{{#Wiki_filter:e TS 6.4-4 D. All procedures described in A and B above shall be followed.
{{#Wiki_filter:e             TS 6.4-4 D. All procedures described in A and B above shall be followed.
E. Temporary changes to procedures described in A and B above which do not change the intent of the original procedure may be made, provided such changes are approved prior to implementation by the persons signated below based on the type of procedure to be changed: 1. Administrative
E. Temporary changes to procedures described in A and B above which do not change the intent of the original procedure may be made, provided such changes are approved prior to implementation by the persons de-signated below based on the type of procedure to be changed:
: 2. Abnormal 3. Annunciator
: 1. Administrative               Cognizant Supervisor
: 4. Health Physics 5. Emergency
: 2. Abnormal                     Shift Supervisor or Assistant Shift Supervisor
: 6. Maintenance
: 3. Annunciator                  Shift Supervisor or Assistant Shift Supervisor
: 7. Operating
: 4. Health Physics                *Assistant HP Supervisor or Health Physicists
: 8. Periodic Test 9. Start-up Test 10. Special Test 11. Quality Assurance
: 5. Emergency                    Shift Supervisor or Assistant Shift Supervisor
: 12. Chemistry Cognizant Supervisor Shift Supervisor or Assistant Shift Supervisor Shift Supervisor or Assistant Shift Supervisor  
: 6. Maintenance                  *Cognizant Supervisor
*Assistant HP Supervisor or Health Physicists Shift Supervisor or Assistant Shift Supervisor  
: 7. Operating                    Shift Supervisor or Assistant Shift Supervisor
*Cognizant Supervisor Shift Supervisor or Assistant Shift Supervisor  
: 8. Periodic Test                *Cognizant Supervisor
*Cognizant Supervisor  
: 9. Start-up Test                *Engineering Supervisor
*Engineering Supervisor  
: 10. Special Test                  *Engineering Supervisor
*Engineering Supervisor Manager Quality Assurance or Supervisor Quality Control, O&M *Chemist *These procedures must have the approval of a licensed Senior Reactor Operator.
: 11. Quality Assurance            Manager Quality Assurance or Supervisor Quality Control, O&M
Such changes will be documented and subsequently reviewed by the Station Nuclear Safety and Operating Committee and approved by the Station Manager within fourteen days. 8208120289 820809 PDR ADOCK 05000280 P PDR}}
: 12. Chemistry                    *Chemist
      *These procedures must have the approval of a licensed Senior Reactor Operator.
Such changes will be documented and subsequently reviewed by the Station Nuclear Safety and Operating Committee and approved by the Station Manager within fourteen days.
8208120289 820809 PDR ADOCK 05000280 P               PDR}}

Latest revision as of 03:02, 21 October 2019

Proposed Tech Spec 6.4.E.4 Re Assistant Health Physics Supervisor or Health Physicist
ML18139B992
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/09/1982
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B991 List:
References
NUDOCS 8208120289
Download: ML18139B992 (1)


Text

e TS 6.4-4 D. All procedures described in A and B above shall be followed.

E. Temporary changes to procedures described in A and B above which do not change the intent of the original procedure may be made, provided such changes are approved prior to implementation by the persons de-signated below based on the type of procedure to be changed:

1. Administrative Cognizant Supervisor
2. Abnormal Shift Supervisor or Assistant Shift Supervisor
3. Annunciator Shift Supervisor or Assistant Shift Supervisor
4. Health Physics *Assistant HP Supervisor or Health Physicists
5. Emergency Shift Supervisor or Assistant Shift Supervisor
6. Maintenance *Cognizant Supervisor
7. Operating Shift Supervisor or Assistant Shift Supervisor
8. Periodic Test *Cognizant Supervisor
9. Start-up Test *Engineering Supervisor
10. Special Test *Engineering Supervisor
11. Quality Assurance Manager Quality Assurance or Supervisor Quality Control, O&M
12. Chemistry *Chemist
  • These procedures must have the approval of a licensed Senior Reactor Operator.

Such changes will be documented and subsequently reviewed by the Station Nuclear Safety and Operating Committee and approved by the Station Manager within fourteen days.

8208120289 820809 PDR ADOCK 05000280 P PDR