Special Rept:On 930503,space Frame & Attached Seismic Triaxial Peak Accelorograph (SEIS-TPA-1) Removed to Allow for Refueling of Reactor Core.Instrument Returned to Svc on 930607
ML17290A530
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/11/1993
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO2-93-156, NUDOCS 9307270208
Download: ML17290A530 (3)


Text

ACCELERATED DOCUMENT DIST 'BUTION SYSTEM I REGULAT rcY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSIOV NBR
9307270208 DOC.DATE:'3/06/11 NOTARIZED: NO DOCKET N FAC;.L:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARR SH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION FAULKENBERRY,B. Region 5 (Post 820201)

SUBJECT:

Special rept:on 930503,space frame & attached seismic triaxial peak accelorograph (SEIS-TPA-1) removed to allow for refueling of reactor core. Instrument returned to svc on 930607.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV LA 1 1 PDV PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACNW 2 2 ACRS 2 2 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DSP 2 2 NRR/DE/EELB 1 1 NRR/DE/EMEB 1 1 NRR/DORS/OEAB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRIL/RPEB 1 1 NRR/DRSS/PRPB NRR/DSSA/SRXB RES/DSIR/EIB 2

1 1

2 1

1 G

RGN5

~D RE/~SSA/SPLB FILE 01 1

1 1

1 1

1 EXTERNAL: EG&G BRYCEiJ.H 2 2 L ST LOBBY WARD 1 1 NRC PDR 1 1 NSIC MURPHY,G.A 1 1 NSIC POOREiW. 1 1 NUDOCS FULL TXT 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL 32

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax 968 ~ 3000 George Wasbtngton Way ~ Richland, Wasbtngton 99352-0958'>> gd99) 372-5000 June 11, 1993 G02-93-156 Docket No. 50-397 Mr. B. H. Faulkenberry Regional Administrator US Nuclear Regulatory Commission Region V 1450 Maria Lane Walnut Creek, CA. 94596

Dear Mr. Faulkenberry:

Subject:

WNP-2, OPERATING LICENSE NO. NPF-21 SPECIAL REPORT: SEISMIC MONITORING INSTRUMENTATION

Reference:

Letter G02-93-062, dated March 18, 1993, JW Baker (SS) to JB Martin (NRC),

"Seismic Monitoring Instrumentation" This special report is submitted pursuant to the requirements of WNP-2 Technical Specification section 3.3.7.2 "Seismic Monitoring Instrumentation" which requires the instruments to be operable at all times, and in fulfillment of the commitment made in the referenced letter.

The seismic monitoring system has been designed and installed to record the response of Plant buildings and systems to ground motions produced by earthquakes. This information would be used by plant operators to immediately gauge the relative size of the event and, over the long term, to verify the performance of plant design.

The action statement for this specification requires that "with one or more of the above required seismic monitoring instruments inoperable for more than 30 days, in lieu of any other report required by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 10 days outlining the cause of the malfunction and the plans for restoring the instrument(s) to operable status."

t". 9 0 p r. ~

9307270208 PDR S

ADOCK 930hil 05000397 PDR p3f

Page Two SPECIAL REPORT: SEISMIC MONITORING INSTRUMENTATION On May 3, 1993, with the plant in Mode 4 (cold shutdown) during an annual refueling outage, the space frame and attached seismic Triaxial Peak Accelerograph (SEIS-TPA-1) were removed to allow for refueling of the reactor core. The space frame is a structural frame over the RPV head used to support RCIC piping, CRA ventilation ducting, RPV head/flange thermocouples, and one RPV level instrument sensing line. This seismic accelerometer is a mechanical device that is attached to the reactor space frame. It records peak acceleration by producin'g scratches on metal record plates. There are no alarms or automatic actuations produced by this instrument.

Tne location of this instrument requires its removal from service to allow for refueling of the reactor core. This occurs during our annual refueling outage and results in the Space Frame and SEIS-TPA-1 being removed for more than thirty days. Our procedures require notification of the Shift Manager and entry into the Seismic Monitoring System LCO when the space frame is removed. This special report has been prepared in response to the action statement for SEIS-TPA-1 being out of service for more than 30 days. This instrument was returned to service on June 7, 1993.

Sincerely,

~Pc@/NEW

.V. Parrish (Mail Drop 1023)

Assistant Managing Director, Operations CC: NRC Document Control Desk Mr. R. J. Barr, NRC Resident Inspector - (M/D 901A)

INPO Records Center - Atlanta, GA Ms. Dottie Sherman, ANI Mr. D. L. Williams, BPA (M/D 399