ML061520044: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/30/2006
| issue date = 05/30/2006
| title = 06/22/2006 Notice of Open Meeting with Kewaunee Power Station, to Discuss the Progress in Implementation of Station-wide Improvement Initiatives
| title = 06/22/2006 Notice of Open Meeting with Kewaunee Power Station, to Discuss the Progress in Implementation of Station-wide Improvement Initiatives
| author name = Louden P L
| author name = Louden P
| author affiliation = NRC/RGN-III/DRP/RPB5
| author affiliation = NRC/RGN-III/DRP/RPB5
| addressee name =  
| addressee name =  

Revision as of 17:07, 13 July 2019

06/22/2006 Notice of Open Meeting with Kewaunee Power Station, to Discuss the Progress in Implementation of Station-wide Improvement Initiatives
ML061520044
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/30/2006
From: Louden P
NRC/RGN-III/DRP/RPB5
To:
References
Download: ML061520044 (4)


Text

May 30, 2006NOTICE OF SIGNIFICANT LICENSEE MEETINGTHIS MEETING IS OPEN TO PUBLIC ATTENDANCEName of Licensee:Dominion Energy Kewaunee, Inc.Name of Facility:Kewaunee Power StationDocket Number:50-305 Date and Time of Meeting:Thursday, June 22, 2006, 10:00 a.m. (CDT)

Location of Meeting:U.S. Nuclear Regulatory CommissionRegion III Office 2443 Warrenville Road, Suite 210Lisle, Illinois 60532-4351Purpose of Meeting:The purpose of the meeting is to discuss the progress inimplementation of station-wide improvement initiatives. The status of corrective actions from problems identified during the reactor shutdown on April 26 and the reactor startup on May 17, 2006, will also be discussed.Category:This is a Category 1 meeting. The public is invited to observe thismeeting and will have one or more opportunities to communicatewith the NRC after the business portion, but before the meeting is adjourned.NRC Att endees:J. Caldwell, Regional Administrator G. Grant, Deputy Regional Administrator M. Satorius, Director, Division of Reactor Projects C. Pederson, Director, Division of Reactor Safety P. Louden, Chief, Branch 5, Division of Reactor Projects Others as designatedLicensee Attendees

L. Hartz, Site Vice-President K. Davison, Plant Manager Others as designated Notice of Significant Licensee MeetingNOTE:Attendance at this meeting by NRC personnel, other than those listed above,should be made known to Pat Louden via e-mail or by telephone at

((630) 829-9627) by COB on Tuesday, June 20, 2006. The NRC providesreasonable accommodation to individuals with disabilities where appropriate. Ifyou need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meetingcontact. Determinations on requests for reasonable accommodation will bemade on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact.Approved by: /RA/Patrick Louden, ChiefBranch 5 Division of Reactor ProjectsMeeting Contact:Pat LoudenBranch Chief (630) 829-9627 PLL@nrc.gov Notice of Significant Licensee MeetingNOTE:Attendance at this meeting by NRC personnel, other than those listed above, shouldbe made known to Pat Louden via e-mail or by telephone at ((630) 829-9627) by COB on Tuesday, June 20, 2006. The NRC provides reasonable accommodationto individuals with disabilities where appropriate. If you need a reasonableaccommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, largeprint), please notify the NRC's meeting contact. Determinations on requests forreasonable accommodation will be made on a case-by-case basis. Interestedmembers of the public can participate in this meeting via a toll-free teleconference.

For details, please call the NRC meeting contact.Approved by: /RA/Patrick Louden, ChiefBranch 5 Division of Reactor ProjectsMeeting Contact:Pat LoudenBranch Chief (630) 829-9627 PLL@nrc.govDOCUMENT NAME:E:\Filenet\ML061520044.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEMKunowski:slsPLoudenDATE05/30/200605/30/2006OFFICIAL RECORD COPY Notice of Significant Licensee MeetingDistribution

J. Dixon-Herrity (JLD), Region III Coordinator, OEDO C. Holden (CFH), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR E. Hackett (EMH1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR L. Raghavan (LXR1), DORL, NRRM. Banerjee (MXB), Project Manager, DORL, NRRM. Satorius (MAS), Director, Division of Reactor Projects, RIIIS. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII P. Louden, Branch Chief, DRP S. Burton, Kewaunee DRS Branch Chiefs (JFL, DEH, KXR, AMS1, SKO, HXP1)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP