Line 3: Line 3:
| issue date = 07/31/1994
| issue date = 07/31/1994
| title = Corrected Monthly Operating Rept for Jul 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
| title = Corrected Monthly Operating Rept for Jul 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
| author name = MORRONI M
| author name = Morroni M
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CORRECTED COPY ,., OPERATING DATA REPORT Docket No: Date: Completed by: Mike Morroni Telephone:
{{#Wiki_filter:~          CORRECTED COPY     ~
Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period July 1994 3. Licensed Thermal Power {MWt) 3411 4. Nameplate Rating {Gross MWe) 1170 5. Design Electrical Rating {Net MWe) 1115 6. Maximum Dependable Capacity{Gross MWe) 1149 7. Maximum Dependable Capacity {Net MWe) 1106 8. If Changes Occur in Capacity Ratings {items 3 through 7) Report, Give Reason NA 9. Power Level to Which Restricted, if any {Net MWe) 10. Reasons for Restrictions, if any 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated  
                        ,.,   OPERATING DATA REPORT ~
{MWH) Gross Elec. Energy Generated  
Docket No:   50-311 Date:         08/10/94 Completed by:     Mike Morroni                       Telephone:   339-2122 Operating Status
{MWH) 18. Net Elec. Energy Gen. {MWH) 19. Unit Service Factor 20. Unit Availability Factor 21. Unit capacity Factor {using MDC Net) 22. Unit Capacity Factor {using DER Net) 23. Unit Forced Outage Rate N/A. This Month 744 525.08 0 477.77 0 1582257.6 495560 466128 64.2 64.2 56.6 56.2 35.8 Year to Date 5087 4723.76 0 4517.07 0 *13498728.0 4332880 4116463 88.8 88.8 73.2 72.6 9.4 50-311 08/10/94 339-2122 since Last N/A Cumulative 112200 74003.32 0 71406.59 0 *175961667.4 74879398 71243740 63.6 63.6 57.4 56.9 21.9 24. Shutdowns scheduled over next 6 months {type, date and duration of each) Refueling outage scheduled to start October 15. 1994 and last 60 da s. 25. If shutdown at end of Report Period, Estimated Date of Startup: 8-1-7.R2 NA 9408260301 940818 PDR ADOCK 05000311 R PDR}}
: 1. Unit Name                           Salem No. 2     Notes
: 2. Reporting Period                 July       1994
: 3. Licensed Thermal Power {MWt)                 3411
: 4. Nameplate Rating {Gross MWe)                 1170
: 5. Design Electrical Rating {Net MWe)           1115
: 6. Maximum Dependable Capacity{Gross MWe) 1149
: 7. Maximum Dependable Capacity {Net MWe) 1106
: 8. If Changes Occur in Capacity Ratings {items 3 through 7) since Last Report, Give Reason       NA
: 9. Power Level to Which Restricted, if any {Net MWe)             N/A
: 10. Reasons for Restrictions, if any             N/A.
This Month    Year to Date    Cumulative
: 11. Hours in Reporting Period               744          5087        112200
: 12. No. of Hrs. Rx. was Critical             525.08      4723.76      74003.32
: 13. Reactor Reserve Shutdown Hrs.             0              0            0
: 14. Hours Generator On-Line                 477.77      4517.07      71406.59
: 15. Unit Reserve Shutdown Hours               0              0            0
: 16. Gross Thermal Energy Generated
{MWH)                     1582257.6    *13498728.0  *175961667.4 Gross Elec. Energy Generated
{MWH)                       495560      4332880      74879398
: 18. Net Elec. Energy Gen. {MWH)           466128      4116463      71243740
: 19. Unit Service Factor                     64.2        88.8            63.6
: 20. Unit Availability Factor                 64.2        88.8            63.6
: 21. Unit capacity Factor
{using MDC Net)                     56.6        73.2            57.4
: 22. Unit Capacity Factor
{using DER Net)                     56.2          72.6          56.9
: 23. Unit Forced Outage Rate                 35.8           9.4         21.9
: 24. Shutdowns scheduled over next 6 months {type, date and duration of each)
Refueling outage scheduled to start October 15. 1994 and last 60 da s.
: 25. If shutdown at end of Report Period, Estimated Date of Startup:
NA 8-1-7.R2 9408260301 940818 PDR   ADOCK 05000311 R               PDR}}

Latest revision as of 10:22, 21 October 2019

Corrected Monthly Operating Rept for Jul 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value
ML18101A193
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/31/1994
From: Morroni M
Public Service Enterprise Group
To:
Shared Package
ML18101A190 List:
References
NUDOCS 9408260301
Download: ML18101A193 (1)


Text

~ CORRECTED COPY ~

,., OPERATING DATA REPORT ~

Docket No: 50-311 Date: 08/10/94 Completed by: Mike Morroni Telephone: 339-2122 Operating Status

1. Unit Name Salem No. 2 Notes
2. Reporting Period July 1994
3. Licensed Thermal Power {MWt) 3411
4. Nameplate Rating {Gross MWe) 1170
5. Design Electrical Rating {Net MWe) 1115
6. Maximum Dependable Capacity{Gross MWe) 1149
7. Maximum Dependable Capacity {Net MWe) 1106
8. If Changes Occur in Capacity Ratings {items 3 through 7) since Last Report, Give Reason NA
9. Power Level to Which Restricted, if any {Net MWe) N/A
10. Reasons for Restrictions, if any N/A.

This Month Year to Date Cumulative

11. Hours in Reporting Period 744 5087 112200
12. No. of Hrs. Rx. was Critical 525.08 4723.76 74003.32
13. Reactor Reserve Shutdown Hrs. 0 0 0
14. Hours Generator On-Line 477.77 4517.07 71406.59
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated

{MWH) 1582257.6 *13498728.0 *175961667.4 Gross Elec. Energy Generated

{MWH) 495560 4332880 74879398

18. Net Elec. Energy Gen. {MWH) 466128 4116463 71243740
19. Unit Service Factor 64.2 88.8 63.6
20. Unit Availability Factor 64.2 88.8 63.6
21. Unit capacity Factor

{using MDC Net) 56.6 73.2 57.4

22. Unit Capacity Factor

{using DER Net) 56.2 72.6 56.9

23. Unit Forced Outage Rate 35.8 9.4 21.9
24. Shutdowns scheduled over next 6 months {type, date and duration of each)

Refueling outage scheduled to start October 15. 1994 and last 60 da s.

25. If shutdown at end of Report Period, Estimated Date of Startup: