ML17286A940: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/15/1991
| issue date = 07/15/1991
| title = Special Rept:On 910604,time History Triaxial Acceleration Sensor Found Malfunctioning During Performance of Seismic Sys Maint Activities.Failed Unit Returned Under Warranty to Supplier for Repair.Sys Now Fully Operational
| title = Special Rept:On 910604,time History Triaxial Acceleration Sensor Found Malfunctioning During Performance of Seismic Sys Maint Activities.Failed Unit Returned Under Warranty to Supplier for Repair.Sys Now Fully Operational
| author name = BAKER J W
| author name = Baker J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name = MARTIN J B
| addressee name = Martin J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| docket = 05000397
| docket = 05000397
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:FORD 1 REGUL+RY INFORMATION DZSTRZBUTZ+
{{#Wiki_filter:FORD           1 REGUL+RY INFORMATION DZSTRZBUTZ+ SYSTEM (RIDE)
SYSTEM (RIDE)ACCESSION NBR:9107310153 DOC.DATE: 91/07/15 NOTARIZED:
ACCESSION NBR:9107310153       DOC.DATE: 91/07/15   NOTARIZED: NO       DOCKET  I FACIL:50-397   WPPSS Nuclear Project, Unit 2, Washington Public   Powe 05000397 AUTH. NAME         AUTHOR AFFILIATION BAKER,J.W.         Washington Public Power Supply System RECIP.NAME         RECIPIENT AFFILIATION MARTIN,J.B.       Region 5 (Post 820201)
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION BAKER,J.W.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B.
Region 5 (Post 820201)


==SUBJECT:==
==SUBJECT:==
Special rept:on 910604,time history triaxial acceleration sensor found malfunctioning during performance of seismic sys maint activities.
Special rept:on 910604,time history triaxial acceleration sensor found malfunctioning during performance of seismic sys maint activities. Failed unit returned under warranty to supplier for repair.Sys   now fully operational.
Failed unit returned under warranty to supplier for repair.Sys now fully operational.
DISTRIBUTION CODE: ZE22D     COPIES RECEIVED:LTR TITLE: 50.73/50.9 Licensee Event Report 2  ENCL  Z SIZE."
DISTRIBUTION CODE: ZE22D COPIES RECEIVED:LTR 2 ENCL Z SIZE." TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.NOTES: DOCKET I 05000397 RECIPIENT ID CODE/NAME PD5 LA ENG,P.L.INTERNAL: ACNW AEOD/DOA AEOD/ROAB/DSP NRR/DET/EMEB 7E NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICBSH3 NRR/DST/SRXB SE RES/DSIR/EIB EXTERNAL: EGSG BRYCEFJ.H NRC PDR NSIC POOREFW.COPIES LTTR ENCL 1'1 1 2 2 1 1 2 2 1 1 1 1 2 2 1 1 1 1 1 1 3 3 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD ACRS AEOD/DSP/TPAB NRR/DET/ECMB 9H NRR/DLPQ/LHFB10 NRR/DOEA/OEAB NRR/DST/SELB SD NR LBSD1 EG FILE 02 RGN5 FILE 01 L ST LOBBY WARD NSIC MURPHYFG.A NUDOCS FULL TXT COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 33 vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 July 15, 1991 G02-91-135 Mr.J.B.Martin Regional Administrator USNRC, Region V 1450 Maria Lane, Suite 210 Walnut Creek, Ca.94596 7 7 r~t r fr l
(LER), Incident Rpt, etc.
NOTES:
RECIPIENT        COPIES          RECIPIENT       COPIES ID CODE/NAME     LTTR ENCL      ID CODE/NAME    LTTR ENCL PD5 LA               1 '        PD5 PD              1    1 ENG,P.L.             1    1 INTERNAL: ACNW                   2    2    ACRS                2    2 AEOD/DOA             1    1    AEOD/DSP/TPAB        1    1 AEOD/ROAB/DSP         2    2    NRR/DET/ECMB 9H      1    1 NRR/DET/EMEB 7E       1    1    NRR/DLPQ/LHFB10      1    1 NRR/DLPQ/LPEB10       1    1    NRR/DOEA/OEAB        1    1 NRR/DREP/PRPB11       2    2    NRR/DST/SELB SD      1    1 NRR/DST/SICBSH3       1    1    NR        LBSD1    1    1 NRR/DST/SRXB SE       1    1      EG  FILE      02    1    1 RES/DSIR/EIB         1    1    RGN5    FILE  01    1    1 EXTERNAL: EGSG BRYCEFJ.H         3     3     L ST LOBBY WARD      1     1 NRC PDR              1     1     NSIC MURPHYFG.A     1     1 NSIC POOREFW.        1     1     NUDOCS FULL TXT      1     1 TOTAL NUMBER OF COPIES REQUIRED: LTTR       33   ENCL   33


==Dear Mr.Martin:==
vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 July 15,  1991                                                                            7        7 G02-91-135 r  ~
t r
Mr. J.B. Martin fr l Regional Administrator USNRC, Region V 1450 Maria Lane, Suite 210 Walnut Creek, Ca. 94596
 
==Dear Mr. Martin:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2, LICENSE NO.NPF-21 SPECIAL REPORT: SEISMIC MONITORING INSTR UMEN1'ATION This Special Report is submitted pursuant to the requirements of WNP-2 Technical Specification section 3.3.7.2"Seismic Monitoring Instrumentation" which requires the instruments to be operable at all times.The seismic monitoring system has been designed and installed to record the response of plant buildings and systems to ground motions produced by earthquakes, This information would be used by plant operators to immediately gauge the relative size of the event and, over the long term, to verify the performance of plant design, The ac tion statement for this specification requi res that"with one or more of the above required seismic monitoring instruments inoperable for more than 30 days, in lieu of any other report reqUired by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification
NUCLEAR PLANT NO. 2, LICENSE NO. NPF-21             SPECIAL REPORT: SEISMIC MONITORING INSTR UMEN1'ATION This Special Report is submitted pursuant to the requirements of WNP-2 Technical Specification section 3.3.7.2 "Seismic Monitoring Instrumentation" which requires the instruments to be operable at all times.
The seismic monitoring system has been designed             and installed to record the response of plant buildings and systems to ground motions produced by earthquakes,   This information would be used by plant operators to immediately gauge the relative size of the event and, over the long term, to verify the performance of plant design, The ac tion statement for this specification requi res that "with one or more of the above required seismic monitoring instruments inoperable for more than 30 days, in lieu of any other report reqUired by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 10 days outlining the cause of the malfunction and the plans for restoring the instrument(s) to operable status."
91073iOi53 9i0715 PDR S
ADDCK  05000397 PDR (pPS/q
 
I On June 4, 1991 with the plant in Node 4 {cold shutdown) during the extended maintenance outage the Time History Triaxial Acceleration Sensor (SEIS-SHA-3) was found to be malfunctioning during the performance of Seismic System maintenance activities. This free-field accelerometer is located 1000 feet from all large structures and transmits electrical signals to the main control room where they are, recorded on magnetic tape. The operator can obtain a visual output on paper tape by removing the magnetic tape from the tape recorder and playing    it back on the Playback Unit located immediately above the recorder. There are no alarms or lights in the control room associated with 'this sensor. This sensor is normally not energized unless the reactor building foundation experiences accelerations greater than 0.01g, at which time the seismic trigger will activate    all of  the triaxial time history accelerometers and recorders.
Performance of maintenance work to determine the cause oF spurious noise pulses on the seismic system tape recording, found the accelerometer to not be responding in one of the three axis. The failed unit was returned, under warranty, to the supplier for repair. The supplier of the failed accelerometer is Kinemetrics/Systems 222 Vista Avenue Pasadena, CA 91107. The cause of the failure is unknown. No fai lure analysis was done at WNP-2 because of warranty considerations. At the time of the event, al1 oF the WNP-2 spare accelerometers were at the suppliers being re-spanned and no accelerometers were'vai lab'le to replace the failed unit. A accelerometer was received from the supplier, and  it was installed on July 10, 1991;    The system is now fully operational.
Very  truly yours,
    . Baker (H/0 927M)
WNP-2  Plant Manager cc:  NRC Document  Control  Desk Hr. C, Sorenson,, NRC Resident Inspector    (H/D 901A)
INPO Records Center  Atlanta, GA Ms. DotLie Sherman, ANI Hr. D. L. Williams, BPA (H/D. 399)
NRC Resident Inspector Walkover Copy


====6.9.2 within====
(
the next 10 days outlining the cause of the malfunction and the plans for restoring the instrument(s) to operable status." 91073iOi53 9i0715 PDR ADDCK 05000397 S PDR (pP S/q I
C}}
On June 4, 1991 with the plant in Node 4{cold shutdown)during the extended maintenance outage the Time History Triaxial Acceleration Sensor (SEIS-SHA-3) was found to be malfunctioning during the performance of Seismic System maintenance activities.
This free-field accelerometer is located 1000 feet from all large structures and transmits electrical signals to the main control room where they are, recorded on magnetic tape.The operator can obtain a visual output on paper tape by removing the magnetic tape from the tape recorder and playing it back on the Playback Unit located immediately above the recorder.There are no alarms or lights in the control room associated with'this sensor.This sensor is normally not energized unless the reactor building foundation experiences accelerations greater than 0.01g, at which time the seismic trigger will activate all of the triaxial time history accelerometers and recorders.
Performance of maintenance work to determine the cause oF spurious noise pulses on the seismic system tape recording, found the accelerometer to not be responding in one of the three axis.The failed unit was returned, under warranty, to the supplier for repair.The supplier of the failed accelerometer is Kinemetrics/Systems 222 Vista Avenue Pasadena, CA 91107.The cause of the failure is unknown.No fai lure analysis was done at WNP-2 because of warranty considerations.
At the time of the event, al1 oF the WNP-2 spare accelerometers were at the suppliers being re-spanned and no accelerometers were'vai lab'le to replace the failed unit.A accelerometer was received from the supplier, and it was installed on July 10, 1991;The system is now fully operational.
Very truly yours,.Baker (H/0 927M)WNP-2 Plant Manager cc: NRC Document Control Desk Hr.C, Sorenson,, NRC Resident Inspector-(H/D 901A)INPO Records Center-Atlanta, GA Ms.DotLie Sherman, ANI Hr.D.L.Williams, BPA (H/D.399)NRC Resident Inspector Walkover Copy (C}}

Latest revision as of 14:12, 29 October 2019

Special Rept:On 910604,time History Triaxial Acceleration Sensor Found Malfunctioning During Performance of Seismic Sys Maint Activities.Failed Unit Returned Under Warranty to Supplier for Repair.Sys Now Fully Operational
ML17286A940
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/15/1991
From: John Baker
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO2-91-135, NUDOCS 9107310153
Download: ML17286A940 (5)


Text

FORD 1 REGUL+RY INFORMATION DZSTRZBUTZ+ SYSTEM (RIDE)

ACCESSION NBR:9107310153 DOC.DATE: 91/07/15 NOTARIZED: NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B. Region 5 (Post 820201)

SUBJECT:

Special rept:on 910604,time history triaxial acceleration sensor found malfunctioning during performance of seismic sys maint activities. Failed unit returned under warranty to supplier for repair.Sys now fully operational.

DISTRIBUTION CODE: ZE22D COPIES RECEIVED:LTR TITLE: 50.73/50.9 Licensee Event Report 2 ENCL Z SIZE."

(LER), Incident Rpt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 ' PD5 PD 1 1 ENG,P.L. 1 1 INTERNAL: ACNW 2 2 ACRS 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DET/ECMB 9H 1 1 NRR/DET/EMEB 7E 1 1 NRR/DLPQ/LHFB10 1 1 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 NRR/DREP/PRPB11 2 2 NRR/DST/SELB SD 1 1 NRR/DST/SICBSH3 1 1 NR LBSD1 1 1 NRR/DST/SRXB SE 1 1 EG FILE 02 1 1 RES/DSIR/EIB 1 1 RGN5 FILE 01 1 1 EXTERNAL: EGSG BRYCEFJ.H 3 3 L ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MURPHYFG.A 1 1 NSIC POOREFW. 1 1 NUDOCS FULL TXT 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 33

vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 July 15, 1991 7 7 G02-91-135 r ~

t r

Mr. J.B. Martin fr l Regional Administrator USNRC, Region V 1450 Maria Lane, Suite 210 Walnut Creek, Ca. 94596

Dear Mr. Martin:

Subject:

NUCLEAR PLANT NO. 2, LICENSE NO. NPF-21 SPECIAL REPORT: SEISMIC MONITORING INSTR UMEN1'ATION This Special Report is submitted pursuant to the requirements of WNP-2 Technical Specification section 3.3.7.2 "Seismic Monitoring Instrumentation" which requires the instruments to be operable at all times.

The seismic monitoring system has been designed and installed to record the response of plant buildings and systems to ground motions produced by earthquakes, This information would be used by plant operators to immediately gauge the relative size of the event and, over the long term, to verify the performance of plant design, The ac tion statement for this specification requi res that "with one or more of the above required seismic monitoring instruments inoperable for more than 30 days, in lieu of any other report reqUired by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 10 days outlining the cause of the malfunction and the plans for restoring the instrument(s) to operable status."

91073iOi53 9i0715 PDR S

ADDCK 05000397 PDR (pPS/q

I On June 4, 1991 with the plant in Node 4 {cold shutdown) during the extended maintenance outage the Time History Triaxial Acceleration Sensor (SEIS-SHA-3) was found to be malfunctioning during the performance of Seismic System maintenance activities. This free-field accelerometer is located 1000 feet from all large structures and transmits electrical signals to the main control room where they are, recorded on magnetic tape. The operator can obtain a visual output on paper tape by removing the magnetic tape from the tape recorder and playing it back on the Playback Unit located immediately above the recorder. There are no alarms or lights in the control room associated with 'this sensor. This sensor is normally not energized unless the reactor building foundation experiences accelerations greater than 0.01g, at which time the seismic trigger will activate all of the triaxial time history accelerometers and recorders.

Performance of maintenance work to determine the cause oF spurious noise pulses on the seismic system tape recording, found the accelerometer to not be responding in one of the three axis. The failed unit was returned, under warranty, to the supplier for repair. The supplier of the failed accelerometer is Kinemetrics/Systems 222 Vista Avenue Pasadena, CA 91107. The cause of the failure is unknown. No fai lure analysis was done at WNP-2 because of warranty considerations. At the time of the event, al1 oF the WNP-2 spare accelerometers were at the suppliers being re-spanned and no accelerometers were'vai lab'le to replace the failed unit. A accelerometer was received from the supplier, and it was installed on July 10, 1991; The system is now fully operational.

Very truly yours,

. Baker (H/0 927M)

WNP-2 Plant Manager cc: NRC Document Control Desk Hr. C, Sorenson,, NRC Resident Inspector (H/D 901A)

INPO Records Center Atlanta, GA Ms. DotLie Sherman, ANI Hr. D. L. Williams, BPA (H/D. 399)

NRC Resident Inspector Walkover Copy

(

C