank level and (b)whether or not the use of freeze plugs has been considered and, if so, why it would be impractical to use them.Conclusions:
Based on the above, it is concluded that the Licensee has not demonstrated that the Code-required hydrostatic test is impractical.
Therefore, it is recommended that relief be denied.29 3.4.3.3 Re uest for Relief No.11 S stem H drostatic Test of the Boric Acid Filter and Associated Pi in in the Chemical and Volume Control S stem NOTE: Request for Relief No.11 was withdrawn by the Licensee in the January 16, 1990 submittal, which states the following: "The flange gasket was'reviewed with new technical information that eliminated concerns over the safe working pressure of the Boric Acid Filter housing flange gasket.Upon review of your inquiry, it has been concluded that the Hydrostatic test is possible and will be incorporated into the plan.Therefore, Relief Request Number 11 is no longer required." 3.4.3.4 Re uest for Relief No.12 S stem H drostatic Test of Portions of the Emer enc Diesel Generation S stem Code Re uirement: Section XI, Paragraph IWD-5223(a) requires that the system hydrostatic test pressure be at least 1.10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F.The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested.For systems (or portions of systems)not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.Licen'see's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the following portions of the Emergency Diesel Generation System: (a)Starting Air, including receiver tanks and associated piping, 30 0\(Wl (b)Fuel Oil Transfer pumps, suction and discharge lines, including miscellaneous lines terminating at oil storage tanks, and (c)Jacket Cooling Water system, including miscellaneous lines terminating at the cooling water expansion tanks.Licensee's Pro osed Alternative Examination:
The Licensee states that inservice testing shall be performed on the Air Start System at least once each period in accordance with the requirements of Section XI.Additionally, once each quarter, a pressure decay test shall be performed on the air receiver to verify check valve operability in the reverse direction for the air receiver inlet check.System functional testing shall be performed at least once each period on the Diesel Fuel Oil Transfer and Jacket Cooling Water Systems in accordance with the requirements of Section XI.In addition to the testing discussed above, Technical Specification 6.4.1 requires surveillance testing to be performed on a monthly basis, such as verifying operability of the fuel oil transfer pumps and that the diesel starts from normal standby conditions.
Licensee's Basis for Re uestin Relief: The Licensee states that only portions of the piping associated with the components identified above are capable of being pressure tested.The Air Start System pressure test would require termination prior to reaching the e6gine skid to preclude administrating air to the Air Start Motors.This would leave that portion of piping between the Air Start Motors to the first isolation, prior to reaching the engine skid, untestable.
31 e 1 I The Diesel Fuel Oil Transfer system would require flange connection disassembly and the installation of blind flanges to isolate the Diesel Oil Storage Tank, which is vented to atmosphere, and the Day Tank where no means is provided to isolate the transfer pump discharge piping at a point close to the day tank.Additionally, the overflow piping from the day tank to the storage tank, which is identified as Class 3, has no isolation valves installed and is vented to the atmosphere.
Oue to vents to the atmosphere, the Jacket Cooling Water System would require isolating the Cooling Water Expansion Tank, including most of the piping subject to pressure testing.Due to the amount of piping within the Class boundary which is unable to be pressurized, testing in accordance with Section XI requirements would not prove system integrity over and above the existing surveillance Inservice and Functional Testing.Evaluation:
The system's design does not permit pressurizing all of these Class 3 lines to the Code-required test pressure.Therefore, the Code-required hydrostatic test pressure for the unisolatable portions of this piping is impractical to attain.The proposed alternative testing will provide reasonable assurance of the continued inservice structural integrity.


==
== Conclusions:==
Conclusions:==
Based on  the above,  it  is concluded that the required hydrostatic test of these portions of piping is impractical to perform. Therefore,        it is recommended that relief be granted as requested.
3.4.4  General    (No relief  requests) 3.5  General 3.5. 1 Ultrasonic Examination Techni      ues  (No  relief  requests) 3.5.2  Exem  ted  Com onents    (No relief  requests) 34


Based on the above, it is concluded that the Code-required hydrostatic test is impractical.
I
Therefore, it is recommended that relief be granted as requested.
~  ~
i 3.4.3.5 Re uest for Relief No.14 S stem H drostatic Test of All Pressure Retainin Com onents Within the Class 3 Portion of the Service Water S stem Code Re uirement: Section XI, Paragraph IWD-5223(a) requires that the system hydrostatic test pressure be at least 1.10 times the system pressure for systems with Design Temperature 32 of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F.The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested.For systems (or portions of systems)not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of all pressure retaining components within the Class 3 portion of the Service Water System.Licensee's Pro osed Alternative Examination:
3.5.3  Other 3.5.3.1  Re uest for Relief No. 3 Use of an Authorized Ins ection A  enc to Provide Ins ection Services
The Licensee states that pressure retaining components within the operational boundary will receive an inservice test at operating pressure and an associated VT-2 visual examination each period during the interval.Licensee's Basis for Re uestin Relief: The Licensee states that the hydrostatic test requirement for the Service Water system is impractical due to system design which dictates the use of an open-ended test.The portion of the system downstream of the heat exchanger is also open-ended and cannot be hydrostatically tested.The remaining section of the system is only isolatable by means of butterfly valves which were not designed to provide a leak tight boundary.With the system as such, it would be impractical to expect that the leakages, other than at the valves, could be detected.The ample margin in cooling capacity inherently provided by system design does not dictate the need for an essentially leak tight boundary.Since the system is in constant operation, its integrity, is continually monitored.
                                                          'ode Re uirement: Section XI, Paragraph IWA-1400(f) requires an arrangement with an Authorized Inspection Agency to provide inspection services. In addition, the Code requires that certain administrative functions be performed by the "Enforcement Authority" and "Authorized Nuclear Inservice Inspector."
Thorough inspection of the system each period at the full operating pressure is adequate 33 C\<P l4 to detect any gross failures in the system without degrading system safety or availability.
Licensee's Code Relief Re vest: Relief is requested from using an "Authorized Inspection Agency" for ISI.
Evaluation:
Licensee's Pro osed Alternative Examination: Records and reports of the inservice inspection will be developed and maintained by Rochester Gas and Electric and include such items as examination plans and schedules, examination results, and corrective actions.
The Code-required hydrostatic pressure test of isolated portions of Class 3 piping associated with the Service Water System is impractical to perform because the butterfly valves of this system are unable to sustain the pressure required for the hydrostatic test.With regard to the open-ended portions of these lines, paragraph IWD-5223(d) of Section XI should apply.Paragraph IWD-5223(d) states that, for open-ended portions of discharge lines beyond the last shutoff valve in nonclosed systems (e.g., service water systems), confirmation of adequate flow during system operation shall be acceptable in lieu of system hydrostatic test.The.inservice test and the confirmation of adequate flow during system operation will provide reasonable assurance of the continued inservice structural integrity.
The functions of the authorized nuclear inservice inspector, namely their review and verification of inservice examinations, personnel qualification, and equipment certification during the annual outages at Ginna Nuclear Power Station will be performed by personnel of the Hartford Steam Boiler Inspection and Insurance Company. The qualifications of the inspectors, inspections specialists, and inspection agency are in compliance with the Code.
Licensee's Basis for Re uestin Relief: Ginna Nuclear Power Station is located in the State of New York. The Licensee states that this state has not endorsed ASHE Codes and, therefore, does not provide administrative organization and controls such as "Enforcement Authority," "Authorized Nuclear 35


==
r I 4
Conclusions:==
"J


Based on the above, it is concluded that the required hydrostatic test of these portions of piping is impractical to perform.Therefore, it is recommended that relief be granted as requested.
          ~                                   ~
3.4.4 General (No relief requests)3.5 General 3.5.1 Ultrasonic Examination Techni ues (No relief requests)3.5.2 Exem ted Com onents (No relief requests)34 I~~3.5.3 Other 3.5.3.1 Re uest for Relief No.3 Use of an Authorized Ins ection A enc to Provide Ins ection Services'ode Re uirement: Section XI, Paragraph IWA-1400(f) requires an arrangement with an Authorized Inspection Agency to provide inspection services.In addition, the Code requires that certain administrative functions be performed by the"Enforcement Authority" and"Authorized Nuclear Inservice Inspector." Licensee's Code Relief Re vest: Relief is requested from using an"Authorized Inspection Agency" for ISI.Licensee's Pro osed Alternative Examination:
Inservice Inspector,"   and "Reporting Systems." However, Ginna Station's guality Assurance Program does provide equivalent administrative control. Therefore, the Licensee requests that Ginna's Station guality Assurance Program be used in lieu of Code administrative functions.
Records and reports of the inservice inspection will be developed and maintained by Rochester Gas and Electric and include such items as examination plans and schedules, examination results, and corrective actions.The functions of the authorized nuclear inservice inspector, namely their review and verification of inservice examinations, personnel qualification, and equipment certification during the annual outages at Ginna Nuclear Power Station will be performed by personnel of the Hartford Steam Boiler Inspection and Insurance Company.The qualifications of the inspectors, inspections specialists, and inspection agency are in compliance with the Code.Licensee's Basis for Re uestin Relief: Ginna Nuclear Power Station is located in the State of New York.The Licensee states that this state has not endorsed ASHE Codes and, therefore, does not provide administrative organization and controls such as"Enforcement Authority,""Authorized Nuclear 35 r I 4"J
Rochester   Gas and Electric's   program for the inservice inspection, governed by the R'. E. Ginna Nuclear Power Station guality Assurance Manual, contains the requirements and responsibilities for implementation of the program and procedures. The procedures have been prepared and approved by the responsible organizations within Rochester Gas and Electric (e.g., Ginna Station, Engineering, Materials Engineering and inspection Services, Electric Heter and Laboratory and Purchasing).
~~Inservice Inspector," and"Reporting Systems." However, Ginna Station's guality Assurance Program does provide equivalent administrative control.Therefore, the Licensee requests that Ginna's Station guality Assurance Program be used in lieu of Code administrative functions.
Approved procedures   will   be implemented to control the standards   for examination evaluation. These procedures include identifications of the organization performing the inspection, description of the method of inspection to be used, acceptance and rejection criteria, and requirements for providing evidence of completion and certification of the inspection activity.
Rochester Gas and Electric's program for the inservice inspection, governed by the R'.E.Ginna Nuclear Power Station guality Assurance Manual, contains the requirements and responsibilities for implementation of the program and procedures.
In addition, procedures are developed by Ginna Nuclear Power Station to prescribe the disposition of nonconformances. The procedures implemented for the repairs, the retest procedures, and the test results will be reviewed by the Plant Operating Review Committee. Members of this committee include technically qualified staff personnel.
The procedures have been prepared and approved by the responsible organizations within Rochester Gas and Electric (e.g., Ginna Station, Engineering, Materials Engineering and inspection Services, Electric Heter and Laboratory and Purchasing).
Approved procedures will be implemented to control the standards for examination evaluation.
These procedures include identifications of the organization performing the inspection, description of the method of inspection to be used, acceptance and rejection criteria, and requirements for providing evidence of completion and certification of the inspection activity.In addition, procedures are developed by Ginna Nuclear Power Station to prescribe the disposition of nonconformances.
The procedures implemented for the repairs, the retest procedures, and the test results will be reviewed by the Plant Operating Review Committee.
Members of this committee include technically qualified staff personnel.
Examination techniques have been established in accordance with written requirements and incorporated into written procedures.
Examination techniques have been established in accordance with written requirements and incorporated into written procedures.
gualifications for nondestructive test personnel are in compliance with Regulatory Guide 1.58,"gualification of Nuclear Power Plant Inspection, Examination and Testing Personnel." 36 C.I 4 Evaluation:
gualifications for nondestructive test personnel are in compliance with Regulatory Guide 1.58, "gualification of Nuclear Power Plant Inspection, Examination and Testing Personnel."
Although the State of New York does not endorse the ASHE Code, and, therefore, does not provide administrative organization and controls such as"Enforcement Authority," Authorized Nuclear Inservice Inspector," and"Reporting Systems," equivalent administrative control is provided by the Ginna Nuclear Power Station guality Assurance Program.Personnel of the Hartford Steam Boiler Inspection and Insurance Company will perform the functions of the Authorized Nuclear Inservice Inspector during the annual outages at Ginna Nuclear Power Station.The Hartford Steam Boiler Inspection and Insurance Company has been designated the Authorized Nuclear Inservice Inspector by other states for other nuclear reactors.Therefore, the intent of the Code will be met by using the Ginna Nuclear Power Station guality Assurance Program in lieu of the Code administrative functions.
36
 
C .I 4
 
Evaluation:     Although the State of   New York does not endorse the ASHE Code, and, therefore, does not provide administrative organization and controls such as "Enforcement Authority,"
Authorized Nuclear Inservice Inspector," and "Reporting Systems," equivalent administrative control is provided by the Ginna Nuclear Power Station guality Assurance Program.
Personnel of the Hartford Steam Boiler Inspection and Insurance Company will perform the functions of the Authorized Nuclear Inservice Inspector during the annual outages at Ginna Nuclear Power Station. The Hartford Steam Boiler Inspection and Insurance Company has been   designated   the Authorized Nuclear Inservice Inspector by other states for other nuclear reactors. Therefore, the intent of the Code will be met by using the Ginna Nuclear Power Station guality Assurance Program in lieu of the Code administrative functions.


==
==
Conclusions:==
Conclusions:==
Based on the above,      it is concluded that the intent of the Code will be met. Therefore,        it  is recommended that relief be granted as requested.
37
e
        -~
a
    ~  4 4~'
tt
~ l ~
        ~
P
: 4. CONCLUSION Pursuant to 10 CFR 50.55a(g)(6),      it  has been determined that certain Section XI required inservice examinations are impractical to perform. In all cases for which relief is requested, except Request for Relief No. 13, the Licensee has demonstrated that specific Section XI requirements are impractical. For Request for Relief Nos. 10 and 13,          it is concluded that:
(a) the Licensee has not provided information to support the determination that the Code requirement is impractical and (b) requiring the Licensee to comply with the Code requirement would not result in hardship.          Request for Relief Nos. 6, 11, 15, and 16 were withdrawn by the Licensee and deleted from the ISI Program Plan.
This technical evaluation has not identified any practical method by which the Licensee can meet all the specific inservice inspection requirements of Section XI of the ASHE Code for the existing R. E. Ginna Nuclear Power Station facility. Requiring compliance with all the exact Section XI required inspections would require redesign of a significant number of plant systems, sufficient replacement components to be obtained, installation of the new components, and a baseline examination of these components.          Even after the redesign ef,orts, complete compliance with the Section XI examination requirements probably could not be achieved. Pursuant to 10 CFR 50.55a(g)(6), relief is allowed from these requirements which are impractical to implement    if granting the relief will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result  if  the requirements were imposed on the facility. Therefore,        it is concluded that the public interest is not served by imposing certain provisions of Section XI of the ASME Code that have been determined to be impractical.
I The development    of  new or improved examination techniques should continue to be monitored. As improvements in these areas are achieved, the Licensee should incorporate these techniques in the ISI program plan examination requirements.
38
                        ~                                ~
" 5ased on review of the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan, the Licensee's response to the NRC request for additional information, and the recommendations  for granting relief from the ISI examination requirements that have been determined to be impractical, it is concluded that the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan, with the exception of Request for Relief Nos. 10 and 13, is acceptable and in compliance with 10 CFR 50.55a(g)(4).
39
4  y
  ~~i
: 5. REFERENCES
: 1. Code  of Federal Regulations,    Volume 10, Part 50.
: 2. American Society    of Mechanical Engineers Boiler    and Pressure  Vessel Code,  Section XI, Division 1, 1986 Edition.
: 3. R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan, dated July 21, 1989.
: 4. NUREG-0800,  Standard Review Plans, Section 5.2.4, "Reactor Coolant Boundary  Inservice Inspection and Testing," and Section 6.6, "Inservice Inspection of Class 2 and 3 Components," July 1981.
: 5. Letter, dated  November 16, 1989, A. R. Johnson (NRC) to R. C. Mecredy
[Rochester Gas and Electric Corporation (RGE)], request for additional information.
: 6. Letter, dated January 16, 1990, R. C. Mecredy (RGE) to A. R. Johnson (NRC), response to the NRC request for additional information.
: 7. NRC  Regulatory Guide 1. 14, "Reactor Coolant    Pump  Flywheel  Integrity,"
Revision 1, August 1975.
: 8. NRC  Regulatory Guide 1. 150, "Ultrasonic Testing of Reactor Vessel Welds During Preservice and Inservice Examinations," Revision 1, February 1983.
40
4 4 e~l4 4 N
NPQ cCAAI 33S                                                                          U.S. NUCLEAR REGULATORY C                      SION        P  P  RT
  '39                                                                                                                                                        oy IIIIC. Add vot., Evoo., Rty.,
NI"'Aanincd r~CLI  ~ 192,                                                                                                                                    old Adocntgtm ttvtntttti. II tny,I Cr '0 I'~iQ'~                          BIBL!OGRAPHIC DATA SHEET Lc,,g lSco tntttvctytng on tnp ioycrgol
: 2. TITI.E AND SUBTIT'                                                                                                                              EGG-HS-8923 Technical Evaluation Report                            on      the Third 10-Year Interval Inservice Inspection Program Plan:                                                                                            3.        DATE REPORT PUBLISHED Rochester Gas and Electric Corporation, R. E. Ginna Nuclear Power Station,                                                                                                        April                    I    1995 Docket Number 50-244                                                                                                                  tL FIN OR GRANT NUMBER FIN-D6022                  (Proj.      5)
: 5. AUTHORISI                                                                                                                                  6. TYPE OF REPORT Technical B.W. Brown,            J.D. Hudlin                                                                                                    7. PERIOD COVERED ttnctonrr Octal 6, PERFORMING ORGANIZATION              NAME AND ADDRESS lllhlnC ptoyior Oiytoon. Ottcrorltrpion, ItS. itoctcgr gtrpvtctory Convnntt'oncndmgttinpcootcth'itcontrgctor protntc notto nnct motlinp oddtyccl EGLG        Idaho, Inc P. 0. Box 1625 Idaho        Falls,    ID    83415-2209
: 9. SPONSORING ORGANIZATION nntt mctl np ottdtctcl NAME ANO ADDRESS          ttt gtnC,  typo  ~      cg photo liTcontrcctor gnoygcto tgnC Ditnron, Ortho or gtcp>>n. IlS. hhrcgtcr ntptttgtory Commtction.
Haterials and Chemical Engineering Branch Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
: 10. SUPPLEMENTARY NOTES
: 11. ABSTRACT QEO ytorot or ital This report presents the results of the evaluation of the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection (ISI) Program Plan, submitted July 21, 1989, including the requests for relief from the American Society of Hechanical Engineers (ASHE) Boiler and Pressure Vessel Code Section XI requirements which the Licensee has determined to be impractical; The R: E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan is evaluated in Section 2 of this report. The ISI Program Plan is evaluated for (a) compliance with the appropriate edition/addenda of Section XI, (b) acceptability of examination sample, (c) correctness of the application of system or- component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC) reviews. The requests for relief are evaluated in Section 3 of this report.
: 12. KEY WORDS/OESCRIPTORS          ILia wordy or pnrgtct tna wiu catt t rttrgrcntrt in iocgnnp tnc noon,l                                                  13.        AVAILASILITYSTAT EMEtIT Unlimited
: 14. $ ECUIIITYCLASSIFICATION I Thlt petti Unclassified IThn ntportt Unclassified
                                                                                                                                                            'I
: 5. N Uhl 6 E R    0F PA G 6 S
: 16. PRICE FIR C  FORM 335 I249I


Based on the above, it is concluded that the intent of the Code will be met.Therefore, it is recommended that relief be granted as requested.
s~~
37 e-~a~4 4~'
    'V}}
tt~P~l~4.CONCLUSION Pursuant to 10 CFR 50.55a(g)(6), it has been determined that certain Section XI required inservice examinations are impractical to perform.In all cases for which relief is requested, except Request for Relief No.13, the Licensee has demonstrated that specific Section XI requirements are impractical.
For Request for Relief Nos.10 and 13, it is concluded that: (a)the Licensee has not provided information to support the determination that the Code requirement is impractical and (b)requiring the Licensee to comply with the Code requirement would not result in hardship.Request for Relief Nos.6, 11, 15, and 16 were withdrawn by the Licensee and deleted from the ISI Program Plan.This technical evaluation has not identified any practical method by which the Licensee can meet all the specific inservice inspection requirements of Section XI of the ASHE Code for the existing R.E.Ginna Nuclear Power Station facility.Requiring compliance with all the exact Section XI required inspections would require redesign of a significant number of plant systems, sufficient replacement components to be obtained, installation of the new components, and a baseline examination of these components.
Even after the redesign ef,orts, complete compliance with the Section XI examination requirements probably could not be achieved.Pursuant to 10 CFR 50.55a(g)(6), relief is allowed from these requirements which are impractical to implement if granting the relief will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.Therefore, it is concluded that the public interest is not served by imposing certain provisions of Section XI of the ASME Code that have been determined to be impractical.
I The development of new or improved examination techniques should continue to be monitored.
As improvements in these areas are achieved, the Licensee should incorporate these techniques in the ISI program plan examination requirements.
38
~~" 5ased on review of the R.E.Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan, the Licensee's response to the NRC request for additional information, and the recommendations for granting relief from the ISI examination requirements that have been determined to be impractical, it is concluded that the R.E.Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan, with the exception of Request for Relief Nos.10 and 13, is acceptable and in compliance with 10 CFR 50.55a(g)(4).
39 4 y~~i 5.REFERENCES 1.Code of Federal Regulations, Volume 10, Part 50.2.American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Division 1, 1986 Edition.3.R.E.Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan, dated July 21, 1989.4.NUREG-0800, Standard Review Plans, Section 5.2.4,"Reactor Coolant Boundary Inservice Inspection and Testing," and Section 6.6,"Inservice Inspection of Class 2 and 3 Components," July 1981.5.Letter, dated November 16, 1989, A.R.Johnson (NRC)to R.C.Mecredy[Rochester Gas and Electric Corporation (RGE)], request for additional information.
6.Letter, dated January 16, 1990, R.C.Mecredy (RGE)to A.R.Johnson (NRC), response to the NRC request for additional information.
7.NRC Regulatory Guide 1.14,"Reactor Coolant Pump Flywheel Integrity," Revision 1, August 1975.8.NRC Regulatory Guide 1.150,"Ultrasonic Testing of Reactor Vessel Welds During Preservice and Inservice Examinations," Revision 1, February 1983.40 4 4 e~l4 4 N NPQ cCAAI 33S'39 r~CLI~192, Cr'0 I'~iQ'~Lc,,g 2.TITI.E AND SUBTIT'U.S.NUCLEAR REGULATORY C SION BIBL!OGRAPHIC DATA SHEET lSco tntttvctytng on tnp ioycrgol P P RT NI"'Aanincd oy IIIIC.Add vot., Evoo., Rty., old Adocntgtm ttvtntttti.
II tny,I EGG-HS-8923 Technical Evaluation Report on the Third 10-Year Interval Inservice Inspection Program Plan: Rochester Gas and Electric Corporation, R.E.Ginna Nuclear Power Station, Docket Number 50-244 5.AUTHORISI B.W.Brown, J.D.Hudlin 3.DATE REPORT PUBLISHED April I 1995 tL FIN OR GRANT NUMBER FIN-D6022 (Proj.5)6.TYPE OF REPORT Technical 7.PERIOD COVERED ttnctonrr Octal 6, PERFORMING ORGANIZATION NAME AND ADDRESS lllhlnC ptoyior Oiytoon.Ottcrorltrpion, ItS.itoctcgr gtrpvtctory Convnntt'oncndmgttinpcootcth'itcontrgctor protntc notto nnct motlinp oddtyccl EGLG Idaho, Inc P.0.Box 1625 Idaho Falls, ID 83415-2209 9.SPONSORING ORGANIZATION NAME ANO ADDRESS ttt gtnC, typo~cg photo liT contrcctor gnoygcto tgnC Ditnron, Ortho or gtcp>>n.Il S.hhrcgtcr ntptttgtory Commtction.
nntt mctl np ottdtctcl Haterials and Chemical Engineering Branch Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 10.SUPPLEMENTARY NOTES 11.ABSTRACT QEO ytorot or ital This report presents the results of the evaluation of the R.E.Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection (ISI)Program Plan, submitted July 21, 1989, including the requests for relief from the American Society of Hechanical Engineers (ASHE)Boiler and Pressure Vessel Code Section XI requirements which the Licensee has determined to be impractical; The R: E.Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan is evaluated in Section 2 of this report.The ISI Program Plan is evaluated for (a)compliance with the appropriate edition/addenda of Section XI, (b)acceptability of examination sample, (c)correctness of the application of system or-component examination exclusion criteria, and (d)compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC)reviews.The requests for relief are evaluated in Section 3 of this report.12.KEY WORDS/OESCRIPTORS ILia wordy or pnrgtct tna wiu catt t rttrgrcntrt in iocgnnp tnc noon,l 13.AVAILASILITY STAT EMEtIT Unlimited 14.$ECUIIITY CLASSIFICATION I Thlt petti Unclassified IThn ntportt Unclassified
'I 5.N Uhl 6 E R 0 F PA G 6 S 16.PRICE FIR C FORM 335 I249I s~~'V}}

Latest revision as of 17:48, 29 October 2019

Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Re Ginna Nuclear Power Station.
ML17261B124
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1990
From: Beth Brown, Mudlin J
EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
To:
NRC
Shared Package
ML17261B121 List:
References
CON-FIN-D-6022 EGG-MS-8923, NUDOCS 9008080272
Download: ML17261B124 (73)


Text

Attachment 2 EGG-MS-8923 TECHNICAL EVALUATION REPORT ON THE THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN:

ROCHESTER GAS AND ELECTRIC CORPORATION, R. E. GINNA NUCLEAR POWER STATION, DOCKET NUMBER 50-244 B. W. Brown J. D. Mudlin Published April 1990 Idaho National Engineering Laboratory EG&G Ida'ho, Inc.

Idaho Falls, Idaho 83415 Prepared for:

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 under DOE Contract No. DE-AC07-76ID01570 FIN No. D6022 (Project 5) 9008080272 900806 PDR ADOCK 05000244 9

PDC

ABSTRACT This report presents the results of the evaluation of the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection (ISI)

Program Plan, submitted July 21, 1989, including the requests for relief from the American Society of Mechanical Engineers (ASHE) Boiler and Pressure Vessel Code Section XI requirements which the Licensee has determined to be impractical. The R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan is evaluated in Section 2 of this report. The ISI Program Plan is evaluated for (a) compliance with the "appropriate edition/addenda of Section XI, (b) acceptability of examination sample, (c) correctness of the application of system or component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC) reviews. The requests for relief are evaluated in Section 3 of this report.

This work was funded under:

U.S. Nuclear Regulatory Commission FIN No. 06022, Project 5 Operating Reactor, Licensing Issues Program, Review of ISI for ASHE Code Class 1, 2, and 3 Components

SUMMARY

The Licensee, Rochester Gas and Electric Corporation, has prepared the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection ( ISI) Program Plan to meet the requirements of the 1986 Edition of the ASME Code Section XI. The third 10-year interval began January 1, 1990 and ends December 31, 1999.

The information in the R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan, submitted July 21, 1989, was reviewed. Included in the review were the requests for relief from the ASME Code Section XI requirements which the Licensee has determined to be impractical. As a result of this review, a request for additional information (RAI) was prepared describing the information and/or clarification required from the Licensee in order to complete the review. The Licensee provided additional information in the submittal dated January 16, 1990.

Based on the review of the R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan, the Licensee's response to the Nuclear Regulatory Commission's RAI, and the recommendations for granting relief from the ISI examination requirements that have been determined to be impractical, it is concluded that the R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan, with the exception oF Request for Relief Nos. 10 and 13, is acceptable and in compliance with 10 CFR 50.55a(g)(4).

111

I

~,

CONTENTS 1 1 ABSTRACT ~ ~ ~ ~

SUMMARY

~ ~ ~ ~ ~ ~ o ill I NTRODUCT I ON ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1

2. EVALUATION OF INSERVICE INSPECTION PROGRAM PLAN ................... 3
2. 1 Documents Evaluated ........................................... 3 2.2 Compliance with Code Requirements .......... 3 2.2.1 Compliance with Applicable Code Editions 3 2.2,2 Acceptability of the Examination Sample ...

2.2.3 Exclusion Criteria . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

2.2.4 Augmented Examination Commitments .......................... 4 2..3 Conclusions ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

3. EVALUATION OF RELIEF REQUESTS ................................... ~ . 5
3. 1 Class 1 Components ............................................. . 5
3. 1. 1 Reactor Pressure Vessel
3. 1. 1. 1 Request for Relief No. 1, Examination Category B-A, Item Bl.30, Deferral of RPV Shell-to-Flange Weld Examinations ..........'............................... ~ . 5
3. 1. 1.2 Request for Relief No. 2, Examination Category B-D, Items B3.90 and B3. 100, Reactor Pressure Vessel Nozzle-to-Vessel Welds and Nozzle Inside Radius S ections ,.............. ~ ~ ~ ~ ~ ~ ~ ~ . 8 3.1.2 Pressurizer (No relief requests) 3.1.3 Heat Exchangers and Steam Generators (No relief 'requests) 3.1.4 P'ping Pressure Boundary ................................... 11
3. 1.4. 1 Request for Relief No. 16 (Part 1 of 2), Examination Category B-K-I, Item B10. 10, Class 1 Piping Integrally Welded Attachments ......'.................... ll
3. 1.5 Pump Pressure Boundary 12 3.1.5.1 Request for Relief No. 4, Examination Category B-L-1 and B-L-2, Items B12. 10 and B12.20, Class 1 Pump Casing Welds and Pump Casings ............. 12
3. 1.6 Valve Pressure Boundary .. 15 3.1.6.1 Request for Relief No. 5, Examination Category B-H-2, Item B12.50, Class 1 Valve Body Internal Surfaces ...................................... 15
3. 1.7 General (No relief requests) 3.2 Class 2 Components ........... 18 3.2.1 Pressure Vessels (No relief requests) 3 .2.2 Piping .... ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 18 3.2.2. 1 Request for Relief No. 15, Examination Category C-F-1 and C-F-2, Items C5.10 and C5.50, Class 2 Piping Welds .. ............. ............... 18 3.2.2.2 Request for Relief No. 16 (Part 2 of 2),

Examination Category C-C, Item C3.20, Class 2 Piping Integrally Welded Attachments . 18 3.2.3 Pumps (No relief requests) 3.2.4 Valves (No relief requests) 3 '.5 General (No relief requests) 3.3 Class 3 Components (No relief requests) 3' Pressure Tests . . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ \ 19 3.4. 1 Class 1 System Pressure Tests (No relief requests) 3.4.2 Class 2 System Pressure Tests .............................. 19 3.4.2.1 Request for Relief No. 7, System Hydrostatic Test of Three Charging Pumps and Discharge Piping to Discharge Isolation Valves in the Chemistry and Volume Control System ...............'. . ............. 19 3.4.2.2 Request for Relief No. 8, System Hydrostatic Test of Reactor Coolant System Overpressure Protection Nitrogen Accumulator System Valves PCV 430 and PCV 431C o' ~ 20

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

3.4.2.3 Request for Relief No. 9, System Hydrostatic Test of the Secondary Side of the Steam Generator and Associated Hain Steam Piping ..... 22 3.4.2.4 Request for Relief No. 13, System Hydrostatic Test of Non-ISI Classified Systems ............ . ...... 25 3.4.3 Class 3 System Pressure Tests . 28 3.4.3. Request for Relief No. 6, System Hydrostatic Test 1

of the Radioactive Waste Holdup Tank ................... 28 3.4.3.2 Request for Relief No. 10, System Hydrostatic Test of the Standby Auxiliary Feedwater Pump Recirculation Line .................... 28 3.4.3.3 Request for Relief No. 11, System Hydrostatic Test of the Boric Acid Filter and Associated Piping in the Chemical and Volume Control System . 30 3.4.3.4 Request for Relief No. 12, System Hydrostatic Test of Portions of the Emergency Diesel Generation S ystem 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ \ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 30 3.4.3.5 Request for Relief No. 14, System Hydrostatic Test of All Pressure Retaining Components Within the Class 3 Portion of the Service Water System ............ 32 3.4.4 General (No relief requests) 3.5 General ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 34 3.5. 1 Ultrasonic Examination Techniques (No relief requests) 3.5.2 Exempted Components (No relief requests) 3 .5.3 Other . ~ ~ ~ ~ ~ I~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 35 for Relief No. 3, Use of an Authorized 3.5.3.1 Request Inspection Agency to Provide Inspection Services ....... '5 4 ~ CONC LUS ION ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 38

5. REFERENCES ...................... ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 40

.r .*

L~+

pip I I"

TECHNICAL EVALUATION REPORT ON THE THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN:

ROCHESTER GAS AND ELECTRIC CORPORATION, R. E. GINNA NUCLEAR POWER STATION, DOCKET NUMBER 50-244

1. INTRODUCTION Throughout the service life of a water-cooled nuclear power facility, 10 CFR 50.55a(g)(4) (Reference 1) requires that components (including supports) that are classified as American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Class 1, Class 2, and Class 3 meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code Section XI, "Rules for Inservice Inspection of Nuclear Power Station Components," (Reference 2) to the extent practical within the limitations of design, geometry, and materials of construction of the components.. This section of the regulations also requires that inservice examinations of components and system pressure tests conducted during successive 120-month inspection intervals shall comply with the requirements in the latest edition and addenda of the Code incorporated by reference in 10 CFR 50.55a(b) on the date 12 months prior to the start of the 120-month inspection interval, subject to the limitations and modifications listed therein. The components (including supports) may meet requirements set forth in subsequent editions and addenda of this Code which are incorporated by reference in 10 CFR 50.55a(b) subject to the limitations and modifications listed therein. The Licensee, Rochester Gas and Electric Corporation, has prepared the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection ( ISI) Program Plan to meet the requirements of the 1986 Edition of the ASME Code Section XI. The third 10-year interval began January 1; 1990 and ends December 31, 1999.

As required by 10 CFR 50.55a(g)(5), if the licensee determines that certain Code examination requirements are impractical and requests relief from them, the licensee shall submit information and justifications to the Nuclear Regulatory Commission (NRC) to support that determination.

'Pursuant to 10 CFR 50.55a(g)(6), the NRC will evaluate the licensee's determinations under 10 CFR 50.55a(g)(5) that Code requirements are impractical. The NRC may grant relief and may impose alternative requirements that are determined to be authorized by law, will not endanger life or property or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the if 6'

licensee that could result the requirements were imposed on the facility.

The information in the R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan (Reference 3), submitted July 21, 1989, was reviewed, including the requests for relief from the ASHE Code Section XI requirements which the Licensee has determined to be impractical. Review of the ISI Program Plan was performed using the Standard Review Plans of NUREG-0800 (Reference 4), Section 5.2.4, "Reactor Coolant Boundary Inservice Inspections and Testing," and Section 6.6, "Inservice Inspection of Class 2 and 3 Components."

In a letter dated November 16, 1989 (Reference 5), the NRC requested additional information required in order to complete the review of the ISI Program Plan. Additional information was provided by the Licensee in a submittal dated January 16, 1990 (Reference 6).

The R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan is evaluated in Section 2 of this report. The ISI Program Plan is evaluated for (a) compliance with the appropriate edition/addenda of Section XI, (b) acceptability of examination sample, (c) correctness of the application of system or component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous NRC reviews.

The requests for relief are evaluated in Section 3 of this report. Unless otherwise stated, references to the Code refer to the ASHE Code,Section XI, 1986 Edition. Specific inservice test (IST) programs for pumps and valves are being evaluated in other reports.

2. EVALUATION OF INSERVICE 0

INSPECTION PROGRAM PLAN This evaluation consisted of a review of the applicable program documents to determine whether or not they are in compliance with the Code requirements and any license conditions pertinent to ISI activities. This section describes the submittals reviewed and the results of the review.

2. 1 Oocuments Evaluated Review has been completed on the following information provided by the Licensee:

(a) R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan; and (b) Letter, dated January 16, 1990, containing the Licensee's response to the NRC request for additional information.

2.2 Compliance with Code Re uirements 2.2.1 Com liance with A licable Code Editions The Inservice Inspection Program Play shall be based on the Code editions defined in 10 CFR 50.55a(g)(4) and 10 CFR 50.55a(b). Based on the starting date of January 1, 1990, for the R. E. Ginna Nuclear Power Station, the Code applicable to the third 10-year interval ISI program plan is the 1986 Edition. As stated in Section 1 of this report, the Licensee has written the R. E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan to meet the requirements of the,1986 Edition of the ASHE Code.

I 2.2.2 Acce tabilit of the Examination Sam le Inservice volumetric, surface, and visual examinations shall be performed on ASHE Code Class 1, 2, and 3 components and their supports using sampling schedules described in Section XI of the ASME Code and

A 0

10 CFR 50.55a(b). Sample size and weld selection have been implemented in accordance with the Code and appear to be correct.

2.2.3 Exclusion Criteria The criteria used to exclude components from examination shall be consistent with Paragraphs IWB-1220, IWC-1220, IWC-1230, IWO-1220', and 10 CFR 50.55a(b). The exclusion criteria have been applied by the Licensee in accordance with the Code as discussed in the ISI Program Plan and appear to be correct.

2.2.4 Au mented Examination Commitments In addition to the requirements specified in Section XI of the ASME Code, the Licensee has committed to perform augmented examinations in accordance with NRC Regulatory Guide 1. 14, "Reactor Coolant Pump Flywheel Integrity,"

Revision 1, (Reference 7) and NRC Regulatory Gu'ide 1. 150, "Ultrasonic Testing of Reactor Vessel Welds Ouring Preservice and Inservice Examinations," Revision 1 (Reference 8).

Also, circumferential butt welds in high energy piping outside of containment where a failure would result in unacceptable consequences will receive radiographic or ultrasonic volumetric examinations and magnetic particle surface examinations.

'2.3 Conclusions Based on review of the documents listed above, it is concluded that the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection Program Plan is acceptable and in compliance with 10 CFR 50.55a(g)(4).

3. EVALUATION OF RELIEF REQUESTS Requests for relief from the ASHE Code requirements that the Licensee has determined to be impractical for the third 10-year inspection interval are evaluated in the following sections.
3. 1 Class 1 Com onents 3.1.1 Reactor Pressure Vessel
3. 1. 1. 1 Re uest for Relief No. 1 Examination Cate or B-A Item Bl.30.

Deferral of RPV Shell-to-Flan e Weld Examinations Code Re uirement: Section XI, Table IWB-2500-1, Examination Category B-A, Item 81.30 requires a 100% volumetric examination of the Reactor Pressure Vessel shell-to-flange weld as defined by Figure IWB-2500-4. Note 5 states that, if partial examinations are conducted from the flange face, the remaining volumetric examinations required to be conducted from the vessel wall may be performed at or near the end of each inspection interval. Note 6 states that the examination of shell-to-flange welds may be performed during the first and'hird inspection periods in conjunction with the nozzle examination of Examination Category B-D. At least 50% of shell-to-flange welds shall be examined by the end of the first inspection period and the remainder by the end of the third inspection period.

Licensee's Code Relief Re uest: Relief is requested to defer the volumetric examination of the Reactor Pressure Vessel (RPV) shell-to flange weld to the end of the inspection interval.

Licensee's Pro osed Alternative Examination: The Licensee states that, during the third interval, 100% of the accessible length of all RPV welds, including the shell-to-flange weld, will be performed at or near the end of the interval when all the required examinations can be performed at the same .time.

Licensee's Basis for Re uestin Relief: The Licensee states that the required shell-to-flange examination is impractical if performed during the periods specified as it can be accomplished only from the flange surface.

During the first two inspection intervals, 100% of the accessible length of the RPV welds, including the shell-to-flange weld, was examined at or near the end of the interval when the entire examination could be performed from both the flange surface and the vessel wall. This is a more practical approach in that the required examinations from both surfaces can be performed at the same time.

The Licensee's January 16, 1990 submittal stated that Rochester Gas and Electric received relief for R. E. Ginna for the second interval (1979-1989) allowing deferral of all vessel mechanized examinations including category B-A to the end of the second interval. Full examination of the RPV shell-to-flange weld (Category B-A) was performed from the flange surface and from the vessel shell during the end of interval March-April 1989 refueling outage. The examination was performed in accordance with the 1974 Edition, Summer 1975 Addenda of the ASME Code.

Indications were recorded and analyzed during the series of examinations performed at the 1989 outage. Comparisons of their size to the same indications recorded during the preservice examination and the 1979 end of the first interval inservice examination led to no indications of growth of defects. The indications were sized utilizing,both conventional beam spread techniques and specially developed focused beam sizing techniques. No evidence of growth was detected by utilizing these examination techniques. These examinations were witnessed by the NRC and their consultants during the 1989 outage.

t I f

't)9

~ 0 The results of the 1989 examinations with comparative sizing calculations .and fracture mechanics evaluation were submitted to the NRC on Hay 4, 1989. The data provided were accepted by the NRC on June 5, 1989 with no requirements for augmented examinations. The Licensee has, therefore, scheduled the next series of Category B-A RPV examinations for the 1999 time frame (end of this 10-year interval). Examination Category B-A in Table IWB-2500 Item number B1.30 already allows examination deferral as indicated in footnote 5 of the notes. By following the 1986 Code criteria, the Code would require a vessel-to-flange examination from the flange seal surface during the first period of the third interval. Since all reactor vessel examinations, including the vessel-to-flange weld from the flange surface and wall, were accomplished in 1989, the prescribed B-A, B1.30, Code criteria would allow another 10 years before the reexamination.

Since the examination of the RPV vessel-to-flange weld was accomplished completely in 1989, the Licensee proposes to reexamine the weld at the end of the third interval. The Licensee also believes that the results obtained from an examination performed during the first period of the third interval would not provide the best data to ensure additional safety and system reliability. Also, performing this type of examination at a constant frequency rather than a year or two following a major examination of that same component will produce more meaningful results.

Evaluation: Paragraph IWB-2420(a), "Successive Inspections,"

states that the sequence of component examinations established during the first inspection interval shall be repeated during each successive inspection interval, to the extent practical.

Since the examinations were performed during the third period of the second interval with'NRC approval, the intent of the Code will be met by examining these welds during the third period of the third interval.

l I

t O'I II

Conclusions:

Based on the above, it is concluded that the intent of the Code will be met by the alternative schedule, Therefore, it is recommended that relief be granted as requested.

3. 1. 1.2 Re uest for Relief No. 2 Examination Cate or 8-D Items 83.90 and B3. 100 Reactor Pressure Vessel Nozzle-to-Vessel Welds and Nozzle Inside Radius Sections Code Re uirement: Section XI, Table IWB-2500-1, Examination Category B-D, Item B3.90 requires a 100% volumetric examination of the RPV nozzle-to-vessel welds as defined by Figure IWB-2500-7. Inspections may be partially deferred under the following conditions: If examinations are conducted from inside the component and the nozzle weld is examined by straight beam ultrasonic method from the nozzle bore, the remaining examinations required to be conducted from the shell inside diameter may be performed at or near the end of each inspection interval.

Examination Category B-D, Item B3. 100 requires a 100%

volumetric examination of. the RPV nozzle inside radius sections as defined by Figure IWB-2500-7. At least 25% but not more than 50% (credited) of the nozzles shall be examined by the end of the first inspection period and the remainder by the end of the inspection interval.

Licensee's Code Relief Re uest: Relief is requested to defer the volumetric examinations of the RPV nozzle-to-vessel welds and nozzle inside radius sections to the end of the inspection interval.

Licensee's Pro osed Alternative Examination: The Licensee proposes to perform both nozzle-to-vessel examinations (from the nozzle bore and from the shell inside diameter) at or near

I the end of the interval. The nozzle inside radius examinations will also be performed at this time. This more practical approach will allow all the required examinations to be performed at the same time on all the nozzles and nozzle inside radii.

Licensee's Basis for Re uestin Relief: The Licensee states that examinations from the nozzle bore and nozzle inside radius examinations can be performed on only two (outlets) of the six major nozzles without removal of the core barrel. The mechanized examination of the two accessible nozzle and inside radius sections is expensive, and the nozzle-to-vessel examination is only a partial examination from the nozzle bore. From a technical position considering the progress which is being made in ultrasonic examination equipment and techniques and for the correlation of data obtained from the bore with that obtained from the shell, it is highly desirable to perform both examinations at the same time.

The Licensee's January 16, 1990 submittal stated that Rochester Gas and Electric received relief for R. E. Ginna for the second interval (1979-1989) allowing deferral of all vessel mechanized examinations including category B-D to the end of the second interval. Full examinations of the RPV nozzle-to-vessel welds (Category B-D) were performed from the nozzle bores during the end of interval March-April 1989 refueling outage. All RPV nozzle inside radius section examinations were also performed at this time. All examinations were performed in accordance with the 1974 Edition, Summer 1975 Addenda of the ASME Code.

Indications were recorded and analyzed during the series of examinations performed at the 1989 outage. Comparisons of their size to the same indications recorded during the preservice examination and the 1979 end of the first interval inservice examination led to no indications of growth of defects. The indications were sized utilizing both

~ I ~ ~

fg'

conventional beam spread techniques and specially developed focused beam sizing techniques. No evidence of growth was detected by utilizing these examination techniques. These examinations were witnessed by the NRC and their consultants during the 1989 outage.

Results of the 1989 examinations with comparative sizing calculations and fracture mechanics evaluation were submitted to the NRC on May, 4, 1989. The data provided were accepted by the NRC on June 5, '1989 with no requirements for augmented examinations. The Licensee has, therefore, scheduled the next series of Category B-D RPV examinations for the 1999 time frame (end of this 10-year interval). The Category B-D welds and inside radius sections for all vessels other than the reactor vessel have been scheduled for examination during the three periods of the third interval. By following the 1986 Code criteria, the Code would require a nozzle examination from the bore during the first period of the third interval. Since all reactor vessel examinations, including nozzle-to-shell from both the bore and shell and nozzle inside radius sections, were accomplished in 1989, the prescribed B-D, B3.90 and B3.100 Code criteria would allow another 10 years before the reexamination.

Since the examinations were accomplished completely in 1989, the Licensee proposes to reexamine them at the end of the third interval. The Licensee also believes that the, results obtained from an examination performed during the first period of the third interval would not provide the best data to ensure additional safety and system reliability. Also, performing this type of examination at a constant frequency rather than a year or two following a major examination of that same component will produce more meaningful results.

Evaluation: Paragraph IWB-2420(a), "Successive Inspections,"

states that the sequence of component examinations established during the first inspection interval shall be repeated during 10

each successive inspection interval, to the extent practical.

Since the examinations were performed during the third period of the second interval with NRC approval, the intent of the Code will be met by examining these welds during the third period of the third interval.

Conclusions:

Based on the above, it is concluded that the intent of the Code will be met by the alternative schedule.

Therefore, it is recommended that relief be granted as requested.

3. 1.2 Pressurizer (No relief requests)
3. 1.3 Heat Exchan ers and Steam Generators (No relief requests)
3. 1.4 Pi in Pressure Boundar 3.1.4.1 Re uest for Relief No. 16 Part 1 of 2 Examination Cate or B-K-I Item B10.10 Class 1 Pi in Inte rail Welded Attachments NOTE: Request for Relief. No. 16 was withdrawn by the Licensee in the January 16, 1990 submittal, which states the following:

"Relief Request Number 16 is not required by the Code. The associated program plan tables will be corrected and updated to assure accurate accounting.

This activity will be performed to reflect the

'non-requirement'ode status since the associated thicknesses are < 5/8" for class 1 and < 3/4" for class 2. Relief Request Number 16 is not required and will be deleted."

11

3. 1.5 Pum Pressure Boundar 3.1.5.1 Re uest for Relief No. 4 Examination Cate or B-L-1 and B-L-2 Items B12. 10 and 812.20 Class 1 Pum Casin Welds and Pum

~Cssin s Code Re uirement: Section XI, Table IWB-2500-1, Examination Category B-L-1, Item B12.10 requires a 100% volumetric examination of Class 1 pump casing welds as defined by Figure IWB-2500-16. Examination Category B-L-2, Item B12.20 requires a 100% visual (VT-3) examination of the internal surfaces of Class 1 pump casings.

Licensee's Code Relief Re uest: Relief is requested from performing the Code-required volumetric and visual (VT-3) examinations of the reactor coolant pump casing welds and internal, surfaces, respectively.

Licensee's Pro osed Alternative Examination: A visual examination (VT-1) of the external surfaces of the welds of one pump casing will be performed. A visual examination (VT-3) of the internal surfaces will be performed each time a pump is disassembled. A visual examination (VT-2) of the exterior of all pumps will be performed during the hydrostatic pressure test required by Table IWB-2500-1,'Category B-P. Also, an evaluation will be performed to demonstrate the safety and serviceability of the pump casing. In making this assessment, thermal aging embrittlement and any other processes that may degrade the properties of the pump casing during service will be considered.

Licensee's Basis for Re uestin Relief: The two reactor pumps for R. E. Ginna are Westinghouse Model 93 pumps.

'oolant Each pump casing is fabricated by welding four stainless steel (SA351 CFS) castings together. Thus, there are three 12

circumferential pressure retaining welds requiring volumetric inspection in accordance with Category B-L-l.

The Licensee states that the unsuitability of ultrasonic examination was demonstrated during the "A" reactor coolant pump examination in 1980 when an attempt was made to determine the wall thicknesses using ultrasonic examination techniques.

At that time, it was determined that the casing welds must be inspected using the miniature linear accelerator (HINAC).

Radiographic examination using the HINAC was performed on the R. E. Ginna "A" reactor coolant pump during the Spring 1981 refueling outage. This examination was performed by placing the HINAC inside the pump casing and placing the film on the outside of the pump. To perform the examination, the pump was completely disassembled. Also, the insulation on the casing exterior was removed to permit film placement.

Additionally, the pump bowl must be dry for installation of the HINAC. Therefore, all fuel assemblies were removed from the reactor vessel and the vessel water level lowered to below the nozzles. Complete disassembly of the pump was also required to conduct the VT-1 examination in accordance with-'Category B-L-2.

No problems have been found with the welds at R. E. Ginna or other sites. Additionally, no problems have been found during the Category B-L-2 visual examination. Visual examination was conducted at R. E. Ginna by using the video camera on the MINAC.

The whole body exposure to personnel during the spring 1981 refueling outage directly attributable to the reactor coolant pump "A" examinations is 93,067 millirem. This does not include the dose received during the complete core unload to get the plant in condition for the reactor coolant pump

'isassembly.

13

The nuclear industry has been successfully applying leak-before-break concepts to primary loop and Class 1 auxiliary piping systems of commercial nuclear power pl,ants.

Currently, the analyses supporting such concepts come under the review of the NRC by General Design Criteria-4 (GOC-4).

Eight different models of reactor coolant pumps are used in Westinghouse PWRs. Model 93 methodology used in the analyses is consistent with that recommended in NUREG-1061, Vol. 3 and GDC-4. A finite element stress analysis model for the Model 93 pump was developed.

The reactor coolant pump casings are cast stainless steel. The chemistries of each heat of material used in the pumps were used to determine the fracture toughness. The phenomenon of thermal aging was addressed.

The program successfully demonstrates that leak-before-break analyses are applicable to all primary pump casings of all Westinghouse design PWRs for which the screening loads are reasonably applicable and the fracture toughness is known.

Evaluation: The volumetric examination is impractical to perform to the extent required by the Code because radiographic techniques for the subject pump casing welds require complete disassembly of the pumps, and ultrasonic examinations are limited by the coarse grain structure inherent in thick stainless steel castings.

The visual examination is performed to determine whether unanticipated severe degradation of the casing is occurring due to phenomena such as erosion, corrosion, or cracking. However, previous experience during examination of similar pumps at other 'plants has not shown any significant degradation of pump casings.

14

0 "I

I QF

~t

The disassembly of the pumps for the sole purpose of inspection is a major effort and, in addition to the possibility of damage to the pumps, could result in personnel receiving excessive radiation exposure. However, if the pumps are disassembled for maintenance, the Code-required volumetric and visual examinations should be performed.

Conclusions:

Based on the above evaluation, it is concluded that the Code requirement is impractical. Therefore, it is recommended that relief be granted provided that (a) visual examination (VT-3) of the internal surfaces of the pumps is performed whenever the pumps are disassembled, (b) volumetric examination of the pump casing welds is performed whenever the welds are exposed due to disassembly of the pump, (c) a surface examination of the pump casing welds is performed if the pumps are not disassembled, and (d) if the pumps have not been disassembled, this fact should be reported by the Licensee in the ISI Summary Report at the end of the interval.

3. 1.6 Valve Pressure Boundar 3.1.6.1 Re vest for Relief No. 5 . Examination Cate or 8-M-2 Item B12.50 Class 1 Valve Bod Internal Surfaces Code Re uirement: Section XI, Table IWB-2500-1, Examination Category B-M-2, Item 812,50 requires- a 100% visual (VT-3) examination of Class 1 valve body internal surfaces.

Examinations are limited to at least one valve, within each group of valves that are of the same size, constructional design, and manufacturing method, and that perform similar functions in the system.

Licensee's Code Relief Re uest: Relief is requested from performing the Code-required visual (VT-3) examination of the valve body internal surfaces of one valve in each of the following four groups of Class 1 valves:

15

Size Valve

~In. Number Mf T e Line Number 10 842A Darling/Check 10-SI2-2501-A 10 842B Darling/Check 10A-S I 2-2501- 8 10 867A Darling/Check 10-SI2-2501-B 10 867B Darling/Check 10A-S I 2-2501-B 10 700 Velan/Gate 10A-RCO-2501-A 10 701 Velan/Gate 10A-AC7-2501-A 10 720 Velan/Gate 10A-AC7-2501-B 10 721 Velan/Gate 10A-AC7-2501-B 853A Velan/Gate 6A-RC-2501-A 853B Velan/Gate 6A-RC-2501-B 852A Velan/Check 6A-RC-2501-A 8528 Velan/Check 6A-RC-2501-B Licensee's Pro osed Alternative Examination: The Licensee states that, as standard maintenance practice dictates, when these valves are disassembled for maintenance purposes, a visual examination of the internals and internal pressure boundary surfaces will be performed to the extent practical.

Licensee's Basis for Re uestina Relief: The Licensee states that, to complete the subject examination, unnecessary expenditures of man-hours and manrem are required with essentially no compensating increase in plant safety. Also, the structural integrity afforded by valve casing material used will not significantly degrade over the lifetime of the valve.

Based on data compiled from a plant similar in age and design to Ginna Station, it is expected that approximately 100 manhours and 5 manrem exposure would be required to disassemble, inspect, and reassemble these valv'es. Performing this visual examination under such adverse conditions, high dose rates (30 to 40 R/hr), and poor as-cast surface conditions, realistically provides little additional information as to the valve's casing integrity.

The valve material, a high-strength cast stainless steel (ASTt1 A351-CF8), is widely used in the nuclear industry and has 16

~

~

1 ~t

performed extremely well. The presence of some delta ferrite (typically 5% or more) substantially increases resistance to intergranular stress corrosion cracking. The delta ferrite also helps the material to resist pitting corrosion in chloride containing environments.

The Licensee further states that adequate safety margins are inherent in the basic valve design and that public health and safety will not be adversely affected by not performing a visual examination of the valve internal pressure boundary surfaces. Additionally, this visual examination adds little or no value to the overall safety of the plant and subjects plant personnel to unnecessary radiation exposure.

Evaluation: The visual examination is performed to determine whether unanticipated severe degradation of the valve body is occurring due to phenomena such as erosion, corrosion, or cracking. However, previous experience during examination of similar valves at other plants has not shown any significant degradation of valve bodies.

Disassembly of the valves for the sole purpose of inspection is a major effort and, in addition to the possibility of damage to the valves, could result in personnel receiving excessive radiation exposure. However, if the valves are disassembled for maintenance, the internal surfaces should be examined.

==

Conclusions:==

Hased on the above evaluation, it is concluded that the Code requirement is impractical. Therefore, it is recommended that relief be granted provided that (a) visual (VT-3) examination of the internal surfaces of the valves is performed whenever the internal surfaces are made accessible due to disassembly and (b) if the valves have not been disassembled, this fact should be reported by the Licensee in the ISI Summary Report at the end of the interval.

17

l J f*

P

3: 1.7 General (No relief requests) 3.2 Class 2 Com onents 3.2. 1 Pressure Vessels (No relief requests) 3.2.2 ~Pi in 3.2.2. 1 Re uest for Relief No. 15 Examination Cate or C-F-1 and C-F-2 Items C5. 10 and C5.50 Class 2 Pi in Welds NOTE: Request for Relief No. 15 was withdrawn by the Licensee in the January 16, 1990 submittal, which states the following:

"Request for Relief Number 15 is not required by the Code. In the Class 2 allocations tables, the welds concerning this relief are included in the tables and in the program plan tables. Since the relief request is not required to meet the code, this relief request will be deleted. Changes to the allocation tables and in the program plan tables will be made to insure correct accountability."

3.2.2.2 Re uest for Relief No. 16 Part 2 of 2 Examination Cate or C-C Item C3.20 Class 2 Pi in Inte rail Welded Attachments NOTE: Request for Relief No. 16 was withdrawn by the Licensee in the January 16, 1990 submittal, which states the following:

"Relief Request Number 16 is not required by the Code. The associated program plan tables will be corrected and updated to assure accurate accounting.

This activity will be performed to reflect the "non-requirement" code status since the associated thicknesses are < 5/8" for class 1 and < 3/4" for class 2. Relief Request Number 16 is not required and will be deleted."

3.2.3 ~Pum s (No relief requests) 18

Ipl v

gt' kt

3.2.4 Valves (No relief requests) 3.2.5 General (No relief requests) 3.3 Class 3 Com onents (No relief requests) 3.4 Pressure Tests 3.4. 1 Class 1 S stem Pressure Tests (No relief requests) 3.4.2 Class 2 S stem Pressure Tests 3.4.2. 1 Re uest for Relief No. 7 S stem H drostatic Test of Three Char in Pum s and Dischar e Pi in to Dischar e Isolation Valves in the Chemistr and Volume Control S stem Code Re uirement: Section XI, Par'agraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.

Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of Charging Pumps 1, 2, and 3 and associated discharge piping to discharge isolation valves in the Chemistry and Volume Control System at the required pressure of 3420 psig.

Licensee's Pro osed Alternative Examination: The Licensee states that, during the hydrostatic test and associated VT-2 19

f l

, ll cN

visual examination, the charging pumps and associated discharge piping to the first isolation valves will be tested at a pressure of 2400 psig.

Licensee's Basis for Re uestin Relief: The Licensee states that the charging pumps have a hydrostatic test pressure limitation on the seals of 2400 psig, as specified by the pump manufacturer. As a result, the pumps and associated discharge piping to the first isolation valves cannot be tested to the required Code test pressure.

Evaluation: The pump design does not permit hydrostatic testing of the CVC charging pumps and associated discharge piping to the first isolation valves at the Code-required test pressure without overpressurizing the pump seals. Therefore, the Code-required hydrostatic test pressure is impractical to attain. The Licensee's proposed alternative test at the reduced pressure of 2400 psig will provide reasonable assurance of the continued inservice structural integrity.

Conclusions:

Based on the above, it is concluded that the Code-required hydrostatic test is impractical to perform.

Therefore, it is recommended that relief be granted as requested.

3.4.2.2 Re uest for Relief No. 8 S stem H drostatic Test of Reactor Coolant S stem Over ressure Protection Nitro en Accumulator S stem Valves PCV 430 and PCV 431C Code Re uirement: Section XI, Paragraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number 20

I' iO

e of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety 'or relief valves, the system design pressure shall be substituted for the system pressure.

Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the reactor coolant system (RCS) overpressure protection nitrogen accumulator system valves PCV 430 and PCV 431C at the required test pressure of 137.5 psig.

Licensee's Pro osed Alternative Examination: The Licensee states that the RCS overpressure nitrogen accumulator system will be tested per the Code requirements up to the flex connection to the valve operator. In addition, an inservice pressure test at operating pressure will be performed once each inspection period on the piping, including the diaphragm.

Licensee's Basis for Reouestin Relief: The Licensee states that the diaphragms in the subject valve operators are only designed to withstand a maximum pressure of 105 psig and, therefore, cannot be tested to the required Code test pressure.

Evaluation: The system's design does not permit hydrostatic testing of the RCS overpressure protection nitrogen accumulator system valves PCV 430 and PCV 431C at the Code-required test pressure without overpressurizing the diaphragms in the operators of these valves. Therefore; the Code-required hydrostatic test is impractical to perform. The inservice pressure test, which includes the diaphragms, will provide, reasonable assurance of the continued inservice structural integrity.

21

Conclusions:

Based on the above, it is concluded that the Code-required hydrostatic test is impractical to perform.

Therefore, it is recommended that relief be granted as requested.

3.4.2.3 Re uest for Relief No. 9 S stem H drostatic Test of the Secondar Side of the Steam Generator and Associated Main Steam

~Pl 1 II Code Re uirement: Section XI, Paragraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1.10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.

Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the secondary side of the Steam Generator and associated Main Steam piping at the required pressure of 1356 psig.

Licensee's Pro osed Alternative Examination: The Licensee states that the secondary side of the Steam Generator and associated Hain Steam piping will be tested at a pressure of 1194 psig, which corresponds to 1. 10 times the system pressure.

Licensee's Basis for Re uestin Relief: The Licensee states that a pressure differential limitation of 800 psig between the primary and secondary side of the Steam Generator has been adopted. This was established early in plant life due to the 22

~ ~

experiences of some plants with primary side tubesheet cladding separation. To maintain this 800 psig differential and the required pressure on the secondary side, the primary system must be heated to a minimum of 160'F which would result in a problem with heat balance and a potential operational problem during implementation of the test procedure. The administrative controls necessary to ensure a proper and safe test and the complexity required for the test procedure result in a situation that should be minimized.

In addition to the Section XI volumetric and surface examination requirements, the piping is part of the augmented inspection program since it falls within the high energy break criteria.

The Licensee's January 16, 1990 submittal states the following:

"The 800 psi differential pressure limitation was established early in the plant life of R. E. Ginna.

This limitation was initiated after several Westinghouse Steam Generators with explosively welded tubesheet cladding experienced primary side tubesheet cladding separation. The hydrostatic test causes the Steam Generator tubesheet to deflect due to reverse loading (in the direction opposite to normal operation). The pressure limitation of 800 psi is an attempt to limit tubesheet deflection and the potential for cladding failure.

To maintain an 800 psi differential pressure across the tubesheet while performing a Code acceptable hydrostatic test of 1356 psi (1.25 x 1085 psi), the required primary system pressure would be 556 psi (1356 psi - 800 psi).

During, the period of time that a hydrostatic test and associated examination would be performed, the plant is operating with the Low Temperature Overpressure Protection System (LTOP) set points in effect. The LTOP set points are used to limit primary system pressure to 400 psi or less. In order to pressurize the primary system to 556 psi (a value greater than 400 psi) the LTOP set points must be changed to higher values and additionally the steam generators are required to be functional due to primary system pressure. When the steam generators are functional, 23

I P'g gap

safety valises and level instrumentation are also required to be functional. Safety valves cannot be functional during a hydrostatic test due to gagging requirements and level instrumentation cannot be functional since the steam generators are water solid and therefore level readings would be off scale.

LTOP set points are changed when the primary system temperature reaches 350 degree F, thus there is the potential of a Technical Specification violation if the primary system is pressurized to 556 psi.

Technical Specification 3. 1. 1.2 limits the tubesheet differential temperature to 100 degree F while the potential for a differential temperature of 290 degree F (350 deg. F - 60 deg. F) exists.

In order to alleviate these problems, the Steam Generator and downstream piping, to the class boundary, will be pressurized to 1194 psi (1. I x 1085 psi) instead of 1356 psi (1.25 x 1085 psi).

This action will minimize the potential for tubesheet problems while fulfilling the intent of a hydrostatic test to insure the integrity of the pressure boundary.

In addition to the above test, system pressure tests will be performed each period at system operating pressure and temperature to assure system integrity.

The steam generator and associated systems are also subjected to volumetric and surface (Section XI) examinations. The Feedwater and Hain Steam piping is also included in an augmented inservice inspection program to provide additional assurances of the system integrity."

Evaluation: The system's design does not permit pressurizing the secondary side of the Steam Generator and associated Hain Steam piping to the Code-required test pressure without the potential of cladding failure due to reverse loading.

Therefore, the Code-required hydrostatic test is impractical to perform. Pressurizing the components to the alternative test pressures will provide reasonable assurance of the continued inservice structural integrity.

==

Conclusions:==

Based on the above, it is concluded that the Code-required hydrostatic test of the secondary side of the Steam Generator and associated Hain Steam piping is 24

impractical. Therefore, it is recommended that relief be granted as requested.

3.4.2.4 Re uest for Relief No.'13 S stem H drostatic Test of Non-ISI Classified S stems Code Re uirement: Section XI, Paragraph IWC-5222(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.

Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the non- ISI classified systems, which do not carry radioactive gases or fluids, that contain lines penetrating primary containment.

Relief is requested'for the following lines:

Penetration Descri tion 120 Nitrogen Fill to Safety Injection Accumulators; I-SI-903 121 Nitrogen Supply to Pressurizer Relief Tank; 3/4-RC-151 121 Reactor Nakeup Water to Pressurizer Relief Tank; 2-RC-151 124 Post Accident Test Point Containment Atmosphere 124 Post Accident Test Point Containment Recirculating Filter and Cooling Unit C Discharge 132 Containment Depressurization and Mini-Purge Exhaust 202 Hydrogen Supply to Recombiner 8 Hain Burner 202 Hydrogen Supply to Recombiner 8 Pilot Burner 203 Post Accident Test Point Containment Atmosphere 25

(continued)

Penetration Descri tion 203 Post Accident Test Point Containment Recirculation Filter and Cooling Unit 'D Discharge 210 Recombiner Oxygen Makeup to Containment 301 Heating Steam Supply to Containment; 2-HS-150-4 303 Heating Steam Condensate Return from Containment 304 Hydrogen Supply to Recombiner A Main Burner 304 Hydrogen Supply to Recombiner A Pilot Burner 305 Post Accident Test Point Containment Atmosphere 305 Post Accident Test Point Containment Recirculating Filter and Cooling Unit A Discharge 305 Post Accident Test Point Containment Recirculating Filter and Cooling Unit B Discharge 305 Containment Air Sample Inlet 305 Containment Air Sample Outlet 307 Fire Service Water 309 Containment Mini-Purge Supply 310 Instrument Air Supply to Containment; 2-IA-125-8 310 Service Air Supply to Containment 313 Containment Leakrate Test Connection Depressurization 317 Containment Leakrate Test Connection Supply; 6-AT-150-4 324 Demineralized Water 332 Hydrogen Monitor A Inlet 332 Hydrogen Monitor 8 Inlet 332 Hydrogen Monitor Outlet Licensee's Pro osed Alternative Examination: The Licensee proposes to test these lines in accordance with 10 CFR 50 Appendix J, "Reactor Cont'ainment Leakage Testing for Water Cooled Power Reactor," commensurate with the safety function the line performs in accordance with Technical Specification, Surveillance requirements. Additionally, at least once each period, exposed portions of the lines penetrating primary containment will be examined during normal system operation, Licensee's Basis for Re uestin Relief: The Licensee states that the safety function of these lines is to become part of the containment isolation system during periods when containment isolation is required. Therefore, the pressure testing requirements should be based on the containment system design not the associated process system design requirements.

26

l I I

Al)>>

The Licensee's January 16, 1990 submittal states the following:

"Due to the vintage of the R. E. Ginna Plant, the piping within these penetration boundaries was not constructed to Class 2 requirements, Regulatory Guide 1.26 does not require these penetrations to be classified as (juality Group B or Class 2. However, Rochester Gas and Electric has optionally classified these lines Class 2. For optionally classified piping, IWA-1320(e) allows the Owner the option to apply the Section XI rules. In the case of these lines, Rochester Gas & Electric has concluded that Appendix J testing and a VT-2 examination once per period during normal system operation will provide testing commensurate with the safety function. In addition, these lines are now subject to ASHE Section XI rules for Repairs and Replacements."

Evaluation: Although these lines were not constructed to Class 2 requirements, the Licensee has not shown that the system's safety criteria permit these lines to be nonnuclear safety class. Therefore, paragraph IWA-1320(e) may not be applicable.

In addition, Appendix J addresses the structural integrity of the primary containment, not the structural integrity of the Code Class 2 process piping for which relief is being requested. The request for relief does not contain information about the pressures involved. The proposed Appendix J test pressure may be much lower than the Code-required test pressure, in which case the inservice structural integrity would not be identified. Also, the proposed Appendix J test does not identify the location of a leak if present.

I

==

Conclusions:==

Based on the above evaluation, it is concluded that the Licensee has not justified the determination of impracticality. Therefore, it is recommended that relief be denied.

27

0 I l

t'~I

~ )

e 3.4.3 Class 3 S stem Pressure Tests 3.4.3. 1 Re uest for Relief No. 6. S stem H drostatic Test of the Radioactive Waste Holdu Tank NOTE: Request for Relief No. 6 was withdrawn by the Licensee in the January 16, 1990 submittal, which states the following:

"This request is specific to the Code hydrostatic test requirements concerning the waste hold-up tank.

Liquid waste from various locations in the plant including the reactor coolant drain tank, chemical drain tank, intermediate and auxiliary building sumps, floor, laundry and shower drains are diverted to the waste hold-up tank. During cold shut down and refueling outages, the level in this tank varies depending on the activities performed during an outage. If required to perform the Code examination when the tank is full, there is a possibility of a hazardous situation occurring. Liquid waste could be diverted to the waste hold-up tank while performing the required Code static head examination. This action could result in a liquid radioactive waste spill at one of various locations.

It was the intent of this relief request to prevent a hazardous event from occurring. Upon review of your inquiry, we have concluded that it is possible to perform the required examination on this component.

It will require greater coordination with Operations and plant outage activities than is normally expected, but it can be performed. Therefore, Relief Request Number 6 is no longer required."

3.4.3.2 Re vest for Relief No. 10 S stem H drostatic Test of the Standb Auxiliar Feedwater Pum Recirculation Line Code Re uirement: Section XI, Paragraph IWD-5223(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems 28

(or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.

Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic, test of the Standby Auxiliary Feedwater Pump recirculation line between valves AOV 9710A and AOV 97108 and their associated downstream flow orifices.

Licensee's Pro osed Alternative Examination: The Licensee states that the Class 3 portion of this piping shall be VT-2 examined at operational discharge pressure once each period during functional testing.

Licensee's Basis for Re uestin Relief: The Licensee states that, in order to hydrostatically test this piping to Section XI requirements, the pressure reducing flow orifices downstream of valve AOV 9710A and B would require removal and blank flanges installed. System piping does not provide an isolation valve between the orifices and the Condensate Supply Tank. A significant reduction in tank level would be required to facilitate orifice removal, which is considered to be impractical.

Evaluation: The Licensee has not provided adequate information to justify the determination of impracticality. Information that should be addressed includes (a) why the Licensee considers it impractical to lower the Condensate Supply Tank level and (b) whether or not the use of freeze plugs has been considered and, if so, why it would be impractical to use them.

==

Conclusions:==

Based on the above, it is concluded that the Licensee has not demonstrated that the Code-required hydrostatic test is impractical. Therefore, it is recommended that relief be denied.

29

3.4.3.3 Re uest for Relief No. 11 S stem H drostatic Test of the Boric Acid Filter and Associated Pi in in the Chemical and Volume Control S stem NOTE: Request for Relief No. 11 was withdrawn by the Licensee in the January 16, 1990 submittal, which states the following:

"The flange gasket was 'reviewed with new technical information that eliminated concerns over the safe working pressure of the Boric Acid Filter housing flange gasket.

Upon review of your inquiry, it has been concluded that the Hydrostatic test is possible and will be incorporated into the plan. Therefore, Relief Request Number 11 is no longer required."

3.4.3.4 Re uest for Relief No. 12 S stem H drostatic Test of Portions of the Emer enc Diesel Generation S stem Code Re uirement: Section XI, Paragraph IWD-5223(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.

Licen'see's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of the following portions of the Emergency Diesel Generation System:

(a) Starting Air, including receiver tanks and associated piping, 30

0 \

(Wl

(b) Fuel Oil Transfer pumps, suction and discharge lines, including miscellaneous lines terminating at oil storage tanks, and (c) Jacket Cooling Water system, including miscellaneous lines terminating at the cooling water expansion tanks.

Licensee's Pro osed Alternative Examination: The Licensee states that inservice testing shall be performed on the Air Start System at least once each period in accordance with the requirements of Section XI. Additionally, once each quarter, a pressure decay test shall be performed on the air receiver to verify check valve operability in the reverse direction for the air receiver inlet check.

System functional testing shall be performed at least once each period on the Diesel Fuel Oil Transfer and Jacket Cooling Water Systems in accordance with the requirements of Section XI.

In addition to the testing discussed above, Technical Specification 6.4. 1 requires surveillance testing to be performed on a monthly basis, such as verifying operability of the fuel oil transfer pumps and that the diesel starts from normal standby conditions.

Licensee's Basis for Re uestin Relief: The Licensee states that only portions of the piping associated with the components identified above are capable of being pressure tested.

The Air Start System pressure test would require termination prior to reaching the e6gine skid to preclude administrating air to the Air Start Motors. This would leave that portion of piping between the Air Start Motors to the first isolation, prior to reaching the engine skid, untestable.

31

e 1

I

The Diesel Fuel Oil Transfer system would require flange connection disassembly and the installation of blind flanges to isolate the Diesel Oil Storage Tank, which is vented to atmosphere, and the Day Tank where no means is provided to isolate the transfer pump discharge piping at a point close to the day tank. Additionally, the overflow piping from the day tank to the storage tank, which is identified as Class 3, has no isolation valves installed and is vented to the atmosphere.

Oue to vents to the atmosphere, the Jacket Cooling Water System would require isolating the Cooling Water Expansion Tank, including most of the piping subject to pressure testing. Due to the amount of piping within the Class boundary which is unable to be pressurized, testing in accordance with Section XI requirements would not prove system integrity over and above the existing surveillance Inservice and Functional Testing.

Evaluation: The system's design does not permit pressurizing all of these Class 3 lines to the Code-required test pressure.

Therefore, the Code-required hydrostatic test pressure for the unisolatable portions of this piping is impractical to attain.

The proposed alternative testing will provide reasonable assurance of the continued inservice structural integrity.

Conclusions:

Based on the above, it is concluded that the Code-required hydrostatic test is impractical. Therefore, it is recommended that relief be granted as requested.

i 3.4.3.5 Re uest for Relief No. 14 S stem H drostatic Test of All Pressure Retainin Com onents Within the Class 3 Portion of the Service Water S stem Code Re uirement: Section XI, Paragraph IWD-5223(a) requires that the system hydrostatic test pressure be at least 1. 10 times the system pressure for systems with Design Temperature 32

of 200'F or less, and at least 1.25 times the system pressure for systems with Design Temperature above 200'F. The system pressure shall be the lowest pressure setting among the number of safety or relief valves provided for overpressure protection within the boundary of the system to be tested. For systems (or portions of systems) not provided with safety or relief valves, the system design pressure shall be substituted for the system pressure.

Licensee's Code Relief Re uest: Relief is requested from performing the Code-required hydrostatic test of all pressure retaining components within the Class 3 portion of the Service Water System.

Licensee's Pro osed Alternative Examination: The Licensee states that pressure retaining components within the operational boundary will receive an inservice test at operating pressure and an associated VT-2 visual examination each period during the interval.

Licensee's Basis for Re uestin Relief: The Licensee states that the hydrostatic test requirement for the Service Water system is impractical due to system design which dictates the use of an open-ended test. The portion of the system downstream of the heat exchanger is also open-ended and cannot be hydrostatically tested. The remaining section of the system is only isolatable by means of butterfly valves which were not designed to provide a leak tight boundary. With the system as such, it would be impractical to expect that the leakages, other than at the valves, could be detected.

The ample margin in cooling capacity inherently provided by system design does not dictate the need for an essentially leak tight boundary. Since the system is in constant operation, its integrity, is continually monitored. Thorough inspection of the system each period at the full operating pressure is adequate 33

C

\

>n. IlS. hhrcgtcr ntptttgtory Commtction. Haterials and Chemical Engineering Branch Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

10. SUPPLEMENTARY NOTES
11. ABSTRACT QEO ytorot or ital This report presents the results of the evaluation of the R. E. Ginna Nuclear Power Station Third 10-Year Interval Inservice Inspection (ISI) Program Plan, submitted July 21, 1989, including the requests for relief from the American Society of Hechanical Engineers (ASHE) Boiler and Pressure Vessel Code Section XI requirements which the Licensee has determined to be impractical; The R: E. Ginna Nuclear Power Station Third 10-Year Interval ISI Program Plan is evaluated in Section 2 of this report. The ISI Program Plan is evaluated for (a) compliance with the appropriate edition/addenda of Section XI, (b) acceptability of examination sample, (c) correctness of the application of system or- component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC) reviews. The requests for relief are evaluated in Section 3 of this report.
12. KEY WORDS/OESCRIPTORS ILia wordy or pnrgtct tna wiu catt t rttrgrcntrt in iocgnnp tnc noon,l 13. AVAILASILITYSTAT EMEtIT Unlimited
14. $ ECUIIITYCLASSIFICATION I Thlt petti Unclassified IThn ntportt Unclassified

'I

5. N Uhl 6 E R 0F PA G 6 S
16. PRICE FIR C FORM 335 I249I

s~~ 'V