ML18230B033: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UA.NUCL,EAR REGULATORY C ISSION NA,C FORM 195 IZ-TSI.I I.NRC DISTRIBUTION FGR PART 60 DOCKET MATERIAL TOI Mr.Edson G.Case N.C.Dept.of.Cultural Resources FROM: Raleigh, N;C.~27611 Larry E.Tise OATS OF OOCLIMENT 09/02/77 OATE RECEIVEO 09/09/77 I ETTER ABORIGINAL C}coPY 0 NOTOR I 2E 0 ABVNCLASSIFIED PROP INPUT FORM NUMSER OF COPIES RECEIVEO OESCRIPT ION Requesting up-to-date account of the measures taken to insure project (Amend.66 Uni 1, 2, 3, G 4)willnnot have an adverse-effect significant archeological resources...
{{#Wiki_filter:NA,C FORM 195                                                          UA. NUCL,EAR REGULATORY C   ISSION IZ-TSI. I I.
g]N%lLPjgGEQ gp ENCCOSURE s DO g)T RglloYgi PLANT NAME SHEARON HARRIS UNITS 1 p 2 p 3'p G'jcm 09/13/77 Or P AS<M Nir FOR ACTION/INFORMATION ASSIGNED AD BRANCH CHIEF.ENVIRlINMENTAL V~MOORE" LTR CT MANAGER: EN ING ASS'XSTANT.
NRC DISTRIBUTION FGR PART 60 DOCKET MATERIAL TOI Mr. Edson G. Case                                       FROM:                                          OATS OF OOCLIMENT N. C. Dept. of. Cultural Resources               09/02/77 Raleigh, N; C. 27611  ~
B~HARLE INTERNAL DISTRI BUTION-, PRO JECT MANAGER.Z.C LICENSING ASSISTAN SS STFM" SAFETY TTSO PLANT SYSTEMS TEDESCO SITE SAFETY 8c ENVIRON ANALYSIS DENTON 6 MULLER ENGINEERING.
OATE RECEIVEO Larry E. Tise                                     09/09/77 ABORIGINAL I ETTER                 0 NOTOR I 2E 0                   PROP                       INPUT FORM           NUMSER OF COPIES RECEIVEO ABVNCLASSIFIED C}coPY OESCRIPT ION Requesting up-to-date account of the ENCCOSURE measures     taken to insure project (Amend.66 Uni s 1, 2, 3,     G 4) willnnot have       an adverse-effect significant archeological           resources...
IPPOLITO ENVIRO TECH PERA G'EACTORS'B ZY'XTERNAL OISTR!BUTION GAMMILL 2 SITE ANALYSIS'VO~~BUNCH J~COLLDIS CONTROL NUMBER 5 CYS ACRS SENT CA GO Y NRC FORM'ISS (2 Vd)NSIC/rg<g..4>~~7i j I IU 1 NOl7IR QIROLINK.DERl7f ttIENT OF CULTURAL PE'.CUKES Raleigh.North Carolina 27611 SeptemHe&k3497'II
g ]N%lLPjgGEQ                             gp DO   g)T RglloYgi SHEARON HARRIS UNITS 1 p                 2   3'p G' PLANT NAME                                                    p jcm 09/13/77 Or   P   AS<     M Nir                             FOR ACTION/INFORMATION                     ENVIRlINMENTAL
)u/it II$Q>'~)'g(('," (Mr.Edson G.Case, Acting Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555
                                                                                                                    "
ASSIGNED AD       V~ MOORE     LTR BRANCH CHIEF.
CT MANAGER:                                                           PRO JECT MANAGER. Z. C EN ING ASS'XSTANT.                                                       LICENSING ASSISTAN B~ HARLESS INTERNALDISTRI BUTION-,
                                                          "
STFM           SAFETY                   PLANT SYSTEMS             SITE SAFETY 8c TTSO                                TEDESCO                      ENVIRON ANALYSIS DENTON 6 MULLER ENGINEERING.                             IPPOLITO ENVIRO TECH PERA   G'EACTORS'B GAMMILL         2 SITE ANALYSIS' VO~~
BUNCH ZY'XTERNAL                                                      J~ COLLDIS OISTR!BUTION                                        CONTROL NUMBER NSIC                                                                                         /
rg<g..4 >~~7i           j 5 CYS ACRS SENT CA        GO    Y                                                                                  I NRC FORM 'ISS (2 Vd)


==Dear Mr.Case:==
IU 1 NOl7IR QIROLINK.
I uPII'e have received copies of Amendment No.66 to the license application for the Shearon Harris Nuclear Power Plant, Units 1, 2, 3 and 4, sub-mitted by Carolina Power and Light.This Environmental Report amend-ment refers to, among other things, an impoundment to receive water from proposed cooling towers.O'Nision of.Archives ond History Lony E, Tise.Director We have examined the records in this office, and find that the review statuscf this project with respect to archeological resources is unclear.T.would appreciate it if you could provide us with an up-to-.date account of the measures taken to insure that this project will not have an adverse effect on significant archeological resources.
DERl7f ttIENT OF CULTURAL              SeptemHe&k3497'II ) u/it II $ Q>'~)'g(('," (
We would specifically like to see any reports on the assessment of impact to these resources that describe any archeological surveys, testing, or excavation of archeological sites that may be located in the project area.We will appreciate receiving your response at your earliest possible convenience.
I PE'.CUKES              Mr. Edson G. Case, Acting Director                    uPII'e Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Raleigh.              Washington, D.C. 20555 North Carolina 27611                 
Thank you for your cooperation.
 
Please send the necessary update to the attention of Ms.Kathleen Pepi, Environmental Review Supervisor.
==Dear Mr. Case:==
Si cerely, arry.Tuse State Historic Preservation Officer LET:sw Sara W.Hodgkins.Secretary James 8.Hunt.Jr..Governor cc: Mr.M.A.McDuffie, Senior Vice President Engineering and Construction, Carolina Power and Light, Raleigh, N.C.Carolyn Anderson, Scientist Carolina Power and Light, Raleigh, N.C.Mr.Michael Corkran, Archeologist U.S.Army Corps of Engineers, Wilmington, N C.
 
p<c~iv-v o>"-U"'"-f~~lh c]q(($)p 9 plh l2 0~~t~'U 4}}
have received copies of Amendment No. 66 to the license application for the Shearon Harris Nuclear Power Plant, Units 1, 2, 3 and 4, sub-mitted by Carolina Power and Light. This Environmental Report amend-ment refers to, among other things, an impoundment to receive water from proposed cooling towers.
O'Nision of           We have examined the records     in this office, and find that the review
. Archives ond History  statuscf this project with respect to archeological resources is Lony E, Tise. Director unclear. T. would appreciate   it if     you could provide us with an up-to-.date account of the measures taken to insure that this project will not have an adverse effect on significant archeological resources.
We would specifically like to see any reports on the assessment           of impact to these resources that describe any archeological surveys, testing, or excavation of archeological sites that may be located in the project area.
We will appreciate receiving your response at your earliest possible convenience. Thank you for your cooperation. Please send the necessary update to the attention of Ms. Kathleen Pepi, Environmental Review Supervisor.
Si cerely, arry . Tuse State Historic Preservation Officer LET:sw cc:   Mr. M. A. McDuffie, Senior Vice President Sara W. Hodgkins.            Engineering and Construction, Carolina Secretary                    Power and Light, Raleigh, N.C.
James 8. Hunt. Jr..
Governor                    Carolyn Anderson, Scientist Carolina Power and Light, Raleigh, N.C.
Mr. Michael Corkran, Archeologist U.S. Army Corps of Engineers, Wilmington,               N C.
 
c p<c~ iv-v o>"-U"'"-f~~         lh
                                      ~ t
]q(( $ )p 9     plh l2   0~
                                '
                              ~
U 4}}

Revision as of 17:18, 20 October 2019

Amendment No. 66 to License Application Referring to an Impoundment to Receive Water from Proposed Cooling Towers
ML18230B033
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 09/02/1977
From: Tise L
State of NC, Dept of Cultural Resources, State Historic Preservation Office
To: Case E
Office of Nuclear Reactor Regulation
References
Download: ML18230B033 (4)


Text

NA,C FORM 195 UA. NUCL,EAR REGULATORY C ISSION IZ-TSI. I I.

NRC DISTRIBUTION FGR PART 60 DOCKET MATERIAL TOI Mr. Edson G. Case FROM: OATS OF OOCLIMENT N. C. Dept. of. Cultural Resources 09/02/77 Raleigh, N; C. 27611 ~

OATE RECEIVEO Larry E. Tise 09/09/77 ABORIGINAL I ETTER 0 NOTOR I 2E 0 PROP INPUT FORM NUMSER OF COPIES RECEIVEO ABVNCLASSIFIED C}coPY OESCRIPT ION Requesting up-to-date account of the ENCCOSURE measures taken to insure project (Amend.66 Uni s 1, 2, 3, G 4) willnnot have an adverse-effect significant archeological resources...

g ]N%lLPjgGEQ gp DO g)T RglloYgi SHEARON HARRIS UNITS 1 p 2 3'p G' PLANT NAME p jcm 09/13/77 Or P AS< M Nir FOR ACTION/INFORMATION ENVIRlINMENTAL

"

ASSIGNED AD V~ MOORE LTR BRANCH CHIEF.

CT MANAGER: PRO JECT MANAGER. Z. C EN ING ASS'XSTANT. LICENSING ASSISTAN B~ HARLESS INTERNALDISTRI BUTION-,

"

STFM SAFETY PLANT SYSTEMS SITE SAFETY 8c TTSO TEDESCO ENVIRON ANALYSIS DENTON 6 MULLER ENGINEERING. IPPOLITO ENVIRO TECH PERA G'EACTORS'B GAMMILL 2 SITE ANALYSIS' VO~~

BUNCH ZY'XTERNAL J~ COLLDIS OISTR!BUTION CONTROL NUMBER NSIC /

rg<g..4 >~~7i j 5 CYS ACRS SENT CA GO Y I NRC FORM 'ISS (2 Vd)

IU 1 NOl7IR QIROLINK.

DERl7f ttIENT OF CULTURAL SeptemHe&k3497'II ) u/it II $ Q>'~)'g(('," (

I PE'.CUKES Mr. Edson G. Case, Acting Director uPII'e Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Raleigh. Washington, D.C. 20555 North Carolina 27611

Dear Mr. Case:

have received copies of Amendment No. 66 to the license application for the Shearon Harris Nuclear Power Plant, Units 1, 2, 3 and 4, sub-mitted by Carolina Power and Light. This Environmental Report amend-ment refers to, among other things, an impoundment to receive water from proposed cooling towers.

O'Nision of We have examined the records in this office, and find that the review

. Archives ond History statuscf this project with respect to archeological resources is Lony E, Tise. Director unclear. T. would appreciate it if you could provide us with an up-to-.date account of the measures taken to insure that this project will not have an adverse effect on significant archeological resources.

We would specifically like to see any reports on the assessment of impact to these resources that describe any archeological surveys, testing, or excavation of archeological sites that may be located in the project area.

We will appreciate receiving your response at your earliest possible convenience. Thank you for your cooperation. Please send the necessary update to the attention of Ms. Kathleen Pepi, Environmental Review Supervisor.

Si cerely, arry . Tuse State Historic Preservation Officer LET:sw cc: Mr. M. A. McDuffie, Senior Vice President Sara W. Hodgkins. Engineering and Construction, Carolina Secretary Power and Light, Raleigh, N.C.

James 8. Hunt. Jr..

Governor Carolyn Anderson, Scientist Carolina Power and Light, Raleigh, N.C.

Mr. Michael Corkran, Archeologist U.S. Army Corps of Engineers, Wilmington, N C.

c p<c~ iv-v o>"-U"'"-f~~ lh