p 4C CELE RATED D1FJBUT1 ON DE M ON STR+ON SYSTEM i'EGULATORY XNFORMATION DISTRXBUTION SYSTEM (RIDS)

ACCESSION NBR:8904050343 DOC.DATE: 89/03/22 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B. Region 5, Ofc of the Director

SUBJECT:

Special rept:on 890306,post-accident sampling primary coolant radiation monitor inoperable.

DISTRIBUTION CODE: AOOID TITLE: OR Submittal: General Distribution COPIES RECEIVED:LTR j ENCL + SIZE:

NOTES:

RECIPIENT COPIES COPXES ID PD5 LA CODE/NAME SAMWORTH,R 1'ECIPIENT LTTR ENCL 1

5 '

ID PD5 PD CODE/NAME LTTR ENCL INTERNAL: ACRS ARM/DAF/LFMB NRR/DEST/ADS 7E 1 NRR/DEST/CEB 8H NRR/DEST/ESB 8D 1 NRR/DEST/ICSB NRR/DEST/MTB 9H 1 NRR/DEST/RSB 8E NRR/DOEA/TSB 11 1 J)OC~BSTRA~

OGC/HDS2 1 EG FILE 01 RES/DS XR/EIB EXTERNAL: LPDR NRC PDR NSIC NOTE TO ALL "RIDS" RECIPIENIS'LEASE HELP US K) REMJCE WASTEl CXNZACZ 'lHE DOCUMEPZ COÃI$OL DESK ROOM Pl-37 (EXT. 20079) KO XLIMZLTE YOUR NAME FMM DICTION LISTS POR DOCUMEMIS YOU DCINIT NEZDf TOTAL NUMBER OF COPXES REQUIRED: LTTR 28 ENCL

~ .

I~ A

(.. ~

.2 ~

WASHINGTON PUBLIC POWER SUPPLY Sly SYSQRIVP M'lW 41

~ $

P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352

~ I ARZ7 A 9: P3 Docket No. 50-39/

March 22, 1989 Nr. J.B. Martin Regional Administrator USNRC, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Dear Hr. Martin:

SUBJECT:

NUCLEAR PLANT NO. 2 LICENSE NO. NPF-21 SPECIAL REPORT'OST-ACCIDENT SANPLING PRIHARY COOLANT RADIATION NONITOR

REFERENCE:

Letter, GC Sorensen (SS) to JB Hartin (NRC), "Special Report:

Post-Accident Sampling Containment Atmosphere Radiation Monitor,"

Dated February 16, 1989 This special report is submitted pursuant to the requirements of WNP-2 Technical Specification Table 3.3.7.5-1 (Instrument No. 29: Post Accident Sampling Primary Coolant Radiation Monitor), Action Statement 81.

Action Statement 81 requires, "with the number of operable accident monitoring instrumentation channels less than required by the minimum channels operable requirement, either restore the inoperable channel(s) to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or:

(a) Initiate the preplanned alternate method of monitoring the appropriate parameter(s), and (b) In lieu of any other report required by Specification 6.9.1 prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule For restoring the system to operable status."

8904050343 890322 PDR S

ADOCK 05000397 PDC

'yp/

0 r ~ y

~

~ ~y~ 1 II w

(,'I 'll Jfi ,t 1

PASS REPORT PAGE 2 In the referenced letter, the Supply System reported that Post Accident Samp-ling System (PASS) vacuum pump PSR-P-702 (Suppression Pool Atmospheric Sample Return) was inoperable and, as a result, Post Accident Sampling Containment Atmospheric Radiation Monitor PSR-RI-704 was unable to perform its function as required by the Technical Specifications. Also in the letter, the Supply System provided the plans and schedule For restoring the system to operable status and committed to provide an evaluation of the failure mode of the vacuum pump.

On March 6, 1989 as part of the repair efforts associated with PSR-P-702, it was necessary to remove the entire PASS from service and, as a result, the other Technical Specification instrument in the system (PSR-RI-665: Post Accident Sampling Primary Coolant Radiation Nonitor) was also not able to perform its required function.

In the event of an inoperable PASS during accident conditions, the alternate preplanned method for assessing core damage is Plant Procedure ( PPN) 9.3.22, "Core Damage Evaluation." Included in this procedure are evaluations of water level history, installed radiation monitor indication and hydrogen content in the containment atmosphere.

During the disassembly of PSR-P-702, water was discovered in the pump above the reed valve, which prevented the pump from establishing a vacuum (subsequent bench testing revealed that there were no mechanical problems with the pump). The PASS procedure requires purging Following pump operation to remove any moisture From the sample piping. However, due to a loose bulkhead fitting inside Sample Rack PSR-SR-06, there was insufficient flow available in the nitrogen purge supply line to adequately purge the water in the line.

Therefore, the excess moisture had 'settled in the pump.

Regarding restoring the system to operable status, PSR-P-702 was replaced with a new pump and the bulkhead fitting repai'red. Current plans are to have the system aligned, tested and returned to service by Narch 31, 1989.

Very truly yours, gal' C.M. Powers (M/D 927M)

WNP-2 Plant Manager cc: Mr. C.J. Bosted, NRC Site (N/0 901A)

Ns. Dottie Sherman, ANI Nr. D.L. Williams, BPA (N/D 399)

Document Control Desk, NRC

e' ill