ML18101A193: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 07/31/1994 | | issue date = 07/31/1994 | ||
| title = Corrected Monthly Operating Rept for Jul 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value | | title = Corrected Monthly Operating Rept for Jul 1994 for Salem Generating Station Unit 2,correcting Gross Thermal Energy Value | ||
| author name = | | author name = Morroni M | ||
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | | author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY | ||
| addressee name = | | addressee name = | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CORRECTED COPY ,., OPERATING DATA REPORT Docket No: Date: Completed by: Mike Morroni Telephone: | {{#Wiki_filter:~ CORRECTED COPY ~ | ||
Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period July 1994 3. Licensed Thermal Power {MWt) 3411 4. Nameplate Rating {Gross MWe) 1170 5. Design Electrical Rating {Net MWe) 1115 6. Maximum Dependable Capacity{Gross MWe) 1149 7. Maximum Dependable Capacity {Net MWe) 1106 8. If Changes Occur in Capacity Ratings {items 3 through 7) Report, Give Reason NA 9. Power Level to Which Restricted, if any {Net MWe) 10. Reasons for Restrictions, if any 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated | ,., OPERATING DATA REPORT ~ | ||
{MWH) Gross Elec. Energy Generated | Docket No: 50-311 Date: 08/10/94 Completed by: Mike Morroni Telephone: 339-2122 Operating Status | ||
{MWH) 18. Net Elec. Energy Gen. {MWH) 19. Unit Service Factor 20. Unit Availability Factor 21. Unit capacity Factor {using MDC Net) 22. Unit Capacity Factor {using DER Net) 23. Unit Forced Outage Rate | : 1. Unit Name Salem No. 2 Notes | ||
: 2. Reporting Period July 1994 | |||
: 3. Licensed Thermal Power {MWt) 3411 | |||
: 4. Nameplate Rating {Gross MWe) 1170 | |||
: 5. Design Electrical Rating {Net MWe) 1115 | |||
: 6. Maximum Dependable Capacity{Gross MWe) 1149 | |||
: 7. Maximum Dependable Capacity {Net MWe) 1106 | |||
: 8. If Changes Occur in Capacity Ratings {items 3 through 7) since Last Report, Give Reason NA | |||
: 9. Power Level to Which Restricted, if any {Net MWe) N/A | |||
: 10. Reasons for Restrictions, if any N/A. | |||
This Month Year to Date Cumulative | |||
: 11. Hours in Reporting Period 744 5087 112200 | |||
: 12. No. of Hrs. Rx. was Critical 525.08 4723.76 74003.32 | |||
: 13. Reactor Reserve Shutdown Hrs. 0 0 0 | |||
: 14. Hours Generator On-Line 477.77 4517.07 71406.59 | |||
: 15. Unit Reserve Shutdown Hours 0 0 0 | |||
: 16. Gross Thermal Energy Generated | |||
{MWH) 1582257.6 *13498728.0 *175961667.4 Gross Elec. Energy Generated | |||
{MWH) 495560 4332880 74879398 | |||
: 18. Net Elec. Energy Gen. {MWH) 466128 4116463 71243740 | |||
: 19. Unit Service Factor 64.2 88.8 63.6 | |||
: 20. Unit Availability Factor 64.2 88.8 63.6 | |||
: 21. Unit capacity Factor | |||
{using MDC Net) 56.6 73.2 57.4 | |||
: 22. Unit Capacity Factor | |||
{using DER Net) 56.2 72.6 56.9 | |||
: 23. Unit Forced Outage Rate 35.8 9.4 21.9 | |||
: 24. Shutdowns scheduled over next 6 months {type, date and duration of each) | |||
Refueling outage scheduled to start October 15. 1994 and last 60 da s. | |||
: 25. If shutdown at end of Report Period, Estimated Date of Startup: | |||
NA 8-1-7.R2 9408260301 940818 PDR ADOCK 05000311 R PDR}} |
Latest revision as of 10:22, 21 October 2019
ML18101A193 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 07/31/1994 |
From: | Morroni M Public Service Enterprise Group |
To: | |
Shared Package | |
ML18101A190 | List: |
References | |
NUDOCS 9408260301 | |
Download: ML18101A193 (1) | |
Text
~ CORRECTED COPY ~
,., OPERATING DATA REPORT ~
Docket No: 50-311 Date: 08/10/94 Completed by: Mike Morroni Telephone: 339-2122 Operating Status
- 1. Unit Name Salem No. 2 Notes
- 2. Reporting Period July 1994
- 3. Licensed Thermal Power {MWt) 3411
- 4. Nameplate Rating {Gross MWe) 1170
- 5. Design Electrical Rating {Net MWe) 1115
- 6. Maximum Dependable Capacity{Gross MWe) 1149
- 7. Maximum Dependable Capacity {Net MWe) 1106
- 8. If Changes Occur in Capacity Ratings {items 3 through 7) since Last Report, Give Reason NA
- 9. Power Level to Which Restricted, if any {Net MWe) N/A
- 10. Reasons for Restrictions, if any N/A.
This Month Year to Date Cumulative
- 11. Hours in Reporting Period 744 5087 112200
- 12. No. of Hrs. Rx. was Critical 525.08 4723.76 74003.32
- 13. Reactor Reserve Shutdown Hrs. 0 0 0
- 14. Hours Generator On-Line 477.77 4517.07 71406.59
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated
{MWH) 1582257.6 *13498728.0 *175961667.4 Gross Elec. Energy Generated
{MWH) 495560 4332880 74879398
- 18. Net Elec. Energy Gen. {MWH) 466128 4116463 71243740
- 19. Unit Service Factor 64.2 88.8 63.6
- 20. Unit Availability Factor 64.2 88.8 63.6
- 21. Unit capacity Factor
{using MDC Net) 56.6 73.2 57.4
- 22. Unit Capacity Factor
{using DER Net) 56.2 72.6 56.9
- 23. Unit Forced Outage Rate 35.8 9.4 21.9
- 24. Shutdowns scheduled over next 6 months {type, date and duration of each)
Refueling outage scheduled to start October 15. 1994 and last 60 da s.
- 25. If shutdown at end of Report Period, Estimated Date of Startup: