GNRO-2011/00068, Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/17/2011
| issue date = 08/17/2011
| title = Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination
| title = Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination
| author name = Perino C L
| author name = Perino C
| author affiliation = Entergy Operations, Inc
| author affiliation = Entergy Operations, Inc
| addressee name =  
| addressee name =  

Revision as of 10:58, 29 June 2019

Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examination
ML11236A117
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/17/2011
From: Perino C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2011/00068, RIS 2011-04
Download: ML11236A117 (3)


Text

Ah Enteigy Entergy Operations, Inc.7003 Bald Hill Road PO. Box 756 Port Gibson, MS 39150 Tel 601 437 6299 Christina L. Perino Manager Licensing GNRO-2011/00068 August 17, 2011 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Response to NRC Regulatory Issue Summary 2011-04"Preparation and Scheduling of Operator Licensing Examinations" Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

Dear Sir or Madam:

NRC Regulatory Issue Summary 2011-04 (GNRI-2011/00072), "Preparation and Scheduling of Operator Licensing Examinations," requests licensees to provide the estimated number of candidates to be examined during calendar years 2013 through 2016.The updated information for Grand Gulf Nuclear Station is provided in the attached NRC Form 536. This information represents the best estimate currently available.

There are no commitments contained in this submittal.

If you have any questions or require additional information regarding this matter, please contact Michael K. Rasch at 601-437-6362.

Sincerely, CLP/SW

Attachment:

NRC Form 536 "Operator Licensing Examination Data" cc: (See Next Page)

GNRO-2011/00068 Page 2 of 2 cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 Nancy Salgaso, Chief Operator Licensing and Human Performance Branch (IOLB)Mail Stop O-6-F-2 Division of Inspection and Regional Support (DIRS)U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission ATTN: Mr. Alan Wang, NRR/DORL (w/2)Mail Stop OWFN/8 B1 Washington, D.C. 20555-0001 U. S. Nuclear Regulatory Commission ATTN: Ms. Laura Hurley 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 U.S. Nuclear Regulatory Commission ATTN: Mr. Elmo E. Collins, Jr.612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 U. S. Nuclear Regulatory Commission ATTN: Mr. Mark Haire 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Grand Gulf Nuclear Station 50-416 P.O. Box 756 Port Gibson, MS 39150 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2014 Cy 2015 Cy 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2 0 1 3 CY 2 0 1 4 CY 2 0 1 5 CY 2 016 NUMBER OF REACTOR 0 4 5 4 OPERATORS NUMBER OF SENIOR REACTOR 15 13 8 2 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 11/11/2013 03/03/2014 11/09/2015 10/10/2016 ALTERNATE DATE 11/18/2013 03/10/2014 11/16/2015 10/17/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 21 0 0 0 13 0 0 0 CANDIDATES NRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER