Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17263B10423 June 1995Technical Ltr Rept Re Third 10-yr Interval Inservice Insp Program Relief RequestHydrostatic
VT-2
ML20091E21430 October 1991Technical Evaluation Rept - Re Ginna Nuclear Power Plant Station Blackout EvaluationSafe Shutdown
Battery sizing
ML17262A61330 September 1991Auxiliary Feedwater System RISK-BASED Inspection Guide for the Ginna Nuclear Power PlantProbabilistic Risk Assessment
ML20084U92031 January 1991Technical Evaluation Rept Pump & Valve Inservice Testing Program,Re Ginna Nuclear Power PlantHigh Radiation Area
Stroke time
Breakaway torque
Cold shutdown justification
Power Operated Valves
ML20058C85830 September 1990Conformance to Reg Guide 1.97:Ginna
ML17261B12430 April 1990Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan:Re Ginna Nuclear Power Station.Boric Acid
Hydrostatic
VT-2
Incorporated by reference
ML20236T98831 October 1987a TRAC-PF1/MOD1 Analysis of the Ginna TUBE-RUPTURE Event on January 25,1982Loop seal
ML20245C25631 July 1987Conformance to Generic Ltr 83-28,Item 2.2.1-Equipment Classification for All Other Safety-Related Components: Ginna, Final Informal Rept
ML20205E39931 July 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Ginna,Haddam Neck,Millstone 3 & Harris 1
ML17251A73031 May 1986Assessment of Removal of Raised Floor & Mod to Fire Detection Zones for Plant Process Computer Sys (PPCS) Computer Room at Ginna Nuclear Plant, Informal ReptSafe Shutdown
Fire Protection Program
ML20205N8329 May 1986Masonry Wall Design,Re Ginna Nuclear Power Plant, Technical Evaluation ReptTornado Missile
Earthquake
ML17254A63718 November 1985Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2,`Post-Trip Review:Data & Info Capabilities'For Robert Emmet Ginna Nuclear Plant,Unit 1, Technical Evaluation Rept
ML20198A33531 October 1985Conformance to Reg Guide 1.97,RE Ginna Nuclear Power PlantSafe Shutdown
Boric Acid
Shutdown Margin
Fuel cladding
ML20210A11731 October 1985Followup SEP Evaluation for Re Ginna Nuclear Power PlantEarthquake
ML20212N66231 August 1985Technical Evaluation Rept for Proposed Change to Operation of Ginna Fuel Pool Charcoal Filter Sys, Informal Rept
ML20244D38710 July 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant.
ML20244D43830 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities
ML20132C82029 March 1985Tendon Evaluation,Re Ginna Nuclear Power Station, Technical Evaluation Rept
ML20095J70030 June 1984Generator Tube Rupture Event - Retran CalculationsHydrostatic
ML20082M9992 December 1983Control of Heavy Loads C-10,RE Ginna Nuclear Power Plant, Technical Evaluation ReptSafe Shutdown
Nondestructive Examination
Control of Heavy Loads
ML20077K9862 August 1983Review of Wind & Tornado Loading Responses,Re Ginna Nuclear Power Plant, Technical Evaluation ReptSafe Shutdown
Tornado Missile
Backfit
ML20077G00129 July 1983Review of Licensee Response to Design Codes,Design Criteria & Loading Combinations,Ginna Nuclear Power Plant,Unit 1, Supplementary Technical Evaluation Rept
ML20079Q7022 March 1983Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept
ML20067D53215 December 1982PWR Main Steam Line Break W/Continued Feedwater Addition, Re Ginna Nuclear Power Plant, Technical Evaluation Rept
ML20076B62924 September 1982ECCS Repts (F-47) TMI Action Plan Requirements,Re Ginna Nuclear Power Plant, Technical Evaluation Rept
ML17256B19610 August 1982Control of Heavy Loads (C-10),Rochester Gas & Electric Corp,Re Ginna Nuclear Power Plant, Draft Technical Evaluation ReptSafe Shutdown
Coatings
Control of Heavy Loads
ML17308A07123 July 1982Auxiliary Feedwater Sys Automatic Initiation & Flow Indication, (F-16,F-17),technical Evaluation ReptAnticipated operational occurrence
ML20027D76915 July 1982Investigation of Failed Tubes from B Steam Generator of Re Ginna Nuclear Power Plant, SER App
ML20063C56923 June 1982Integrated Plant Safety Assessment,Ginna Plant,Sep, Technical Evaluation Rept of Draft NUREG-0821Backfit
ML20069C60428 May 1982Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Technical Evaluation Rept
ML20077J93027 May 1982Design Codes,Design Criteria & Loading Combinations (SEP, III-7.B),RE Ginna Nuclear Power Plant, Final Technical Evaluation Rept
ML17256A97521 May 1982Improvements in Reactor Operator & Senior Reactor Operator Training & Requalification Programs for Re Ginna Nuclear Power Plant, Final Technical Evaluation Rept.Rept Addresses NUREG-0737,Items I.A.2.1 & II.B.4Fuel cladding
Power change
ML20090B47812 May 1982Ruptured Tube Analysis for Ginna, Technical Evaluation Rept
ML17309A27027 April 1982Hydrological Considerations, Technical Evaluation Rept for SEP Topics II-3.A,II-3.B,II-3.B.1,II-3.C & II-4.DSafe Shutdown
Ultimate heat sink
ML17256A80831 March 1982Structural Review of the Robert E. Ginna Nuclear Power Plant Under Combined Loads for the Systematic Evaluation ProgramSafe Shutdown Earthquake
Earthquake
ML17258A61031 January 1982SEP Topic VI-4,Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation,Re Ginna Nuclear Power Plant, Informal Rept
ML17309A24331 January 1982to SEP Topic VI-4, Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation.
ML17258A40231 December 1981SEP Topic VII-2,ESF Sys Control Logic & Design,Ginna Nuclear Power Plant 1, Informal ReptSafe Shutdown
ML20039G50131 December 1981SEP Topic VII-2,ESF Sys Control Logic & Design,Ginna Nuclear Power Plant 1.Safe Shutdown
ML20039A55530 November 1981Electrical,Instrumentation & Control Sys Support for SEP, SEP Topic V-11.A,electrical,instrumentation & Control Features for Isolation of High & Low Pressure SysPower-Operated Valves
ML17258A42830 November 1981Review of Design & Operation of Ventilation Sys for SEP Plants Rochester Gas & Electric Co,Re Ginna Nuclear Power Plant, Revised Draft Technical Evaluation ReptSafe Shutdown
Boric Acid
ML17258A35730 November 1981Final Evaluation of SEP Topic VI-7.C.1, Independence of Redundant Onsite Power Sys,Re Ginna Nuclear Station.
ML20039A68830 November 1981to SEP Topic VIII-4,Electric Penetrations of Reactor Containment,Re Ginna Nuclear Station, Informal Rept
ML20039A68430 November 1981SEP Topic VI-7.C.1,Independence of Redundant Onsite Power Sys,Re Ginna Nuclear Station, Informal Rept
ML20039A45230 November 1981Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept
ML17258A22430 September 1981SEP Topic VIII-4,Electrical Penetrations of Reactor Containment,Re Ginna Nuclear Station,Unit 1, Informal Rept
ML17258A70331 December 1980Seismic Review of the Robert E. Ginna Nuclear Power Plant as Part of the Systematic Evaluation ProgramSafe Shutdown
Boric Acid
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Backfit
ML17311A00730 September 1980SEP Review of SEP Safety Topic VII-03,Associated W/Electrical,Instrumentation & Control Portions of Sys Required for Safe Shutdown of Ginna Nuclear Power Plant.Safe Shutdown
Boric Acid
Ultimate heat sink
ML17258A70031 August 1980SEP Review of NRC Safety Topic III-1,Associated W/Electrical,Instrumentation & Control Portion of Classification of Structures Components & Sys for Ginna Nuclear Power Plant.Safe Shutdown
Boric Acid
Tornado Missile
Safe Shutdown Earthquake
Turbine Missile
ML17258A70131 August 1980SEP Review of NRC Safety Topic VII-2,Associated W/Electrical,Instrumentation & Control Portions of Engineered Safety Feature Sys Control Logic & Design for Ginna Nuclear Power Plant.Safe Shutdown