ML18101A192: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/30/1994
| issue date = 06/30/1994
| title = Corrected Monthly Operating Rept for June 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
| title = Corrected Monthly Operating Rept for June 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
| author name = MORRONI M
| author name = Morroni M
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:* CORRECTED COPY OPERATING DATA REPORT W Docket No: 50-311 Date: 07/10/94 Completed by: Mike Morroni Telephone:
{{#Wiki_filter:*         CORRECTED COPY OPERATING DATA REPORT W
339-2122 Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period June 1994 3. Licensed Thermal Power (MWt) 3411 4. Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 6. Maximum Dependable Capacity(Gross MWe) 1149 7. Maximum Dependable Capa9ity (Net MWe) 1106 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA 9. Power Level to Which Restricted, if any (Net MWe) -N/A 10. Reasons for Restrictions, if any N/A. This Month Year to Date Cumulative  
                                                        ~
: 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator on-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) Gross Elec. Energy Generated (MWH) 18. Net Elec. Energy Gen. (MWH) 19. Unit Service Factor 20. Unit Availability Factor 21. Unit Capacity Factor (using MDC Net) 22. Unit Capacity Factor (using DER Net) 23. Unit Forced Outage Rate 720 652.65 0 577.05 0 1846245.6 582860 551889 80.1 80.1 69.3 68.7 6.9 4343 111456 4198.68 73478.24 0 0 4039.3 70928.82 0 0 *11916470.4
Docket No:
*174379409.8 3837320 74383838 3650335 70777612 93 63.6 93 76 57.4 75.4 57 4.8 21.8 24. Shutdowns scheduled over next 6 months (type, date and duration of each) Refueling outage scheduled to start October 15. 1994 and last 60 days. 25. If shutdown at end of Report Period, Estimated Date of startup: NA 8-l-7.R2 ----I 9408260299 940818 PDR ADOCK 05000311 R PDR}}
Date:
50-311 07/10/94 Completed by:     Mike Morroni                         Telephone:   339-2122 Operating Status
: 1. Unit Name                           Salem No. 2     Notes
: 2. Reporting Period                 June       1994
: 3. Licensed Thermal Power (MWt)               3411
: 4. Nameplate Rating (Gross MWe)                 1170
: 5. Design Electrical Rating (Net MWe)         1115
: 6. Maximum Dependable Capacity(Gross MWe) 1149
: 7. Maximum Dependable Capa9ity (Net MWe) 1106
: 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason       NA
: 9. Power Level to Which Restricted, if any (Net MWe)             -N/A
: 10. Reasons for Restrictions, if any             N/A.
This Month     Year to Date     Cumulative
: 11. Hours in Reporting Period               720          4343        111456
: 12. No. of Hrs. Rx. was Critical             652.65        4198.68      73478.24
: 13. Reactor Reserve Shutdown Hrs.             0              0              0
: 14. Hours Generator on-Line                 577.05        4039.3        70928.82
: 15. Unit Reserve Shutdown Hours               0              0              0
: 16. Gross Thermal Energy Generated (MWH)                     1846245.6    *11916470.4    *174379409.8 Gross Elec. Energy Generated (MWH)                       582860        3837320      74383838
: 18. Net Elec. Energy Gen. (MWH)           551889        3650335      70777612
: 19. Unit Service Factor                     80.1            93          63.6
: 20. Unit Availability Factor                 80.1            93          63~6
: 21. Unit Capacity Factor (using MDC Net)                   69.3            76          57.4
: 22. Unit Capacity Factor (using DER Net)                   68.7          75.4          57
: 23. Unit Forced Outage Rate                   6.9             4.8         21.8
: 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
Refueling outage scheduled to start October 15. 1994 and last 60 days.
: 25. If shutdown at end of Report Period, Estimated Date of startup:
NA 8-l-7.R2
(~    ----                 ~
I     9408260299 940818 PDR   ADOCK 05000311 R               PDR}}

Latest revision as of 10:22, 21 October 2019

Corrected Monthly Operating Rept for June 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
ML18101A192
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/30/1994
From: Morroni M
Public Service Enterprise Group
To:
Shared Package
ML18101A190 List:
References
NUDOCS 9408260299
Download: ML18101A192 (1)


Text

  • CORRECTED COPY OPERATING DATA REPORT W

~

Docket No:

Date:

50-311 07/10/94 Completed by: Mike Morroni Telephone: 339-2122 Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period June 1994
3. Licensed Thermal Power (MWt) 3411
4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) 1115
6. Maximum Dependable Capacity(Gross MWe) 1149
7. Maximum Dependable Capa9ity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA
9. Power Level to Which Restricted, if any (Net MWe) -N/A
10. Reasons for Restrictions, if any N/A.

This Month Year to Date Cumulative

11. Hours in Reporting Period 720 4343 111456
12. No. of Hrs. Rx. was Critical 652.65 4198.68 73478.24
13. Reactor Reserve Shutdown Hrs. 0 0 0
14. Hours Generator on-Line 577.05 4039.3 70928.82
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1846245.6 *11916470.4 *174379409.8 Gross Elec. Energy Generated (MWH) 582860 3837320 74383838
18. Net Elec. Energy Gen. (MWH) 551889 3650335 70777612
19. Unit Service Factor 80.1 93 63.6
20. Unit Availability Factor 80.1 93 63~6
21. Unit Capacity Factor (using MDC Net) 69.3 76 57.4
22. Unit Capacity Factor (using DER Net) 68.7 75.4 57
23. Unit Forced Outage Rate 6.9 4.8 21.8
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

Refueling outage scheduled to start October 15. 1994 and last 60 days.

25. If shutdown at end of Report Period, Estimated Date of startup:

NA 8-l-7.R2

(~ ---- ~

I 9408260299 940818 PDR ADOCK 05000311 R PDR