| issue date = 11/21/2013
| issue date = 11/21/2013
| title = Technical Specifications and Technical Specifications Base Updates
| title = Technical Specifications and Technical Specifications Base Updates
| author name = Beaver B C
| author name = Beaver B
| author affiliation = Duke Energy Carolinas, LLC, Duke Energy Corp
| author affiliation = Duke Energy Carolinas, LLC, Duke Energy Corp
| addressee name =  
| addressee name =  

Revision as of 19:00, 21 June 2019

Technical Specifications and Technical Specifications Base Updates
ML13338A169
Person / Time
Site: Mcguire
Issue date: 11/21/2013
From: Beaver B
Duke Energy Carolinas, Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DUK133250072
Download: ML13338A169 (37)


Text

PRIORITY Normal DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW 1) 02361 QATS-MG01MM

2) 02388 BOB SCHOMAKER LYNCHBG, VA 3) 02532 RESIDENT NRC INSPECT MG01NRC 4) 03044 MCG DOC CNTRL MISC MAN MG05DM 5) 03614 MCG OPS PROCEDURE GP MG01OP 6) 03744 OPS TRNG MGR. MG03OT 7) 03759 U S NUC REG WASHINGTON, DC 8) 03796 SCIENTECH CLEARWTR, FL 9) 04698 D E BORTZ EC07R 10) 04809 MCG PLANT ENG. UBR. MG05SE 11) 05262 J L FREEZE MG011E 12) 05606J C MORTON MG01EP 13) 08103 WESTINGHOUSE ELECTRIC CO LLC 14) 09665 JON H THOMPSON, USNRC Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION TECHNICAL SPECIFICATIONS (TS)TECHNICAL SPECIFICATIONS BASES (TSB)RECORD RETENTION
  1. 421734 Page 2 of 2 Date: 11121/13 Document Transmittal
  1. DUK133250072 QA CONDITION

[] Yes

  • No OTHER ACKNOWLEDGEMENT REQUIRED 0 Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO: Duke Energy McGuire DCRM MGO2DM 13225 Hagers Ferry Road Huntersville, N.C. 28078 Rec'd By Date DOCUMENT NO QACOND REV #/ DATE DISTR CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 TOTAL TS 1.1-5 AMEND NO. 269/249 TS 3.7.1-3 AMDEND NO. 269/249 TSB 3.7.1 ENTIRE SECTION N/A N/A N/A 96 05/16/13 96 05/16113 129 104113 MADM-04B Vi V1 V1 Vi V3 V1 V1 Vi Vl Vi Vi 29______________________________________________

-________ I _____________

I _______________

i ____ L ____ I. ____ +/- ____ £ ____ J ____ C ____ +/- ____ .1 ____ -____ C ____ .1 ____ +/- ____ 1 ____ ________REMARKS: PLEASE UPDATE ACCORDINGLY.

FOL (U-2 ONLY) PLACE IN FRONT OF YOUR TS MANUAL TS LOEP REVISION 96 S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY: BCBEAVER MG01RC BCB/BRG)(f7 TSB LOES REVISION 118 October 31, 2013 MEMORANDUM To: All McGuire Nuclear Station Technical Specification (TS) and Tech Spec Bases (TSB) Manual Holders

Subject:

McGuire TS and TSB Updates Attention:

Facility Operating License (FOL) Included This distribution updates Unit 2 FOL only. Please place the updated copy in the front of your Technical Specification book. Please recycle your old Unit 2 copy. The FOL was updated to reflect Amendment 269/249.REMOVE TS Manual INSERT Unit 2 FOL TS LOEP (rev 95)TS 1.1-5 (one page only)TS 3.7.1-3 (one page only)TS Bases Manual LOES (rev 117)TSB 3.7.1 (entire section)Please call me if you have questions.

Bonnie Beaver Regulatory Compliance 875-4180 Unit 2 FOL (included in this package)TS LOEP (rev 96)TS 1.1-5 Amend No. 269/249 (one page only)TS 3.7.1-3 Amend No. 269/249 (one page only)LOES (rev 118)TSB 3.7.1 Rev 129 (entire section)

DUKE ENERGY CAROLINAS, LLC DOCKET NO. 50-370 MCGUIRE NUCLEAR STATION, UNIT 2 RENEWED FACILITY OPERATING LICENSE Renewed License No. NPF-17 1. The U.S. Nuclear Regulatory Commission (Commission), having previously made the findings set forth in License No. NPF-17 issued on March 3, 1983, has now found that: A. The application for renewed operating license filed by the Duke Energy Corporation*

complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I and all required notifications to other agencies or bodies have been duly made;B. Actions have been identified and have been or will be taken with respect to (1)managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1), and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21 (c), such that there is reasonable assurance that the activities authorized by the renewed operating license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the McGuire Nuclear Station, Unit 2 (facility or plant), and that any changes made to the plant's current licensing basis in order to comply with 10 CFR 54.29(a) are in accord with the Act and the Commission's regulations; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission; D. There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I;E. The licensee is technically qualified to engage in the activities authorized by this renewed operating license in accordance with the Commission's regulations set forth in 10 CFR Chapter I;Duke Energy Corporation converted to Duke Power Company LLC on April 3, 2006 and was re-named Duke Energy Carolinas, LLC as of October 1, 2006. Duke Energy Carolinas, LLC is the owner and operator of McGuire Nuclear Station, Unit 2. References to the "licensee" or "Duke" are to Duke Energy Carolinas, LLC.Renewed License No. NPF-17 Amendment No. 225 F. The licensee has satisfied the applicable provisions of 10 CFR Part 140,"Financial Protection Requirements and Indemnity Agreements", of the Commission's regulations; G. The issuance of this renewed operating license will not be inimical to the common defense and security or to the health and safety of the public;H. After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of this Renewed Facility Operating License No. NPF-17 is in accordance with 10 CFR Part 51, of the Commission's regulations and all applicable requirements have been satisfied; and, I. The receipt, possession, and use of source, byproduct and special nuclear material as authorized by this renewed operating license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40 and 70.2. Based on the foregoing findings and the Initial Decisions issued by the Atomic Safety and Licensing Board dated April 18, 1979, and May 26, 1981, and the Decision of the Atomic Safety and Licensing Appeal Board dated March 30, 1982, regarding this facility, Renewed Facility Operating License No. NPF-17 is hereby issued to Duke Energy Carolinas, LLC to read as follows: A. This renewed operating license applies to the McGuire Nuclear Station, Unit 2, a pressurized water reactor and associated equipment (the facility) owned and operated by Duke Energy Carolinas, LLC. The facility is located on the site in Mecklenburg County, North Carolina, on the shore of Lake Norman approximately 17 miles northwest of Charlotte, North Carolina, and is described in the Updated Final Safety Analysis Report, as supplemented and amended, and in the Environmental Report, as supplemented and amended.B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses Duke Energy Carolinas, LLC: (1) Pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use, and operate the facility at the designated location in Mecklenburg County, North Carolina, in accordance with the procedures and limitations set forth in this renewed operating license;(2) Pursuant to the Act and 10 CFR Part 70 to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Updated Final Safety Analysis Report, as supplemented and amended;(3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;Renewed License No. NPF-17 Amendment No. 225 (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproducts and special nuclear materials as may be produced by the operation of McGuire Nuclear Station, Units 1 and 2; and, (6) Pursuant to the Act and 10 CFR Parts 30 and 40, to receive, possess and process for release or transfer such byproduct material as may be produced by the Duke Training and Technology Center.C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level The licensee is authorized to operate the facility at a reactor core full steady state power level of 3469 megawatts thermal (100%).(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 251, are hereby incorporated into this renewed operating license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3) Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d), as revised on December 16, 2002, describes certain future activities to be completed before the period of extended operation.

Duke shall complete these activities no later than March 3, 2023, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

The Updated Final Safety Analysis Report supplement as revised on December 16, 2002, described above, shall be included in the next scheduled update to the Updated Final Safety Analysis Report required by 10 CFR 50.71(e)(4), following issuance of this renewed operating license.Until that update is complete, Duke may make changes to the programs described in such supplement without prior Commission approval, provided that Duke evaluates each such change pursuant to the criteria set forth in 10 CFR 50.59, and otherwise complies with the requirements in that section.Renewed License No. NPF-17 Amendment No. 251 (4) Fire Protection Program Duke Energy Carolinas, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility and as approved in the SER dated March 1978 and Supplements 2, 5, and 6 dated March 1979, April 1981, and February 1983, respectively, and the safety evaluation dated May 15, 1989, subject to the following provisions:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.(5) Protection of the Environment Before engaging in additional construction or operational activities which may result in a significant adverse environmental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement dated April 1976, the licensee shall provide written notification to the Office of Nuclear Reactor Regulation.

(6) Additional Conditions The Additional Conditions contained in Appendix B, as revised through Amendment No. 249, are hereby incorporated into this renewed operating license. Duke Energy Carolinas, LLC shall operate the facility in accordance with the Additional Conditions.

(7) Antitrust Conditions The licensee shall comply with the antitrust conditions delineated in Appendix C of this renewed operating license.(8) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas: A) Fire fighting response strategy with the following elements: 1. Pre-defined coordinated fire response strategy and guidance 2. Assessment of mutual aid fire fighting assets 3. Designated staging areas for equipment and materials 4. Command and control 5. Training of response personnel B) Operations to mitigate fuel damage considering the following:

1. Protection and use of personnel assets 2. Communications
3. Minimizing fire spread Renewed License No. NPF-17 Amendment No. 249 4. Procedures for implementing integrated fire response strategy 5. Identification of readily-available pre-staged equipment 6. Training on integrated fire response strategy 7. Spent fuel pool mitigation measures C) Actions to minimize release to include consideration of: 1. Water spray scrubbing 2. Dose to onsite responders D. Physical Protection Duke Energy Carolinas, LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The combined set of plans, which contains safeguards information protected under 10 CFR 73.21, is entitled: "Duke Energy Physical Security Plan" submitted by letter dated September 8, 2004, and supplemented on September 30, 2004, October 15, 2004, October 21, 2004, and October 27, 2004.Duke Energy Carolinas, LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).The Duke Energy Carolinas, LLC CSP was approved by License Amendment No. 244.E. Deleted by Amendment No. 215.F. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.G. In accordance with the Commission's direction in its Statement of Policy, Licensing and Regulatory Policy and Procedures for Environmental Protection:

Uranium Fuel Cycle Impacts, October 29, 1982, this renewed operating license is subject to the final resolution of the pending litigation involving Table S-3.See, Natural Resources Defense Council v. NRC, No. 74-1586 (D.C. cir. April 27,1982).H. The licensee is authorized to receive from the Oconee Nuclear Station, Units 1, 2, and 3, possess, and store irradiated Oconee fuel assemblies containing special nuclear material, enriched to not more than 3.24% by weight U-235 subject to the following conditions:

a. Oconee fuel assemblies may not be placed in the McGuire Nuclear Station, Unit 1 and 2, reactors.b. Irradiated fuel shipped to McGuire Nuclear Station, Units 1 and 2, from Oconee shall have been removed from the Oconee reactor no less than 270 days prior to shipment.Renewed License No. NPF-17 Amendment No. 244 c. No more than 300 Oconee irradiated fuel assemblies shall be received for storage at McGuire Nuclear Station.d. Burnup of Oconee fuel shipped shall be no greater than 36,000 MW days per metric ton.e. Receipt of irradiated Oconee fuel shall be limited by the use of the NFS-4 (NAC-1), NLI-1/2, TN-8, or TN-8L spent fuel casks.f. The spent fuel pool crane travel shall be restricted by administrative controls to the paths required by Selected Licensee Commitment 16.9.20 whenever a spent fuel cask is being handled.g. Oconee fuel assemblies may not be transferred from one McGuire spent fuel pool to the other.3. This renewed operating license is effective as of the date of issuance and shall expire at midnight on March 3, 2043.FOR THE NUCLEAR REGULATORY COMMISSION J.E. Dyer, Director Office of Nuclear Reactor Regulation

Attachment:

1. Appendix A -Technical Specifications
2. Appendix B -Additional Conditions
3. Appendix C -Antitrust Conditions Date of Issuance:

December 5, 2003 Renewed License No. NPF-17 APPENDIX B ADDITIONAL CONDITIONS FACILITY OPERATING LICENSE NO. NPF-17 Duke Energy Carolinas, LLC shall comply with the following conditions on the schedules noted below: Amendment Additional Implementation Number Conditions Date 166 The schedule for the performance of new and Within 90 days of revised surveillance requirements shall be as the date of this follows: amendment.

For surveillance requirements (SRs) that are new in Amendment No. 166 the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment No. 166. For SRs that existed prior to Amendment No. 166, including SRs with modified acceptance criteria and SRs whose intervals of performance are being extended, the first performance is due at the end of the first surveillance interval that begins on the date the surveillance was last performed prior to implementation of amendment No. 166. For SRs that existed prior to Amendment No. 166, whose intervals of performance are being reduced, the first reduced surveillance interval begins upon completion of the first surveillance performed after implementation of Amendment No. 166.Renewed License No. NPF-17 Amendment No. 238 B-1 APPENDIX B ADDITIONAL CONDITIONS FACILITY OPERATING LICENSE NO. NPF-17 Duke Energy Carolinas, LLC shall comply with the following conditions on the schedules noted below: Amendment Additional Implementation Number Conditions Date 229 Upon implementation of the Amendment adopting See Condition TSTF-448, Revision 3, the determination of control room envelope (CRE) unfiltered inleakage as required by SR 3.7.9.4, in accordance with TS 5.5.16.c.(i), the assessment of CRE habitability as required by TS 5.5.16.c.(ii), and the measurement of CRE pressure as required by TS 5.5.16.d, shall be considered met.Following implementation: (a) The first performance of SR 3.7.9.4 in accordance with TS 5.5.16.c.(i), shall be within the specified Frequency of 6 years, plus the 18 month allowance of SR 3.0.2, as measured from October 2003, the date of the most recent successful tracer gas test, as stated in the February 19, 2004 letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.(b) The first performance of the periodic assessment of CRE habitability, TS 5.5.16.c.(ii), shall be within 3 years, plus the 9 month allowance of SR 3.0.2 as measured from October 2003, the date of the most recent successful tracer gas test, as stated in the February 19, 2004 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.(c) The first performance of the periodic measurement of CRE pressure, TS 5.5.16.d, shall be within 18 months, plus the 138 days allowed by SR 3.0.2, as measured from January 2007, the date of the most recent successful pressure measurement test, or within 138 days if not performed previously.

Renewed License No. NPF-17 Amendment No. 229 B-2 APPENDIX B ADDITIONAL CONDITIONS FACILITY OPERATING LICENSE NO. NPF-17 Duke Energy Carolinas, LLC shall comply with the following conditions on the schedules noted below: Amendment Additional Implementation Number Conditions Date 249 The Licensee shall perform an analysis, in the form See Condition of either a topical report or site-specific analysis, describing how the current P-T limit curves at 34 Effective Full Power Years (EFPY) for McGuire Unit 2 and the methodology used to develop these curves considered all Reactor Vessel (RV)materials (beltline and non-beltline) and the lowest service temperature of all ferritic Reactor Coolant Pressure Boundary (RCPB) materials, as applicable, consistent with the requirements of 10 CFR Part 50, Appendix G. This analysis shall be provided to the NRC within one year after NRC approval of the March 5, 2012 McGuire Measurement Uncertainty Recapture (MUR)License Amendment Request.Renewed License No. NPF-17 Amendment No. 249 I B-3 APPENDIX C ANTITRUST CONDITIONS Pursuant to an Order by the Atomic Safety and Licensing Board, dated April 23, 1975, the Nuclear Regulatory Commission incorporates in Operating License NPF-17 the following antitrust conditions:

a. The licensee makes the commitments contained herein, recognizing that bulk power supply arrangements between neighboring entities normally tend to serve the public interest.

In addition, where there are net benefits to all participants such arrangements also serve the best interests of each of the participants.

Among the benefits of such transactions are increased electric system reliability, a reduction in the cost of electric power, and minimization of the environmental effects of the production and sale of electricity.

Any particular bulk power supply transaction may afford greater benefits to one participant than to another. The benefits realized by a small system may be proportionately greater than those realized by a larger system. The relative benefits to be derived by the parties from a proposed transaction, however, should not be controlling upon a decision with respect to the desirability of participating in the transaction.

Accordingly, the licensee will enter into proposed bulk power transactions of the types hereinafter described which, on balance, provide net benefits to the licensee.

There are net benefits in a transaction if the licensee recovers the cost of the transaction (as defined in subparagraph (1)(d) hereof) and there is no demonstrable net detriment to the licensee arising from the transaction.

(1) As used herein: (a) "Bulk Power" means electric power and any attendant energy, supplied or made available at transmission or sub-transmission voltage by one electric system to another.(b) "Neighboring Entity" means a private or public corporation, a governmental agency or authority, a municipality, a cooperative, or a lawful association of any of the foregoing owning or operating, or proposing to own or operate, facilities for the generation and transmission of electricity which meets each of the following criteria: (1) its existing or proposed facilities are economically and technically feasible of interconnection with those of the licensee and (2) with the exception of municipalities, cooperatives, governmental agencies or authorities, and associations, it is, or upon commencement of operations will be, a public utility and subject to regulation with respect to rates and service under the laws of North Carolina or South Carolina or under the Federal Power Act; provided, however, that as to associations, each member of such association is either a public utility as discussed in this clause (2) or C-1 a municipality, a cooperative or .a governmental agency or authority.(c) Where the phrase "neighboring entity" is intended to include entities engaging or proposing to engage only in the distribution of electricity, this is indicated by adding the phrase "including distribution systems." (d) "Cost means any appropriate operating and maintenance expenses, together with all other costs, including a reasonable return on the licensee's investment, which are reasonably allocable to a transaction.

However, no value shall be included for loss of revenue due to the loss of any wholesale or retail customer as a result of any transaction hereafter described.

(2) (a) The licensee will interconnect and coordinate reserves by means of the sale and exchange of emergency and scheduled maintenance bulk power with any neighboring entity(ies), when there are net benefits to each party, on terms that will provide for all of the licensee's properly assignable costs as may be determined by the Federal Energy Regulatory Commission and consistent with such cost assignment will allow the other party the fullest possible benefits of such coordination.(b) Emergency service and/or scheduled maintenance service to be provided by each party will be furnished to the fullest extent available from the supplying party and desired by the party in need. The licensee and each party will provide to the other emergency service and/or scheduled maintenance service if and when available from its own generation and, in accordance with recognized industry practice, from generation of other to the extent it can do so without impairing service to its customers, including other electric systems to whom it has firm commitments.(c) Each party to a reserve coordination arrangement will establish its own reserve criteria, but in no event shall the minimum installed reserve on each system be less than 15%, calculated as a percentage of estimated peak load responsibility.

Either party, if it has, or has firmly planned, installed reserves in excess of the amount called for by its own reserve criterion, will offer any such excess as may in fact be available at the time for which it is sought and for such period as the selling party shall determine for purchase in accordance with reasonable industry practice by the other party to meet such other party's own reserve requirements.

The parties will provide such amounts of spinning reserve as may be adequate to avoid the imposition of unreasonable demands on the other part(ies) in meeting the normal contingencies of operating its (their) system(s).

However, in no circumstances shall such spinning reserve requirement exceed the installed reserve requirement.(d) Interconnections will nof'6e limited to low voltages when higher voltages are C-2 available from the licensee's installed facilities in the area where interconnection is desired and when the proposed arrangement is found to be technically and economically feasible.(e) Interconnection and reserve coordination agreements will not embody provisions which impose limitations upon the use or resale of power and energy sold or exchanged pursuant to the agreement.

Further, such arrangements will not prohibit the participants from entering into other interconnection and coordination arrangements, but may include appropriate provisions to assure that (i) the licensee receives adequate notice of such additional interconnection or coordination, (ii)the parties will jointly consider and agree upon such measures, if any, as are reasonably necessary to protect the reliability of the interconnected systems and to prevent undue burdens from being imposed on any system, and (iii) the licensee will be fully compensated for its costs. Reasonable industry practice as developed in the area from time to time will satisfy this provision.

(3) The licensee currently has on file, and may hereafter file, with the Federal Energy Regulatory Commission contracts with neighboring entity(ies) providing for the sale and exchange of short-term power and energy, limited term power and energy, economy energy, non- displacement energy, and emergency capacity and energy. The Licensee will enter into contracts providing for the same or for like transactions with any neighboring entity on terms which enable the licensee to recover the full costs allocable to such transaction.

(4) The licensee currently sells capacity and energy in bulk on a full requirements basis to several entities engaging in the distribution of electric power at retail. In addition, the licensee supplies electricity directly to ultimate users in a number of municipalities.

Should any such entity(ies) or municipality(ies) desire to become a neighboring entity as defined in subparagraph (1)(b) hereof (either alone or through combination with others), the licensee will assist in facilitating the necessary transition through the sale of partial requirements firm power and energy to the extent that, except for such transition, the licensee would otherwise be supplying firm power and energy. The provision of such firm partial requirements service shall be under such rates, terms and conditions as shall be found by the Federal Energy Regulatory Commission to provide for the recovery of the licensee's cost. The licensee will sell capacity and energy in bulk on a full requirements basis to any municipality currently served by the licensee when such municipality lawfully engages in the distribution of electric power at retail.(5) (a) The licensee will facilitate the exchange of electric power in bulk in wholesale transactions over its transmission facilities (1) between or among two or more neighboring entities including distribution systems with which it is interconnected or may be interconnected in the future, and (2) between any such entity(ies) and any other electric system engaging in bulk power supply between whose facilities the licensee's transmission C-3 lines and other transmission lines would form a continuous electric path, provided that permission to utilize such other transmission lines has been obtained.

Such transaction shall be undertaken provided that the particular transaction reasonably can be accommodated by the licensee's transmission system from a functional and technical standpoint and does not constitute the wheeling of power to a retail customer.

Such transmission shall be on terms that fully compensate the licensee for its cost. Any entity(ies) requesting such transmission arrangements shall give reasonable notice of its (their) schedule and requirements.(b) The licensee will include in its planning and construction program sufficient transmission capacity as required for the transactions referred to in subparagraph (a) of this paragraph, provided that (1) the neighboring entity(ies) gives the licensee sufficient advance notice as may be necessary reasonably to accommodate its (their) requirements from a functional and technical standpoint and (2) that such entity(ies) fully compensate the licensee for its cost. In carrying out this subparagraph (b), however, the licensee shall not be required to construct or add transmission facilities which (a) will be of no demonstrable present or future benefit to the licensee, or (b) which could be constructed by the requesting entity(ies) without duplicating any portion of the licensee's existing transmission lines, or (c) which would jeopardize the licensee's ability to finance or construct on reasonable terms facilities needed to meet its own anticipated system requirements.

Where regulatory or environmental approvals are required for the construction or addition of transmission facilities needed for the transactions referred to in subparagraph (a) of this paragraph it shall be the responsibility of the entity(ies) seeking the transaction to participate in obtaining such approvals, including sharing in the cost thereof.(6) To increase the possibility of achieving greater reliability and economy of electric generation and transmission facilities, the licensee will discuss load projections and system development plans with any neighboring entity(ies).

(7) When the licensee's plans for future nuclear generating units (for which application will hereafter be made to the Nuclear Regulatory commission) have reached the stage of serious planning, but before firm decisions have been made as to the size and desired completion date of the proposed nuclear units, the licensee will notify all neighboring entities including distribution systems with peak loads smaller than the licensee's that the licensee plans to construct such nuclear units. Neither the timing nor the information provided need be such as to jeopardize obtaining the required site at the lowest possible cost.The foregoing commitments shall be implemented in a manner consistent with the provisions of the Federal Power Act and all other lawful local, state and Federal regulation and authority.

Nothing in these commitments is intended to determine in advance the resolution of issues which are properly raised at the Federal Energy Regulatory Commission concerning such commitments, C-4 including allocation of costs or the rates to be charged. The licensee will negotiate (including the execution of a contingent statement of intent) with respect to the foregoing commitments with any neighboring entity including distribution systems where applicable engaging in or proposing to engage in bulk power supply transactions, but the licensee shall not be required to enter into any final arrangement prior to resolution of any substantial questions as to the lawful authority of an entity to engage in the transactions.

In addition, the licensee shall not be obligated to enter into a given bulk power supply transaction if: (1) to do so would violate, or incapacitate it from performing, and existing lawful contracts it has with a third party; (2) there is contemporaneously available to it a competing or alternate arrangement which affords it greater benefits which would be mutually exclusive of such arrangement; (3) to do so would adversely affect its system operations or the reliability of power supply to its customers, or (4) if to do so would jeopardize the licensee's ability to finance or construct on reasonable terms facilities needed to meet its own anticipated system requirements.

C-5 McGuire Nuclear Station Technical Specifications LOEP Page Number Amendment iv iii iv 1.1-1 1.1-2 1.1-3 1.1-4 1.1-5 1.1-6 1.1-7 1.2-1 1.2-2 1.2-3 1.3-1 1.3-2 1.3-3 1.3-4 1.3-5 1.3-6 1.3-7 1.3-8 1.3-9 1.3-10 1.3-11 1.3-12 1.3-13 1.4-1 1.4-2 1.4-3 1.4-4 2.0-1 243/224 237/219 184/166 184/166 184/166 266/246 237/219 194/175 269/249 261/241 194/175 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 184/166 219/201 Revision Date 7/26/07 3/1/07 9/30/98 9/30/98 9/30/98 6/25/12 3/1/07 9/18/00 5/16/13 3/29/11 9/18/00 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 1/14/04 McGuire Units 1 and 2 Page I Revision 96 Page Number Amendment Revision Date 3.0-1 3.0-2 3.0-3 3.0-4 3.0-5 3.1.1-1 3.1.2-1 3.1.2-2 3.1.3-1 3.1.3-2 3.1.3-3 3.1.4-1 3.1.4-2 3.1.4-3 3.1.4-4 3.1.5-1 3.1.5-2 3.1.6-1 3.1.6-2 3.1.6-3 3.1.7-1 3.1.7-2 3.1.8-1 3.1.8-2 3.2.1-1 3.2.1-2 3.2.1-3 3.2.1-4 3.2.1-5 3.2.2-1 3.2.2-2 3.2.2-3 3.2.2-4 3.2.3-1 238/220 221/203 238/220 205/186 221/203 261/241 184/166 261/241 184/166 184/166 184/166 184/166 184/166 261/241 261/241 184/166 261/241 184/166 184/166 261/241 184/166 184/166 184/166 261/241 184/166 184/166 261/241 261/241 261/241 184/166 184/166 261/241 261/241 261/241 3/29/07 4/29/04 3/29/07 8/12/02 4/29/04 3/29/11 9/30/98 3/29/11 9/30/98 9/30/98 9/30/98 9/30/98 9/30/98 3/29/11 3/29/11 9/30/98 3/29/11 9/30/98 9/30/98 3/29/11 9/30/98 9/30/98 9/30/98 3/29/11 9/30/98 9/30/98 3/29/11 3/29/11 3/29/11 9/30/98 9/30/98 3/29/11 3/29/11 3/29/11 McGuire Units 1 and 2 Page 2 Revision 96 Page Number 3.2.4-1 3.2.4-2 3.2.4-3 3.2.4-4 3.3.1-1 3.3.1-2 3.3.1-3 3.3.1-4 3.3.1-5 3.3.1-6 3.3.1-7 3.3.1-8 3.3.1-9 3.3.1-10 3.3.1-11 3.3.1-12 3.3.1-13 3.3.1-14 3.3.1-15 3.3.1-16 3.3.1-17 3.3.1-18 3.3.1-19 3.3.1-20 3.3.2-1 3.3.2-2 3.3.2-3 3.3.2-4 3.3.2-5 3.3.2-6 3.3.2-7 3.3.2-8 3.3.2-9 3.3.2-10 McGuire Units 1 and 2 Amendment 184/166 184/166 184/166 261/241 184/166 248/228 248/228 216/197 250/230 248/228 248/228 184/166 261/241 261/241 261/241 261/241 261/241 257/237 257/237 257/237 268/248 219/201 219/201 184/166 184/166 250/230 248/228 248/228 248/228 198/179 198/179 261/241 261/241 265/245 Page 3 Revision Date 9/30/98 9/30/98 9/30/98 3/29/11 9/30/98 3/9/09 3/9/09 7/29/03 3/9/09 3/9/09 3/9/09 9/30/98 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 8/2/10 8/2/10 8/2/10 10/1/12 1/14/04 1/14/04 9/30/98 9/30/98 3/9/09 3/9/09 3/9/09 3/9/09 4/12/01 4/12/01 3/29/11 3/29/11 9/1 2/11 Revision 96 Page Number Amendment Revision Date 3.3.2-11 3.3.2-12 3.3.2-13 3.3.2-14 3.3.2-15 3.3.3-1 3.3.3-2 3.3.3-3 3.3.3-4 3.3.4-1 3.3.4-2 3.3.4-3 3.3.5-1 3.3.5-2 3.3.6-1 3.4.1-1 3.4.1-2 3.4.1-3 3.4.1-4 3.4.2-1 3.4.3-1 3.4.3-2 3.4.3-3 3.4.3-4 3.4.3-5 3.4.3-6 3.4.3-7 3.4.3-8 3.4.4-1 3.4.5-1 3.4.5-2 3.4.5-3 3.4.6-1 3.4.6-2 265/245 265/245 265/245 265/245 265/245 221/203 227/209 261/241 227/209 221/203 261/241 184/166 184/166 261/241 Not Used -243/224 219/201 219/201 261/241 219/201 184/166 214/195 261/241 214/195 214/195 214/195 214/195 214/195 214/195 261/241 216/197 216/197 261/241 216/197 261/241 9/12/11 9/12/11 9/12/11 9/12/11 9/12/11 4/29/04 4/4/05 3/29/11 4/4/05 4/29/04 3/29/11 9/30/98 9/30/98 3/29/11 7/26/07 1/14/04 1/14/04 3/29/11 1/14/04 9/30/98 7/3/03 3/29/11 7/3/03 7/3/03 7/3/03 7/3/03 7/3/03 7/3/03 3/29/11 7/29/03 7/29/03 3/29/11 7/29/03 3/29/11 McGuire Units 1 and 2 Page 4 Revision 96 Page Number Amendment Revision Date 3.4.7-1 3.4.7-2 3.4.7-3 3.4.8-1 3.4.8-2 3.4.9-1 3.4.9-2 3.4.10-1 3.4.10-2 3.4-11-1 3.4.11-2 3.4-11-3 3.4.11-4 3.4.12-1 3.4.12-2 3.4.12-3 3.4.12-4 3.4.12-5 3.4.12-6 3.4.13-1 3.4.13-2 3.4.14-1 3.4.14-2 3.4.14-3 3.4.14-4 3.4.15-1 3.4.15-2 3.4.15-3 3.4.15-4 3.4.16-1 3.4.16-2 3.4.17-1 3.4.18-1 3.4.18-2 216/197 216/197 261/241 216/197 261/241 184/166 261/241 184/166 184/166 221/203 184/166 184/166 261/241 184/166 221/203 214/195 214/195 261/241 261/241 237/219 261/241 184/166 184/166 261/241 261/241 235/217 235/217 235/217 261/241 266/246 266/246 261/241 237/219 237/219 7/29/03 7/29/03 3/29/11 7/29/03 3/29/11 9/30/98 3/29/11 9/30/98 9/30/98 4/29/04 9/30/98 9/30/98 3/29/11 9/30/98 4/29/04 7/3/03 7/3/03 3/29/11 3/29/11 3/1/07 3/29/11 9/30/98 9/30/98 3/29/11 3/29/11 9/30/06 9/30/06 9/30/06 3/29/11 6/25/12 6/25/12 3/29/11 3/1/07 3/1/07 McGuire Units 1 and 2 Page 5 Revision 96 Page Number Amendment Revision Date 3.5.1-1 218/200 12/23/03 3.5.1-2 261/241 3/29/11 3.5.2-1 184/166 9/30/98 3.5.2-2 261/241 3/29/11 3.5.2-3 261/241 3/29/11 3.5.3-1 221/203 4/29/04 3.5.3-2 184/166 9/30/98 3.5.4-1 184/166 9/30/98 3.5.4-2 9/12/11 9/12/11 3.5.5-1 184/166 9/30/98 3.5.5-2 261/241 3/29/11 3.6.1-1 207/188 9/4/02 3.6.1-2 207/188 9/4/02 3.6.2-1 184/166 9/30/98 3.6.2-2 184/166 9/30/98 3.6.2-3 184/166 9/30/98 3.6.2-4 184/166 9/30/98 3.6.2-5 261/241 3/29/11 3.6.3-1 243/224 7/26/07 3.6.3-2 184/166 9/30/98 3.6.3-3 184/166 9/30/98 3.6.3-4 184/166 9/30/98 3.6.3-5 261/241 3/29/11 3.6.3-6 261/241 3/29/11 3.6.3-7 207/188 9/4/02 3.6.4-1 261/241 3/29/11 3.6.5-1 184/166 9/30/98 3.6.5-2 261/241 3/29/11 3.6.6-1 9/12/11 9/12/11 3.6.6-2 9/12/11 9/12/11 3.6.7-1 Not Used -227/209 4/4/05 3.6.8-1 221/203 4/29/04 3.6.8-2 261/241 3/29/11 3.6.9-1 184/166 9/30/98 McGuire Units 1 and 2 Page 6 Revision 96 Page Number Amendment Revision Date 3.6.9-2 3.6.10-1 3.6.10-2 3.6.11-1 3.6.11-2 3.6.12-1 3.6.12-2 3.6.12-3 3.6.13-1 3.6.13-2 3.6.13-3 3.6.14-1 3.6.14-2 3.6.14-3 3.6.15-1 3.6.15-2 3.6.16-1 3.6.16-2 3.7.1-1 3.7.1-2 3.7.1-3 3.7.2-1 3.7.2-2 3.7.3-1 3.7.3-2 3.7.4-1 3.7.4-2 3.7.5-1 3.7.5-2 3.7.5-3 3.7.5-4 3.7.6-1 3.7.6-2 3.7.7-1 261/241 184/166 261/241 261/241 261/241 261/241 261/241 261/241 256/236 261/241 261/241 228/210 270/250 261/241 184/166 261/241 261/241 261/241 184/166 184/166 269/249 184/166 184/166 184/166 184/166 221/203 261/241 221/203 184/166 261/241 261/241 184/166 261/241 184/166 3/29/11 9/30/98 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 6/28/10 3/29/11 3/29/11 4/5/05 7/16/13 3/29/11 9/30/98 3/29/11 3/29/11 3/29/11 9/30/98 9/30/98 5/16/13 9/30/98 9/30/98 9/30/98 9/30/98 4/29/04 3/29/11 4/29/04 9/30/98 3/29/11 3/29/11 9/30/98 3/29/11 9/30/98 McGuire Units 1 and 2 Page 7 Revision 96 Page Number Amendment Revision Date 3.7.7-2 3.7.8-1 3.7.8-2 3.7.9-1 3.7.9-2 3.7.9-3 3.7.10-1 3.7.10-2 3.7.11-1 3.7.11-2 3.7.12-1 3.7.12-2 3.7.13-1 3.7.14-1 3.7.15-1 3.7.15-2 3.7.15-3 3.7.15-4 3.7.15-5 3.7.15-6 3.7.15-7 3.7.15-8 3.7.15-9 3.7.15-10 3.7.15-11 3.7.15-12 3.7.15-13 3.7.15-14 3.7.15-15 3.7.15-16 3.7.15-17 3.7.15-18 3.7.15-19 3.7.15-20 261/241 261/241 261/241 249/229 249/229 261/241 184/166 261/241 229/211 261/241 261/241 261/241 261/241 261/241 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 3/29/11 3/29/11 3/29/11 1/30/09 1/30/09 3/29/11 9/30/98 3/29/11 6/2/05 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 McGuire Units 1 and 2 Page 8 Revision 96 Page Number Amendment Revision Date 3.7.15-21 3.7.15-22 3.7.15-23 3.7.15-24 3.7.15-25 3.7.15-26 3.7.15-27 3.7.15-28 3.7.15-29 3.7.15-30 3.7.15-31 3.7.15-32 3.7.16-1 3.8.1-1 3.8.1-2 3.8.1-3 3.8.1-4 3.8.1-5 3.8.1-6 3.8.1-7 3.8.1-8 3.8.1-9 3.8.1-10 3.8.1-11 3.8.1-12 3.8.1-13 3.8.1-14 3.8.1-15 3.8.2-1 3.8.2-2 3.8.2-3 3.8.3-1 3.8.3-2 3.8.3-3 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 225/207 261/241 221/203 184/166 241/-184/166 261/241 261/241 261/241 261/241 261/241 261/241 261/241 261/241 261/241 261/241 261/241 184/166 216/197 184/166 184/166 267/247 261/241 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/17/05 3/29/11 4/29/04 9/30/98 6/8/07 9/30/98 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 3/29/11 9/30/98 7/29/03 9/30/98 9/30/98 9/29/12 3/29/11 McGuire Units 1 and 2 Page 9 Revision 96 Page Number Amendment Revision Date 3.8.4-1 184/166 9/30/98 3.8.4-2 261/241 3/29/11 3.8.4-3 261/241 3/29/11 3.8.4-4 260/240 12/20/10 3.8.5-1 184/166 9/30/98 3.8.5-2 216/197 7/29/03 3.8.6-1 184/166 9/30/98 3.8.6-2 261/241 3/29/11 3.8.6-3 261/241 3/29/11 3.8.6-4 184/166 9/30/98 3.8.7-1 261/241 3/29/11 3.8.8-1 184/166 9/30/98 3.8.8-2 261/241 3/29/11 3.8.9-1 184/166 9/30/98 3.8.9-2 261/241 3/29/11 3.8.10-1 216/197 7/29/03 3.8.10-2 261/241 3/29/11 3.9.1-1 261/241 3/29/11 3.9.2-1 261/241 3/29/11 3.9.3-1 216/197 7/29/03 3.9.3-2 261/241 3/29/11 3.9.4-1 236/218 12/22/06 3.9.4-2 261/241 3/29/11 3.9.5-1 216/197 7/29/03 3.9.5-2 261/241 3/29/11 3.9.6-1 216/197 7/29/03 3.9.6-2 261/241 3/29/11 3.9.7-1 261/241 3/29/11 4.0.1 225/207 3/17/05 4.0.2 225/207 3/17/05 5.1-1 213/194 6/6/03 5.2-1 239/221 04/12/07 5.2-2 253/233 9/21/09 5.3-1 213/194 6/6/03 McGuire Units 1 and 2 Page 10 Revision 96 Page Number 5.4-1 5.5-1 5.5-2 5.5-3 5.5-4 5.5-5 5.5-6 5.5-7 5.5-8 5.5-9 5.5-10 5.5-11 5.5-12 5.5-13 5.5-14 5.5-15 5.5-16 5.6-1 5.6-2 5.6-3 5.6-4 5.6-5 5.7-1 5.7-2 Amendment 184/166 244/193 212/193 184/166 184/166 223/205 252/232 237/219 237/219 237/219 237/219 237/219 237/219 237/219 249/229 261/241 261/241 226/208 226/208 226/208 230/212 237/219 213/194 184/166 Revision Date 9/30/98 2/13/08 5/8/03 9/30/98 9/30/98 8/5/04 8/17/09 3/1/07 3/1/07 3/1/07 3/1/07 3/1/07 3/1/07 3/1/07 1/30/09 3/29/11 3/29/11 3/1/07 3/1/07 3/1/07 8/23/05 3/1/07 6/6/03 9/30/98 McGuire Units 1 and 2 Page I11 Revision 96 Definitions 1.1 1.1 Definitions (continued)

QUADRANT POWER TILT RATIO (QPTR)RATED THERMAL POWER (RTP)REACTOR TRIP SYSTEM (RTS) RESPONSE TIME SHUTDOWN MARGIN (SDM)QPTR shall be the ratio of the maximum upper excore detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater.RTP shall be a total reactor core heat transfer rate to the reactor coolant of 3411 MWt.*The RTS RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its RTS trip setpoint at the channel sensor until loss of stationary gripper coil voltage. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured.

In lieu of measurement, response time may be verified for selected components provided that the components and the methodology for verification have been previously reviewed and approved by the NRC.SDM shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming: a. All rod cluster control assemblies (RCCAs) are fully inserted except for the single RCCA of highest reactivity worth, which is assumed to be fully withdrawn.

However, with all RCCAs verified fully inserted by two independent means, it is not necessary to account for a stuck RCCA in the SDM calculation.

With any RCCA not capable of being fully inserted, the reactivity worth of the RCCA must be accounted for in the determination of SDM; and b. In MODES 1 and 2, the fuel and moderator temperatures are changed to the nominal zero power design level.A SLAVE RELAY TEST shall consist of energizing each slave relay and verifying the OPERABILITY of each slave relay. The SLAVE RELAY TEST shall include, as a minimum, a continuity check of associated testable actuation devices.I SLAVE RELAY TEST* Following implementation of MUR on the respective Unit, the value of RTP shall be 3469 MWt.McGuire Units 1 and 2 1.1-5 Amendment Nos. 269/249 MSSVs 3.7.1 Table 3.7.1-1 (page 1 of 1)OPERABLE Main Steam Safety Valves versus Maximum Allowable Power Range Neutron Flux High Setpoints in Percent of RATED THERMAL POWER MINIMUM NUMBER OF MSSVs PER STEAM GENERATOR REQUIRED OPERABLE MAXIMUM ALLOWABLE POWER RANGE NEUTRON FLUX HIGH SETPOINTS

(% RTP)4 < 57 3 < 38 2 <19 Table 3.7.1-2 (page 1 of 1)Main Steam Safety Valve Lift Settings VALVE NUMBER LIFT SETTING (psig +/- 3%)STEAM GENERATOR A B C D SV-20 SV-14 SV-8 SV-2 1170 SV-21 SV-15 SV-9 SV-3 1190 SV-22 SV-16 SV-10 SV-4 1205 SV-23 SV-17 SV-1 1 SV-5 1220 SV-24 SV-18 SV-12 SV-6 1225 McGuire Units 1 and 2 3.7.1-3 Amendment Nos. 269/249 McGuire Nuclear Station Technical Specification Bases LOES TS Bases are revised by section Page Number Revision Revision Date BASES (Revised per section)i Revision 87 8/15/07 ii Revision 87 8/15/07 iii Revision 87 8/15/07 B 2.1.1 Revision 51 01/14/04 B 2.1.2 Revision 109 9/20/10 B 3.0 Revision 81 3/29/07 B 3.1.1 Revision 115 3/29/11 B 3.1.2 Revision 115 3/29/11 B 3.1.3 Revision 10 9/22/00 B 3.1.4 Revision 115 3/29/11 B 3.1.5 Revision 115 3/29/11 B 3.1.6 Revision 115 3/29/11 B 3.1.7 Revision 58 06/23/04 B 3.1.8 Revision 115 3/29/11 B 3.2.1 Revision 115 3/29/11 B 3.2.2 Revision 115 3/29/11 B 3.2.3 Revision 115 3/29/11 B 3.2.4 Revision 115 3/29/11 B 3.3.1 Revision 124 10/1/12 B 3.3.2 Revision 122 10/25/12 B 3.3.3 Revision 122 10/25/12 B 3.3.4 Revision 115 3/29/11 B 3.3.5 Revision 115 3/29/11 B 3.3.6 Not Used -Revision 87 6/29/06 B 3.4.1 Revision 115 3/29/11 B 3.4.2 Revision 0 9/30/98 B 3.4.3 Revision 115 3/29/11 B 3.4.4 Revision 115 3/29/11 B 3.4.5 Revision 115 3/29/11 McGuire Units 1 and 2 Page 1 Revisioi n118 Page Number Amendment B 3.4.6 B 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10 B 3.4.11 B 3.4.12 B 3.4.13 B 3.4.14 B 3.4.15 B 3.4.16 B 3.4.17 B 3.4.18 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.5.5 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.6.6 B 3.6.7 B 3.6.8 B 3.6.9 B 3.6.10 B 3.6.11 B 3.6.12 B 3.6.13 B 3.6.14 B 3.6.15 B 3.6.16 Revision 115 Revision 115 Revision 115 Revision 115 Revision 102 Revision 115 Revision 115 Revision 126 Revision 115 Revision 115 Revision 121 Revision 115 Revision 86 Revision 115 Revision 116 Revision 57 Revision 122 Revision 115 Revision 53 Revision 115 Revision 115 Revision 115 Revision 115 Revision 122 Not Used -Revision 63 Revision 115 Revision 115 Revision 120 Revision 122 Revision 115 Revision 115 Revision 115 Revision 125 Revision 115 Revision Date 3/29/11 3/29/11 3/29/11 3/29/11 8/17/09 3/29/11 3/29/11 5/1/13 3/29/11 3/29/11 8/5/09 3/29/11 6/25/07 3/29/11 8/18/11 4/29/04 10/25/12 3/29/11 2/17/04 3/29/11 3/29/11 3/29/11 3/29/11 10/25/12 4/4/05 3/29/11 3/29/11 4/26/12 10/25/12 3/29/11 3/29/11 3/29/11 10/19/12 3/29/11 McGuire Units 1 and 2 Page 2 Revision 118 Page Number Amendment Revision Date B 3.7.1 Revision 129 10/24/13 B 3.7.2 Revision 105 2/22/10 B 3.7.3 Revision 102 8/17/09 B 3.7.4 Revision 115 3/29/11 B 3.7.5 Revision 115 3/29/11 B 3.7.6 Revision 127 8/2/13 B 3.7.7 Revision 115 3/29/11 B 3.7.8 Revision 128 10/2/13 B 3.7.9 Revision 120 4/26/12 B 3.7.10 Revision 115 3/29/11 B 3.7.11 Revision 115 3/29/11 B 3.7.12 Revision 115 3/29/11 B 3.7.13 Revision 115 3/29/11 B 3.7.14 Revision 115 3/29/11 B 3.7.15 Revision 66 6/30/05 B 3.7.16 Revision 115 3/29/11 B 3.8.1 Revision 115 3/29/11 B 3.8.2 Revision 92 1/28/08 B 3.8.3 Revision 123 9/29/12 B 3.8.4 Revision 115 3/29/11 B 3.8.5 Revision 41 7/29/03 B 3.8.6 Revision 115 3/29/11 B 3.8.7 Revision 115 3/29/11 B 3.8.8 Revision 115 3/29/11 B 3.8.9 Revision 115 3/29/11 B 3.8.10 Revision 115 3/29/11 B 3.9.1 Revision 115 3/29/11 B 3.9.2 Revision 115 3/29/11 B 3.9.3 Revision 115 3/29/11 B 3.9.4 Revision 115 3/29/11 B 3.9.5 Revision 115 3/29/11 B 3.9.6 Revision 115 3/29/11 B 3.9.7 Revision 115 3/29/11 McGuire Units 1 and 2 P ag 3-Revision 118 MSSVs B 3.7.1 B 3.7 PLANT SYSTEMS B 3.7.1 Main Steam Safety Valves (MSSVs)BASES BACKGROUND The primary purpose of the MSSVs is to provide overpressure protection for the secondary system. The MSSVs also provide protection against overpressurizing the reactor coolant pressure boundary (RCPB) by providing a heat sink for the removal of energy from the Reactor Coolant System (RCS) if the preferred heat sink, provided by the Condenser and Circulating Water System, is not available.

Five MSSVs are located on each main steam header, outside containment, upstream of the main steam isolation valves, as described in the UFSAR, Section 10.3.1 (Ref. 1). The MSSV capacity criteria is 110% of rated steam flow at 110% of the steam generator design pressure.

This meets the requirements of the ASME Code,Section III (Ref. 2). The MSSV design includes staggered setpoints, according to Table 3.7.1-2 in the accompanying LCO, so that only the needed valves will actuate. Each valve is orificed to a size of either 12.174 or 16.0 square inches. Staggered setpoints reduce the potential for valve chattering that is due to steam pressure insufficient to fully open all valves following a turbine reactor trip.APPLICABLE SAFETY ANALYSES The design basis for the MSSVs comes from Reference 2 and its purpose is to limit the secondary system pressure to 5 110% of design pressure when passing 100% of design steam flow. This design basis is sufficient to cope with any anticipated operational occurrence (AOO) or accident considered in the Design Basis Accident (DBA) and transient analysis.The events that challenge the relieving capacity of the MSSVs, and thus RCS pressure, are those characterized as decreased heat removal events, which are presented in the UFSAR, Section 15.2 (Ref. 3). Of these, the full power turbine trip without steam dump is the limiting AOO.The transient response for turbine trip without a direct reactor trip presents no hazard to the integrity of the RCS or the Main Steam System.The reactor is tripped on high pressurizer pressure in the peak primary pressure case. In this case, the pressurizer safety valves open, and RCS pressure remains below 110% of the design value. The MSSVs also open to limit the secondary steam pressure.McGuire Units 1 and 2 B 3.7. 1-1 Revision No. 129 MSSVs B 3.7.1 BASES APPLICABLE SAFETY ANALYSES (continued)

For the peak secondary pressure case, the reactor is tripped on overtemperature AT. Pressurizer relief valves and MSSVs are activated and prevent overpressurization in the primary and secondary systems.The MSSVs satisfy Criterion 3 of 10 CFR 50.36 (Ref. 4).LCO The accident analysis assumes five MSSVs per steam generator to provide overpressure protection for design basis transients occurring at 3479 MWt. An MSSV will be considered inoperable if it fails to open on demand. The LCO requires that five MSSVs be OPERABLE in compliance with Reference 2, even though this is not a requirement of the DBA analysis.

This is because operation with less than the full number of MSSVs requires limitations on allowable THERMAL POWER (to meet ASME Code requirements).

These limitations are according to Table 3.7.1-1 in the accompanying LCO, and Required Action A.1 and A.2.The OPERABILITY of the MSSVs is defined as the ability to open within the setpoint tolerances, relieve steam generator overpressure, and reseat when pressure has been reduced. The OPERABILITY of the MSSVs is determined by periodic surveillance testing in accordance with the Inservice Testing Program.The lift settings, according to Table 3.7.1-2 in the accompanying LCO, correspond to ambient conditions of the valve at nominal operating temperature and pressure.This LCO provides assurance that the MSSVs will perform their designed safety functions to mitigate the consequences of accidents that could result in a challenge to the RCPB.APPLICABILITY In MODE 1, the number of MSSVs per steam generator required to be OPERABLE must be according to Table 3.7.1-1 in the accompanying LCO. In MODES 2 and 3, only two MSSVs per steam generator are required to be OPERABLE.In MODES 4 and 5, there are no credible transients requiring the MSSVs.The steam generators are not normally used for heat removal in MODES 5 and 6, and thus cannot be overpressurized; there is no requirement for the MSSVs to be OPERABLE in these MODES.McGuire Units I and 2 B 3.7.1-2 Revision No. 129 MSSVs B 3.7.1 BASES ACTIONS The ACTIONS table is modified by a Note indicating that separate Condition entry is allowed for each MSSV.A.1 and A.2 With one or more MSSVs inoperable, reduce power so that the available MSSV relieving capacity meets Reference 2 requirements for the applicable THERMAL POWER.Operation with less than all five MSSVs OPERABLE for each steam generator is permissible, if THERMAL POWER is proportionally limited to the relief capacity of the remaining MSSVs. This is accomplished by restricting THERMAL POWER so that the energy transfer to the most limiting steam generator is not greater than the available relief capacity in that steam generator.

For example, if one MSSV is inoperable in one steam generator, the relief capacity of that steam generator is reduced by approximately 20%. To offset this reduction in relief capacity, energy transfer to that steam generator must be similarly reduced. This is accomplished by reducing THERMAL POWER by the necessary amount to conservatively limit the energy transfer to all steam generators, consistent with the relief capacity of the most limiting steam generator.

The maximum power level specified for the power range neutron flux high trip setpoint with inoperable MSSVs must ensure that power is limited to less than the heat removal capacity of the remaining OPERABLE MSSVs. The reduced high flux trip setpoint also ensures that the reactor trip occurs early enough in the loss of load/turbine trip event to limit primary to secondary heat transfer and preclude overpressurization of the primary and secondary systems. To calculate this power level, the governing equation is the relationship q = m Ah, where q is the heat input from the primary side, m is the steam flow rate and Ah is the heat of vaporization at the steam relief pressure (assuming no subcooled feedwater).

The algorithm use is consistent with the recommendations of the Westinghouse Nuclear Safety Advisory Letter, NSAL-94-001, dated January 20, 1994 (Ref. 6).Additionally, the calculated values are reduced by 9% to account for instrument and channel uncertainties.

The allowed Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> provides an acceptable time to reach the required power level from full power operation without allowing the plant to remain in an unacceptable condition for an extended period of time and provides sufficient time to reduce the trip setpoints.

The adjustment of the trip setpoints is a sensitive operation that may inadvertently trip the Reactor Protection System.McGuire Units 1 and 2 B 3.7.1-3 Revision No. 129 MSSVs B 3.7.1 BASES ACTIONS (continued)

B.1 and B.2 If the MSSVs cannot be restored to OPERABLE status within the associated Completion Time, or if one or more steam generators have less than two MSSVs OPERABLE, the unit must be placed in a MODE in which the LCO does not apply. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.SURVEILLANCE SR 3.7.1.1 REQUIREMENTS This SR verifies the OPERABILITY of the MSSVs by the verification of each MSSV lift setpoint in accordance with the Inservice Testing Program. The ASME OM Code (Ref. 5) requires that safety and relief valve tests be performed.

According to Reference 5, the following tests are required: a. Visual examination;

b. Seat tightness determination;
c. Setpoint pressure determination (lift setting);d. Compliance with seat tightness criteria; and e. Verification of the balancing device integrity on balanced valves.The ASME Standard requires that all valves be tested every 5 years, and a minimum of 20% of the valves be tested every 24 months. The ASME OM Code specifies the activities and frequencies necessary to satisfy the requirements.

Table 3.7.1-2 allows a + 3% setpoint tolerance for OPERABILITY; however, the valves are reset to + 1% during the Surveillance to allow for drift.This SR is modified by a Note that allows entry into and operation in MODE 3 prior to performing the SR. The MSSVs may be either bench tested or tested in situ at hot conditions using an assist device to simulate lift pressure.

If the MSSVs are not tested at hot conditions, the lift setting pressure shall be corrected to ambient conditions of the valve at operating temperature and pressure.McGuire Units 1 and 2 B 3.7.1-4 Revision No. 129 MSSVs B 3.7.1 BASES REFERENCES

1. UFSAR, Section 10.3.1.2. ASME, Boiler and Pressure Vessel Code,Section III, Article NC-7000, Class 2 Components.
3. UFSAR, Section 15.2.4. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
5. ASME Code for Operation and Maintenance of Nuclear Power Plants.6. Westinghouse Nuclear Safety Advisory Letter, NSAL-94-001, Dated January 20, 1994.McGuire Units 1 and 2 B 3.7.1-5 Revision No. 129