| | number = ML13330A558 | | | number = ML13330A558 |
| | issue date = 11/26/2013 | | | issue date = 11/26/2013 |
| | title = Limerick Generating Station, Units 1 and 2 - Annual Commitment Change Summary Report | | | title = Annual Commitment Change Summary Report |
| | author name = Dougherty T J | | | author name = Dougherty T |
| | author affiliation = Exelon Generation Co, LLC | | | author affiliation = Exelon Generation Co, LLC |
| | addressee name = | | | addressee name = |
Line 14: |
Line 14: |
| | page count = 2 | | | page count = 2 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:SECY-00-045 RIS 2000-17 LG-13-147 November 26, 2013 |
| | |
| | U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 |
| | |
| | ==Subject:== |
| | Annual Commitment Change Summary Report |
| | |
| | This report summarizes Limerick changes to NRC commitments that meet the threshold for reporting for the period from July 1, 2012 to June 30, 2013. Changes to these commitments are performed using procedure LS-AA-110, Commitment Management , which employs the guidance provided in NEI 99-04, Guidelines for Managing NRC Commitment Changes. NEI 99-04 was approved by the NRC for licensee use by SECY-00-045, Acceptance of NEI 99-04, 'Guidelines for Managing NRC Commitments'. Licensees were informed that NEI 99-04 was an acceptable process for control of regulatory commitments by the issuance of RIS 2000-17, Managing Regulatory Commitments made by Power Reactor Licensees to the NRC Staff, on September 21, 2000. |
| | There are no new regulatory commitments contained in this letter. |
| | |
| | If you have any questions or require additional information, please do not hesitate to contact us. |
| | |
| | Sincerely, |
| | |
| | Original signed by |
| | |
| | Thomas J. Dougherty Vice President - Limerick Exelon Generation Company, LLC |
| | |
| | ==Attachment:== |
| | List of changes to NRC commitments cc: Administrator Region I, USNRC USNRC Senior Resident Inspector, LGS |
| | |
| | Attachment - List of changes to NRC commitments November 26, 2013 |
| | |
| | Page 1 of 1 LS-AA-110 Commitment Management, Section 4.7, "NRC Notification of Commitment Changes/Deletions," requires submittal of a written report once per calendar year. This report shall contain a summary of commitment changes that require NRC notification. |
| | |
| | The following commitment change was implemented between July 1, 2012 and June 30, 2013 and requires NRC notification. |
| | |
| | Commitment change tracking number: 2012-015 CT number: T03114 Commitment source document: NRC Inspection Report 50-352/87-18 and 87-12 Change: Deleted Requestor: Engineering |
| | |
| | ==Subject:== |
| | |
| | Procedure to Control Equipment Classification (Q-list) |
| | |
| | Statement of commitment: |
| | Amended Engineering and Research Department Procedure (ERDP) for revising the Limerick Unit 1 Project Q-List to meet commitments by the licensee which were associated with NRC Generic Letter 83-28, in order to administratively assign responsibility for Q-List revisions. |
| | Change to commitment: |
| | |
| | Deleted |
| | |
| | Justification for change: |
| | The commitment has been captured as part of an ongoing program that is subject to a revision review process (e.g., Station Qualified Reviewer (SQR)). Guidance remains in CC-MA-304 "Establishing and Maintaining Component Classification." The commitment |
| | |
| | has been met and the NRC has closed this unresolved issue.}} |
Latest revision as of 19:14, 21 June 2019
|
---|
Category:Letter
MONTHYEARML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . ML24093A0912024-04-17017 April 2024 Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24106A1832024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases 2024-09-06
[Table view] |
Text
SECY-00-045 RIS 2000-17 LG-13-147 November 26, 2013
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Annual Commitment Change Summary Report
This report summarizes Limerick changes to NRC commitments that meet the threshold for reporting for the period from July 1, 2012 to June 30, 2013. Changes to these commitments are performed using procedure LS-AA-110, Commitment Management , which employs the guidance provided in NEI 99-04, Guidelines for Managing NRC Commitment Changes. NEI 99-04 was approved by the NRC for licensee use by SECY-00-045, Acceptance of NEI 99-04, 'Guidelines for Managing NRC Commitments'. Licensees were informed that NEI 99-04 was an acceptable process for control of regulatory commitments by the issuance of RIS 2000-17, Managing Regulatory Commitments made by Power Reactor Licensees to the NRC Staff, on September 21, 2000.
There are no new regulatory commitments contained in this letter.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely,
Original signed by
Thomas J. Dougherty Vice President - Limerick Exelon Generation Company, LLC
Attachment:
List of changes to NRC commitments cc: Administrator Region I, USNRC USNRC Senior Resident Inspector, LGS
Attachment - List of changes to NRC commitments November 26, 2013
Page 1 of 1 LS-AA-110 Commitment Management, Section 4.7, "NRC Notification of Commitment Changes/Deletions," requires submittal of a written report once per calendar year. This report shall contain a summary of commitment changes that require NRC notification.
The following commitment change was implemented between July 1, 2012 and June 30, 2013 and requires NRC notification.
Commitment change tracking number: 2012-015 CT number: T03114 Commitment source document: NRC Inspection Report 50-352/87-18 and 87-12 Change: Deleted Requestor: Engineering
Subject:
Procedure to Control Equipment Classification (Q-list)
Statement of commitment:
Amended Engineering and Research Department Procedure (ERDP) for revising the Limerick Unit 1 Project Q-List to meet commitments by the licensee which were associated with NRC Generic Letter 83-28, in order to administratively assign responsibility for Q-List revisions.
Change to commitment:
Deleted
Justification for change:
The commitment has been captured as part of an ongoing program that is subject to a revision review process (e.g., Station Qualified Reviewer (SQR)). Guidance remains in CC-MA-304 "Establishing and Maintaining Component Classification." The commitment
has been met and the NRC has closed this unresolved issue.