{{#Wiki_filter:July 29, 2019 Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, Inc.
{{#Wiki_filter:uly 29, 2019


Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 SUBJECT: PALISADES NUCLEAR PLANT-INFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE INSPECTION; INSPECTION REPORT 05000255/2019011
==SUBJECT:==
PALISADES NUCLEAR PLANTINFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59)
BASELINE INSPECTION; INSPECTION REPORT 05000255/2019011


==Dear Arnone:==
==Dear Arnone:==
On October 28, 2019 , the U.S. Nuclear Regulatory Commission (NRC) will begin a 50.59 Baseline Inspection at the Palisades Nuclear Plant. This inspection will be performed in accordance with the NRC baseline Inspection Procedure 71111.17 T. The onsite portion of th e inspection will take place during the week of Octob er 28, 2019. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.
On October 28, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a 50.59 Baseline Inspection at the Palisades Nuclear Plant. This inspection will be performed in accordance with the NRC baseline Inspection Procedure 71111.17T. The onsite portion of the inspection will take place during the week of October 28, 2019.


The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via CD and delivered to the regional office no later than September 16, 2019.
Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.


The inspection team will review this information and, by September 30, 2019, will request specific items that should be provided for review in the regional office by October 14, 2019.
* The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via CD and delivered to the regional office no later than September 16, 2019. The inspection team will review this information and, by September 30, 2019, will request specific items that should be provided for review in the regional office by October 14, 2019.


The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within Group II (i.e., Item (1)), will be requested for review in the regional office prior to the inspection by October 14, 2019, as identified above.
* The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within Group II (i.e., Item (1)), will be requested for review in the regional office prior to the inspection by October 14, 2019, as identified above. The remaining documents should be available by the first day of the onsite inspection, October 28, 2019.


The remaining documents should be available by the first day of the onsite inspection, October 28, 2019.
* The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.


The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
C. Arnone  -2-The lead inspector for this inspection is Mr. Dariusz Szwarc. We understand that our regulatory contact for this inspection is Ms. Barb Dotson of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov.


C. Arnone -2- The lead inspector for this inspection is Mr. Dariusz Szwarc. We understand that our regulatory contact for this inspection is Ms. Barb Dotson of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
 
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely,
Sincerely,
Line 43: Line 46:
Document Request for 50.59 Inspection cc: Distribution via LISTSERV
Document Request for 50.59 Inspection cc: Distribution via LISTSERV


C. Arnone -3- Letter to Charles Arnone from Dariusz Szwarc dated July 29, 2019. SUBJECT: PALISADES NUCLEAR PLANT-INFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE INSPECTION; INSPECTION REPORT 05000255/2019011 DISTRIBUTION
C. Arnone   -3-Letter to Charles Arnone from Dariusz Szwarc dated July 29, 2019.
: Douglas Dodson RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Darrell Roberts John Giessner Jamnes Cameron Allan Barker DRPIII DRSIII ADAMS Accession Number: ML19210D402 OFFICE RIII NAME ADahbur for DSzwarc:cl DATE 07/29/19 OFFICIAL RECORD COPY
 
SUBJECT: PALISADES NUCLEAR PLANTINFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59)
BASELINE INSPECTION; INSPECTION REPORT 05000255/2019011 DISTRIBUTION:
Douglas Dodson RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Darrell Roberts John Giessner Jamnes Cameron Allan Barker DRPIII DRSIII ADAMS Accession Number: ML19210D402 OFFICE RIII NAME ADahbur for DSzwarc:cl DATE 07/29/19 OFFICIAL RECORD COPY
 
DOCUMENT REQUEST FOR 50.59 INSPECTION Inspection Report:  05000255/2019011 Inspection Dates:  October 28, 2019, through November 1, 2019 Inspection Procedure: 71111.17T, Evaluations of Changes, Tests, and Experiments Lead Inspector:  Dariusz Szwarc 630-829-9803 Dariusz.Szwarc@nrc.gov I. Information Requested for In-Office Preparation Week The following information is requested by September 16, 2019, or sooner, to facilitate the selection of specific items that will be reviewed during the onsite inspection week.


DOCUMENT REQUEST FOR 50.59 INSPECTION Enclosure Inspection Report
The inspection team will select specific items from the information requested below and submit a list to your staff by September 30, 2019. We will request that certain items be made available to the regional office prior to the inspection by October 14, 2019. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should identify the associated system and cover the time frame from the receipt of information for the last MOD/50.59 inspection to the present.
: 05000 255/20 1 9011 Inspection Dates
: October 28, 2019, through November 1 , 2019 Inspection Procedure
: 71111.17 T , "Evaluation s of Changes, Tests, and Experiments
" Lead Inspector
: Dariusz Szwarc 630-829-9803 Dariusz.Szwarc@nrc.gov I. Information Requested for In-Office Preparation Week The following information is requested by September 16, 2019, or sooner, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspection team will select specific items from the information requested below and submit a list to your staff by September 30, 2019. We will request that certain items be made available to the regional office prior to the inspection by October 14, 2019. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should identify the associated system and cover the time frame from the receipt of information for the last MOD/50.59 inspection to the present.


The required information identified below should be provided on CD. Please provide three copies of each CD submitted (i.e., one for each inspector). The preferred file format is a searchable "pdf" file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible.
The required information identified below should be provided on CD. Please provide three copies of each CD submitted (i.e., one for each inspector). The preferred file format is a searchable pdf file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If you have any questions regarding this information, please call the inspection team leader as soon as possible.


If you have any questions regarding this information, please call the inspection team leader as soon as possible.
(1) List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59 completed evaluations involving (a) calculations, (b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine operating configurations, or (e) departures in methods of analyses. This list should include 50.59 evaluations for the following:
a. Changes that have been made under the provisions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4) since the last MOD/50.59 inspection; b. Modifications that are field work complete; and c. Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior U.S. Nuclear Regulatory Commission approval was sought and obtained.


(1) List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59 completed evaluations involving (a)
Enclosure
calculations, (b)
procedure revisions, (c) changes to the facility (modifications), (d)
non-routine operating configurations, or (e)
departures in methods of analyses. This list should include 50.59 evaluations for the following:
a. Changes that have been made under the provisions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4) since the last MOD/50.59 inspection
; b. Modifications that are field work complete; and c. Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior U.S. Nuclear Regulatory Commission approval was sought and obtained.


DOCUMENT REQUEST FOR 50.59 INSPECTION 2 (2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a)
DOCUMENT REQUEST FOR 50.59 INSPECTION (2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.
calculations; (b)
procedure revisions; (c)
changes to the facility (modifications); (d)
non-routine operating configurations; or (e) departures in methods of analyses.


The list should contain the number and title of each document, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
The list should contain the number and title of each document, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).


(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not apply. (4) A list of calculation changes that have been issued for use.
(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not apply.


(5) A list of corrective action documents (open and closed) that address 1 0 CFR 50.59 issues, concerns, or processes. These documents should also include the corrective action documents associated with the modification and the 50.59 change implementation.
(4) A list of calculation changes that have been issued for use.
 
(5) A list of corrective action documents (open and closed) that address 10 CFR 50.59 issues, concerns, or processes. These documents should also include the corrective action documents associated with the modification and the 50.59 change implementation.


The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.
The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.
Line 91: Line 87:
(11) Current management and engineering organizational chart.
(11) Current management and engineering organizational chart.


II. Information Requested to be Available Prior to Inspection
II. Information Requested to be Available Prior to Inspection. Requests will be Made for Specific Item (1) Documents by September 30, 2019 for Availability of Requested Item (1) Documents in Regional Office by October 14, 2019, and Items (2), (3) and (4) Documents on First Day of Inspection (October 28, 2019).
. Request s will be M ade for Specific Item (1) Documents by September 30, 2019 for Availability of Requested Item (1) Documents in Regional Office by October 1 4, 2019, and Items (2), (3) and (4) Documents on First Day of Inspection (October 28, 2019). (1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, modification packages (including description), 10 CFR 50.59 evaluations or screenings, and any corrective action documents DOCUMENT REQUEST FOR 50.59 INSPECTION 3 (2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.


a. Updated Final Safety Analysis Report, if not previously provided
(1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, modification packages (including description), 10 CFR 50.59 evaluations or screenings, and any corrective action documents
; b. Original FSAR Volumes; c. Original SER and Supplements; d. Final Safety Analysis Report Question and Answers; e. Quality Assurance Plan; f. Technical Specifications, if not previously provided
 
; g. Latest IPE/PRA Report; h. Vendor Manuals; and i. The latest 10 CFR 50.59 UFSAR Update Submittal.
DOCUMENT REQUEST FOR 50.59 INSPECTION (2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
 
a. Updated Final Safety Analysis Report, if not previously provided; b. Original FSAR Volumes; c. Original SER and Supplements; d. Final Safety Analysis Report Question and Answers; e. Quality Assurance Plan; f. Technical Specifications, if not previously provided; g. Latest IPE/PRA Report; h. Vendor Manuals; and i. The latest 10 CFR 50.59 UFSAR Update Submittal.


(3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:
(3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:
Line 102: Line 99:


(4) Assessment and Corrective Actions:
(4) Assessment and Corrective Actions:
a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate d as a result of the most recent 50.59 Quality Assurance audit and/or self-assessment.
a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generated as a result of the most recent 50.59 Quality Assurance audit and/or self-assessment.


III. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the inspection team's questions or queries during this inspection.
III. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during this inspection.


(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member).
(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member).


If you have any questions regarding the information requested, please contact the inspection team leader.
If you have any questions regarding the information requested, please contact the inspection team leader.
3
}}
}}

Revision as of 13:35, 19 October 2019

Ltr. 07/29/19 Palisades Nuclear Plant - Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000255/2019011 (DRS-D.Szwarc)
ML19210D402
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/29/2019
From: Dariusz Szwarc
Division of Reactor Safety III
To: Arnone C
Entergy Nuclear Operations
References
IR 2019011
Download: ML19210D402 (6)


Text

uly 29, 2019

SUBJECT:

PALISADES NUCLEAR PLANTINFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59)

BASELINE INSPECTION; INSPECTION REPORT 05000255/2019011

Dear Arnone:

On October 28, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a 50.59 Baseline Inspection at the Palisades Nuclear Plant. This inspection will be performed in accordance with the NRC baseline Inspection Procedure 71111.17T. The onsite portion of the inspection will take place during the week of October 28, 2019.

Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.

  • The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via CD and delivered to the regional office no later than September 16, 2019. The inspection team will review this information and, by September 30, 2019, will request specific items that should be provided for review in the regional office by October 14, 2019.
  • The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within Group II (i.e., Item (1)), will be requested for review in the regional office prior to the inspection by October 14, 2019, as identified above. The remaining documents should be available by the first day of the onsite inspection, October 28, 2019.
  • The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

C. Arnone -2-The lead inspector for this inspection is Mr. Dariusz Szwarc. We understand that our regulatory contact for this inspection is Ms. Barb Dotson of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA Alan Dahbur Acting for/

Dariusz Szwarc, Senior Reactor Inspector Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-255 License No. DPR-20 Enclosure:

Document Request for 50.59 Inspection cc: Distribution via LISTSERV

C. Arnone -3-Letter to Charles Arnone from Dariusz Szwarc dated July 29, 2019.

SUBJECT: PALISADES NUCLEAR PLANTINFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59)

BASELINE INSPECTION; INSPECTION REPORT 05000255/2019011 DISTRIBUTION:

Douglas Dodson RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Darrell Roberts John Giessner Jamnes Cameron Allan Barker DRPIII DRSIII ADAMS Accession Number: ML19210D402 OFFICE RIII NAME ADahbur for DSzwarc:cl DATE 07/29/19 OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR 50.59 INSPECTION Inspection Report: 05000255/2019011 Inspection Dates: October 28, 2019, through November 1, 2019 Inspection Procedure: 71111.17T, Evaluations of Changes, Tests, and Experiments Lead Inspector: Dariusz Szwarc 630-829-9803 Dariusz.Szwarc@nrc.gov I. Information Requested for In-Office Preparation Week The following information is requested by September 16, 2019, or sooner, to facilitate the selection of specific items that will be reviewed during the onsite inspection week.

The inspection team will select specific items from the information requested below and submit a list to your staff by September 30, 2019. We will request that certain items be made available to the regional office prior to the inspection by October 14, 2019. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should identify the associated system and cover the time frame from the receipt of information for the last MOD/50.59 inspection to the present.

The required information identified below should be provided on CD. Please provide three copies of each CD submitted (i.e., one for each inspector). The preferred file format is a searchable pdf file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

(1) List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59 completed evaluations involving (a) calculations, (b) procedure revisions, (c) changes to the facility (modifications), (d) non-routine operating configurations, or (e) departures in methods of analyses. This list should include 50.59 evaluations for the following:

a. Changes that have been made under the provisions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4) since the last MOD/50.59 inspection; b. Modifications that are field work complete; and c. Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior U.S. Nuclear Regulatory Commission approval was sought and obtained.

Enclosure

DOCUMENT REQUEST FOR 50.59 INSPECTION (2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.

The list should contain the number and title of each document, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).

(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not apply.

(4) A list of calculation changes that have been issued for use.

(5) A list of corrective action documents (open and closed) that address 10 CFR 50.59 issues, concerns, or processes. These documents should also include the corrective action documents associated with the modification and the 50.59 change implementation.

The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.

(6) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings, and UFSAR updates.

(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.

(8) Copy of the UFSAR change log or a synopsis of the changes. This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal.

(9) Electronic copy of the UFSAR and technical specifications, if available.

(10) Name(s) and phone numbers for the regulatory and technical contacts.

(11) Current management and engineering organizational chart.

II. Information Requested to be Available Prior to Inspection. Requests will be Made for Specific Item (1) Documents by September 30, 2019 for Availability of Requested Item (1) Documents in Regional Office by October 14, 2019, and Items (2), (3) and (4) Documents on First Day of Inspection (October 28, 2019).

(1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, modification packages (including description), 10 CFR 50.59 evaluations or screenings, and any corrective action documents

DOCUMENT REQUEST FOR 50.59 INSPECTION (2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.

a. Updated Final Safety Analysis Report, if not previously provided; b. Original FSAR Volumes; c. Original SER and Supplements; d. Final Safety Analysis Report Question and Answers; e. Quality Assurance Plan; f. Technical Specifications, if not previously provided; g. Latest IPE/PRA Report; h. Vendor Manuals; and i. The latest 10 CFR 50.59 UFSAR Update Submittal.

(3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:

a. Drawings supporting the modifications; b. Procedures affected by the modifications; and c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(4) Assessment and Corrective Actions:

a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generated as a result of the most recent 50.59 Quality Assurance audit and/or self-assessment.

III. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during this inspection.

(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection team leader.

3