L-2006-006, December 2005 Monthly Operating Report for Turkey Point Units 3 and 4: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/17/2006
| issue date = 01/17/2006
| title = December 2005 Monthly Operating Report for Turkey Point Units 3 and 4
| title = December 2005 Monthly Operating Report for Turkey Point Units 3 and 4
| author name = Jones T O
| author name = Jones T
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:*1 w I FPL JAN i 7 2006 L-2006-006 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report -December 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, Terry 0. Jon s Vice President Turkey Point Nuclear Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.an FPL Group company 9--2 I
-4 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
50-250 Turkey Point Unit 3 1/5/2006 Ronald Everett (305) 246-619,2 Reporting Period December 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
= 720 Maximum Dependable Capacity (MWe-Net) 1 693 Month-4 4..-.--No. of hours reactor was critical 707.7-4 4.No. of hours generator was on line (service hours)692.3 Unit reserve shutdown hours 01 0 121.8 Net Electrical Energy (MWH) 483879 f 57989 141337579 UNI1 SHUTDOWNS (1) Reason (2) Method A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training/License Examination F -Administrative G -Operational Error (Explain)H -Other 1 -Manual 2 -Manual Trip/Scram 3 -Automatic Trip/Scram 4 -Continuation 5 -Other (Explain)Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power until December 9th, 2005 when the unit reduced power to 75% to support work on the SE 240 KV Bus to ensure grid stability.
Unit 3 returned to 100% power on December 1 O'h.The unit operated at essentially 100% power until December 20t", when a feedwater heater drain valve problem caused loss of 3A & 3B heater drain pumps. Additionally, a condenser tube leak forced the unit to reduce power to approximately 60%. Power was restored to 100% on December 22nd and the unit operated at essentially 100%power until 12/29/2005, when a Turbine Plant Cooling Water (TPCW) leak in the exciter forced a manual reactor shutdown.
Unit 3 returned to approximately 60% power on December 31, 2005. Power was limited to 60% due to alignment issues with the 3B Steam Generator Feedwater pump/motor.
-i f DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
50-251 Turkey Point Unit 4 1/5/2006 Ronald Everett (305) 246-61 90 Reporting Period: December 2005 Design Electrical Rating (MWe-Net)
= 720 Maximum Dependable Capacity (MWe-Net) 693 Month I No. of hours reactor was critical_ .I 744 1 214546.7 209886.72 No. of hours generator was on line (service hours)744 I 6245.42 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 541366 4240963 138841714 UNIT SHUTDOWNS (1) Reason (2) Method A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training/Lcense Examination F -Administrative G -Operational Error (Explain)H -Other 1 -Manual 2- Manual Trip/Scram 3 -Automatic Trip/Scram 4 -Continuation 5 -Other (Explain)Summarv Of Monthly ODerating ExDerience Unit 4 operated at essentially 100% power the month of December, 2005.}}


=Text=
=Text=

Revision as of 01:07, 14 July 2019

December 2005 Monthly Operating Report for Turkey Point Units 3 and 4
ML060310378
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/17/2006
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2006-006
Download: ML060310378 (3)


Text

{{#Wiki_filter:*1 w I FPL JAN i 7 2006 L-2006-006 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report -December 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, Terry 0. Jon s Vice President Turkey Point Nuclear Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.an FPL Group company 9--2 I -4 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE: 50-250 Turkey Point Unit 3 1/5/2006 Ronald Everett (305) 246-619,2 Reporting Period December 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) = 720 Maximum Dependable Capacity (MWe-Net) 1 693 Month-4 4..-.--No. of hours reactor was critical 707.7-4 4.No. of hours generator was on line (service hours)692.3 Unit reserve shutdown hours 01 0 121.8 Net Electrical Energy (MWH) 483879 f 57989 141337579 UNI1 SHUTDOWNS (1) Reason (2) Method A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training/License Examination F -Administrative G -Operational Error (Explain)H -Other 1 -Manual 2 -Manual Trip/Scram 3 -Automatic Trip/Scram 4 -Continuation 5 -Other (Explain)Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power until December 9th, 2005 when the unit reduced power to 75% to support work on the SE 240 KV Bus to ensure grid stability. Unit 3 returned to 100% power on December 1 O'h.The unit operated at essentially 100% power until December 20t", when a feedwater heater drain valve problem caused loss of 3A & 3B heater drain pumps. Additionally, a condenser tube leak forced the unit to reduce power to approximately 60%. Power was restored to 100% on December 22nd and the unit operated at essentially 100%power until 12/29/2005, when a Turbine Plant Cooling Water (TPCW) leak in the exciter forced a manual reactor shutdown. Unit 3 returned to approximately 60% power on December 31, 2005. Power was limited to 60% due to alignment issues with the 3B Steam Generator Feedwater pump/motor. -i f DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE: 50-251 Turkey Point Unit 4 1/5/2006 Ronald Everett (305) 246-61 90 Reporting Period: December 2005 Design Electrical Rating (MWe-Net) = 720 Maximum Dependable Capacity (MWe-Net) 693 Month I No. of hours reactor was critical_ .I 744 1 214546.7 209886.72 No. of hours generator was on line (service hours)744 I 6245.42 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 541366 4240963 138841714 UNIT SHUTDOWNS (1) Reason (2) Method A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training/Lcense Examination F -Administrative G -Operational Error (Explain)H -Other 1 -Manual 2- Manual Trip/Scram 3 -Automatic Trip/Scram 4 -Continuation 5 -Other (Explain)Summarv Of Monthly ODerating ExDerience Unit 4 operated at essentially 100% power the month of December, 2005.}}

Text

{{#Wiki_filter:*1 w I FPL JAN i 7 2006 L-2006-006 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report -December 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.Very truly yours, Terry 0. Jon s Vice President Turkey Point Nuclear Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.an FPL Group company 9--2 I -4 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE: 50-250 Turkey Point Unit 3 1/5/2006 Ronald Everett (305) 246-619,2 Reporting Period December 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) = 720 Maximum Dependable Capacity (MWe-Net) 1 693 Month-4 4..-.--No. of hours reactor was critical 707.7-4 4.No. of hours generator was on line (service hours)692.3 Unit reserve shutdown hours 01 0 121.8 Net Electrical Energy (MWH) 483879 f 57989 141337579 UNI1 SHUTDOWNS (1) Reason (2) Method A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training/License Examination F -Administrative G -Operational Error (Explain)H -Other 1 -Manual 2 -Manual Trip/Scram 3 -Automatic Trip/Scram 4 -Continuation 5 -Other (Explain)Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power until December 9th, 2005 when the unit reduced power to 75% to support work on the SE 240 KV Bus to ensure grid stability. Unit 3 returned to 100% power on December 1 O'h.The unit operated at essentially 100% power until December 20t", when a feedwater heater drain valve problem caused loss of 3A & 3B heater drain pumps. Additionally, a condenser tube leak forced the unit to reduce power to approximately 60%. Power was restored to 100% on December 22nd and the unit operated at essentially 100%power until 12/29/2005, when a Turbine Plant Cooling Water (TPCW) leak in the exciter forced a manual reactor shutdown. Unit 3 returned to approximately 60% power on December 31, 2005. Power was limited to 60% due to alignment issues with the 3B Steam Generator Feedwater pump/motor. -i f DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE: 50-251 Turkey Point Unit 4 1/5/2006 Ronald Everett (305) 246-61 90 Reporting Period: December 2005 Design Electrical Rating (MWe-Net) = 720 Maximum Dependable Capacity (MWe-Net) 693 Month I No. of hours reactor was critical_ .I 744 1 214546.7 209886.72 No. of hours generator was on line (service hours)744 I 6245.42 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 541366 4240963 138841714 UNIT SHUTDOWNS (1) Reason (2) Method A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training/Lcense Examination F -Administrative G -Operational Error (Explain)H -Other 1 -Manual 2- Manual Trip/Scram 3 -Automatic Trip/Scram 4 -Continuation 5 -Other (Explain)Summarv Of Monthly ODerating ExDerience Unit 4 operated at essentially 100% power the month of December, 2005.}}