ML042990558: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 09/23/2004
| issue date = 09/23/2004
| title = RB-09-2004 - Draft - Outline Comments
| title = RB-09-2004 - Draft - Outline Comments
| author name = Gody A T
| author name = Gody A
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Hinnenkamp P D
| addressee name = Hinnenkamp P
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000458
| docket = 05000458

Revision as of 03:10, 14 July 2019

RB-09-2004 - Draft - Outline Comments
ML042990558
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/23/2004
From: Gody A
Operations Branch IV
To: Hinnenkamp P
Entergy Operations
References
50-458/04-301, RB-09-2004 50-458/04-301
Download: ML042990558 (2)


Text

DRAFT OUTLINE COM MENTS Admi nist rat ive JPMs*Radiation control topic involving entry and exit from the RCA for bot h the RO and SRO is too simpl e and shoul d not b e used. Resolution: T he JPM will be more challenging be cause the en try will involv e an additiona l entry in to a high radia tion area.Walk-throughs

  • What walk-throughs will be performed together?

ANS: JPMs 6, 7, an d 8 and JP Ms 2 and 3 w ill be pe rfo rme d si mul tan eou sly.*Any repeat use of previo us NRC ex am material? If so how much (i n percentage) is the repeat? ANS: One JPM, #200

-08, is the only part of the ex am that is repea ted from the last N RC ex am.Scenarios*Identi fy the actual attrib utes gi ven o n ES-3 01-4*Form ES-301-5, S cenario 1, R O: The BOP does n ot have a normal evol ution and th e RO numb er 4 for Instrume nt/comp onent shoul d be n umber 5. Resolution: Will mak e changes to th e ES-301-5 for ms.*Form ES-301-5, S cenario 1, S RO-I: As RO, the n umber 4 for instrument/co mponent shoul d be n umber 5. Resolution: Will mak e changes to the ES-301-5 forms.*I would like each spe cific appli cant to have their ow n ES-301-5.

Written*Pleas e inc lude the KA descri ption on the referen ce wr itten exam.*For K/As that re quire the use o f procedures, be su re that the questio n references a procedure.

  • Need a cross-referenc e betw een th e outl ine s ubject and th e questi on dev elope d to addres s this subjec t. Resolution: A cross referen ce will be developed

.*Record of rejected K As, SRO Page 1 5th table en try, why rejected?

ANS: A gree, the KA s ho ul d n ot be re je ct ed. W il l d ev el op a q ue st io n f or th is KA.General*Would like a sepa rate l istin g of the P RA an d IPE insi ghts (ES 201-2 item 4 a).*Any repeats from the audit ex amination (ES 201-2, item 3a (3))? ANS: No

  • Which W/T JPM meets the response to th e emergency or a bnormal condi tion (ES 201

-2, item 3b(3))?

ANS: In-plant walk-throughs 1 and 2.*Is any SROU going to take only the 25 questio n test? ANS: No