Line 5: |
Line 5: |
| | author name = Velasquez A | | | author name = Velasquez A |
| | author affiliation = US Dept of Homeland Security, US Federal Emergency Mgmt Agency (FEMA) | | | author affiliation = US Dept of Homeland Security, US Federal Emergency Mgmt Agency (FEMA) |
| | addressee name = Satorius M A | | | addressee name = Satorius M |
| | addressee affiliation = NRC/RGN-III | | | addressee affiliation = NRC/RGN-III |
| | docket = 05000315, 05000316 | | | docket = 05000315, 05000316 |
Revision as of 15:21, 10 July 2019
Similar Documents at Cook |
---|
Category:Emergency Preparedness-Emergency Plan and Post Exercise Evaluation (FEMA Evaluation)
MONTHYEARML19046A0472018-12-18018 December 2018 D.C. Cook Nuclear Plant and Palisades Nuclear Power Plant - Medical Service Drills After Action Report/Improvement Plan from 10/02/2018 and 10/18/2018 Exercise ML14141A4892013-09-11011 September 2013 FEMA, Submittal of Final After Action Report/Improvement Plan for Radiological Emergency Preparedness Hostile Action Based Partial Participation Plume Exposure Pathway Exercise Conducted on June 4, 2013, for Donald C. Cook ML1127606012011-09-20020 September 2011 FEMA Donald C. Cook Nuclear Plant, MS-1 Final Exercise Report, Exercise Date - July 20, 2011 ML11200A1712011-07-0808 July 2011 FEMA Enclosing Copy of Final After Action Report/Improvement Plan for March 1, 2011, Radiological Emergency Preparedness Partial Participation Plume Exposure Pathway Exercise for D.C. Cook Nuclear Power Plant ML1119603832011-07-0808 July 2011 FEMA, Transmittal of Final After Action Report / Improvement Plan for March 1, 2011, Radiological Emergency Preparedness (REP) Partial Participation Plume Exposure Pathway Exercise for D. C. Cook ML0408506442003-07-11011 July 2003 Medical Services Drill Report D.C. Cook Nuclear Power Plant 2018-12-18
[Table view] Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
U.S. Department of Homeland Security Region V 536 South Clark Street, Floor 6 Chicago, IL 60605 Mr. Mark Satorius Regional Administrator U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Lisle, Illinois 60542-4351
Dear Mr. Satorius:
Enclosed is one copy of the Final After Action Report / Improvement Plan for the March 1,2011, Radiological Preparedness (REP)
Partial Participation Plume Exposure Pathway Exercise for the D.C. Cook Nuclear Power Plant. Two copies were provided for the State of Michigan and one copy was provided for Berrien County. The State of Michigan, Berrien County, and the utility owner/operator, American Electric Power, participated in this exercise.
The Final Report was prepared by the U.S. Department of Homeland Security/Federal Emergency Management Agency (DHSIFEMA)
Region V, Radiological Emergency Preparedness Program. No Deficiencies were identified for any jurisdiction during this exercise.
No Areas Requiring Corrective Actions (ARCAs) were identified for any jurisdiction during this exercise.
There were three Planning Issues unresolved during this exercise for the State of Michigan.
The first Planning Issue Number, 15-11-6al-P-Ol, was issued under Criterion 6.a.l -"Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees andlor emergency workers." Contamination may have been spread and dosimetry may have been contaminated by the emergency workers gloved hands being contaminated without frisking.
Recommend revising procedure to ensure the monitoring of hands or that they re-glove after opening potentially contaminated tailgates and handling potentially contaminated equipment and samples. 'Ii*'
JUt 1 5 2011 www. ema.gov Mark Satorius Page 2 The second Planning Issue Number, 15-11-3al-P-02, was issued under Criterion 3.a.1 -"OROs issue appropriate dosimetry and procedures, and manage radiological exposure to emergency workers in accordance with plans and procedures." Emergency workers periodically and at the end of each mission read and record dosimeter reading. Appendix F of the Michigan Nuclear Facility Emergency Management Plan states that the administrative dose limit is 1 rem per day and 3 rem per emergency Total Effective Dose Equivalent (TEDE) (footnote b). Electronic Personal Dosimeters and Reading Dosimeters only approximate the Deep Dose Equivalent component ofTEDE. No EPDIDRD correction factor for TEDE is given. If a DRD reading of 1 R or an EPD reading of 1 rem is indicated on the device, the individuals TEDE may actually be several rem due to the Committed Effective Dose Equivalent component not indicated by the dosimetry.
The third Planning Issue Number, l5-11-4a3-P-03, was issued under Criterion 4.a.3 -"Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected." Teams must move to an appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivity has been collected on the sampling media. The HPRT Standard Operating Procedure (SOP) specified air sampler volume to be collected at six cubic feet, run time of three minutes at two cubic feet per minute does not meet the minimum volume of ten cubic feet required to detect the presence of radioiodine concentrations as low as 10-7 Ci/cc. The HPRT SOP also does not address purging the air sampler prior to disassembly and analysis.
The counting system may not be sensitive enough to detect radioiodines as low as 10-7 Cilcc when the total volume collected is less than 10-cubic feet. The net count may cause a gross overestimation of the calculated thyroid dose due to the presence of noble gases remaining in the sample cartridge if the air sample is not purged prior to analysis.
There were no Planning Issues identified for Berrien County. Based on the results of the March 1,2011 exercise, the offsite radiological emergency response plans and preparedness for the State of Michigan and affected local jurisdictions, site-specific to the D.C. . Cook Nuclear Power Plant, can be implemented and are adequate to provide reasonable assurance that appropriate measures can be taken offsite to protect the health and safety of the public in the event of a radiological emergency at the site. Therefore, the Title 44 CFR, Part 350, approval of the offsite radiological emergency response plans and preparedness for the State of Michigan site-specific to the D.C. Cook Nuclear Power Plant, granted on December 4, 1980, remains in effect. Copies of this Report have been provided to the DHSIFEMA National Office, Nuclear Commission (NRC) Headquarters' Document Control Desk, and the State of Mark Satorius Page 3 If you have any please contact William E. King, Chairman, Regional Assistance Committee, DHS/FEMA, Region V, at (312) 408-5575.
Sincerely, Andrew Velasquez III Regional Administrator Enclosures (l)