| | issue date = 01/28/2009 | | | issue date = 01/28/2009 |
| | title = Email Regarding Need Supplemental Information for AST Acceptance Review from Containment and Ventilation Branch | | | title = Email Regarding Need Supplemental Information for AST Acceptance Review from Containment and Ventilation Branch |
| | author name = Tam P S | | | author name = Tam P |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
| | addressee name = Flentje F | | | addressee name = Flentje F |
Line 14: |
Line 14: |
| | page count = 2 | | | page count = 2 |
| | project = TAC:ME0219, TAC:ME0220 | | | project = TAC:ME0219, TAC:ME0220 |
| | stage = Supplement | | | stage = Acceptance Review |
| }} | | }} |
|
| |
|
Revision as of 03:39, 12 July 2019
Letter Sequence Acceptance Review |
---|
TAC:ME0219, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) TAC:ME0220, Control Room Habitability, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (Open) |
|
MONTHYEARNRC 2008-0081, Submittal of License Amendment Request 241, Alternative Source Term2008-12-0808 December 2008 Submittal of License Amendment Request 241, Alternative Source Term Project stage: Request NRC 2009-0002, Supplement to License Amendment Request 241, Summary of Pbnp Sump Ph Calculation Inputs, Assumptions, Methodology and Results2009-01-16016 January 2009 Supplement to License Amendment Request 241, Summary of Pbnp Sump Ph Calculation Inputs, Assumptions, Methodology and Results Project stage: Supplement NRC 2009-0006, Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions2009-01-27027 January 2009 Supplement to License Amendment Request 241 Transmittal of Proposed License Conditions Project stage: Supplement ML0903707702009-01-28028 January 2009 Email Regarding Need Supplemental Information for AST Acceptance Review from Containment and Ventilation Branch Project stage: Acceptance Review NRC 2009-0023, Supplement to License Amendment Request 241 Alternative Source Term2009-02-20020 February 2009 Supplement to License Amendment Request 241 Alternative Source Term Project stage: Supplement ML0835309302009-03-25025 March 2009 FPL Energy Point Beach, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Point Beach Nuclear Plant, Units 1 and 2 Project stage: Withholding Request Acceptance NRC 2009-0039, Response to Request for Additional Information License Amendment Request 241, Alternative Source Term2009-04-17017 April 2009 Response to Request for Additional Information License Amendment Request 241, Alternative Source Term Project stage: Response to RAI NRC 2009-0045, Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab)2009-04-17017 April 2009 Supplement to License Amendment Request 241, Proposed Technical Specifications for Primary Auxiliary Building Ventilation (Vnpab) Project stage: Supplement NRC 2009-0054, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term2009-05-15015 May 2009 Response to Request for Additional Information License Amendment Request 241 Alternative Source Term Project stage: Response to RAI L-2009-134, Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 42009-06-29029 June 2009 Submittal of Quality Assurance Topical Report (QATR FPL-1) Revision 4 Project stage: Request NRC 2009-0080, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-08-20020 August 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI ML0923605352009-08-26026 August 2009 Request for Additional Information, Round 2, from Containment and Ventilation Branch, on the Proposed Amendment Re. Alternative Source Term Project stage: RAI NRC 2009-0086, License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information2009-09-0404 September 2009 License Amendment Request 241, Alternative Source Term, Response to Request for Additional Information Project stage: Response to RAI NRC 2016-0029, Response to Request for Additional Information Regarding License Amendment Request 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program2016-07-11011 July 2016 Response to Request for Additional Information Regarding License Amendment Request 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program Project stage: Response to RAI 2009-04-17
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23271A1542023-09-28028 September 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23208A3072023-07-27027 July 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Requests Regarding I6-RR-1, I6-RR-2, and I6-RR-3 (EPIDs L-2023-LLR-0030, L-2023-LLR-0031, L-2023-LLR-0032) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23136A2782023-05-0505 May 2023 Email to R Coffey Point Beach SLRA Second Annual Update - Request for Additional Information Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22291A3692022-10-18018 October 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Use Beacon Power Distribution Monitoring System ML22249A0052022-09-0202 September 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment and Exemptions Regarding Risk-Informed Approach to Address GSI-191 ML22229A1052022-08-17017 August 2022 Response to Questions Regarding Point Beach Nuclear Power Plant with Attachment ML22229A1022022-07-18018 July 2022 Original Request - Questions Regarding Point Beach Nuclear Power Plant ML22196A0062022-07-15015 July 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4b ML22094A0802022-04-0404 April 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-366 ML22006A2762022-01-0606 January 2022 SLR - FW: Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML22006A1952022-01-0606 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22006A2012022-01-0606 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A1672022-01-0404 January 2022 SLR - Ref: Point Beach ML22004A3192022-01-0404 January 2022 SLR - FW: Point Beach ML22004A0012022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22006A1942022-01-0404 January 2022 SLR - (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, Docke ML22004A3212022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A3202022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22004A1732022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22004A3182022-01-0404 January 2022 SLR - FW: EPA Comment Letter - Point Beach SEIS ML22006A1992022-01-0303 January 2022 SLR - (External_Sender) Comments of Michael J Keegan on Dseis Point Beach ML22004A3172021-12-21021 December 2021 SLR - (External_Sender) EPA Comment Letter - Point Beach SEIS ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML22006A2752021-12-0202 December 2021 SLR - (External_Sender) Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML21341A6102021-11-16016 November 2021 SLRA Safety RAI Set 12 Final Email ML21314A4212021-11-10010 November 2021 Fws to NRC, Concurrence with ESA Determination for Point Beach Subsequent License Renewal ML21307A1522021-11-0909 November 2021 NRC to Fws, Request for Concurrence with Endangered Species Act Determinations for Point Beach Subsequent License Renewal ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21279A1202021-10-0505 October 2021 Email: Wi Shpo Review Point Beach Nuclear Plant SLR ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21273A0232021-09-0202 September 2021 SLRA Safety RAI Set 9 Final Email ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2462021-08-26026 August 2021 SLRA Safety RAIs Set 8 Final Email ML21242A2222021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 ML21242A2232021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 Email ML21242A2192021-08-20020 August 2021 SLRA Safety RAI Set 7 Final Email ML21242A2132021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft Email ML21242A2142021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft ML21242A2042021-08-12012 August 2021 SLRA Safety RAIs Set 5 Final Email ML21224A2042021-08-12012 August 2021 LTR-21-0225-1-RIII. Time Sensitive: Request for Further Inspection ML21242A0142021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A2382021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A0112021-08-0909 August 2021 SLRA Draft Safety RAIs Set 6 Email 2023-09-28
[Table view] |
Text
From: Peter Tam Sent: Wednesday, January 28, 2009 12:12 PM To: Fritzie.Flentje@fpl.com Cc: Nageswara Karipineni; Lois James; Justin Poole
Subject:
Point Beach - need supplemental information for AST acceptance review (TAC ME0219, ME0220)
Fritzie: Following is what our reviewer Nageswara Karipineni wrote. He requested a conference call with you on Thursday (1/29), but I am on leave 1/29 - 2/3. Since both I and Justine Poole will not be around, you probably should contact Lois James (301-415-3306) if this phone call is to take place during this period. If it can wait unti 2/4, both Justine and I will be back.
There are two issues that we want the licensee to address in regards to the Point Beach AST:
The licensee is crediting the Control Room Ventilation System (VNCR) and the Primary Auxiliary Building Ventilation (VNPAB) System for implementing the AST. However, the licnesee submittal did not make any mention of adding these systems to the scope of the Maintenance Rule program in accordance with 10 CFR 50.65, and to the scope of the license renewal in accordance with 10 CFR 54.37(b).
The above equipment should also be added to the Technical Specifications (TS) with appropriate Limiting Condition for Operation (LCO) and Surveillance Requirements (SR) because the equipment is required for safe operation of the facility as required by 10 CFR 50.36(d)(2)(ii)( C), Criteria 3, "A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design-basis accident or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier." Peter S. Tam Senior Project Manager (for Kewaunee and Monticello) Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451
E-mail Properties Mail Envelope Properties (C56E360E9D804F4B95BC673F886381E71D44FBABFE)
Subject:
Point Beach - need supplemental information for AST acceptance review (TAC ME0219, ME0220)
Sent Date: 1/28/2009 12:12:17 PM Received Date: 1/28/2009 12:12:17 PM From: Peter Tam
Created By: Peter.Tam@nrc.gov
Recipients:
Fritzie.Flentje@fpl.com (Fritzie.Flentje@fpl.com) Tracking Status: None Nageswara.Karipineni@nrc.gov (Nageswara Karipineni) Tracking Status: None Lois.James@nrc.gov (Lois James)
Tracking Status: None Justin.Poole@nrc.gov (Justin Poole)
Tracking Status: None
Post Office:
HQCLSTR02.nrc.gov
Files Size Date & Time
MESSAGE 16065 1/28/2009
Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False
Sensitivity: olNormal Recipients received: