ML16243A352

From kanterella
Jump to navigation Jump to search
Technical Specification 3.4.18, Amendment Nos. 284/263, Steam Generator (SG) Tube Integrity.
ML16243A352
Person / Time
Site: Mcguire, McGuire  Duke energy icon.png
Issue date: 08/17/2016
From:
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16243A352 (3)


Text

'

Date: 8l17l2Q1§ Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-003871

1. Boyer, Robert P
2. Carroll, Michael E DOCUMENT TRANSMITTAL FORM

Purpose:

Issue Released By:

3. Gardner, Troy R Facility: MCGUIRE NUCLEAR STATION Duke Energy
4. Gibby, Lori C SUBJECT 13225 Hi!g~rs Feri:y RQi!d
5. Helton, Daniel E Issue MNS-TS-3.4.l8 Rev.1 Document Management
6. Mc Ginnis, Vickie L MG02DM
7. MCG DOC CNTRL MISC MAN Huntersville, NC 28078
8. MCG OPS PROCEDURE GP MNSDCRM@duke-energy.com
9. MCG PLANT ENG. UBR.
10. MCG RAD PROT
11. Morton, Jill C
12. OPS HUMAN PERFORMANCE -
13. OPS TRNG MGR.
14. QATS-
15. RESIDENT NRC INSPECT
16. SERV BLDG FILE ROOM -
17. U S NUC REG WASHINGTON, DC
18. USNRC '*
19. WESTINGHOUSE ELECTRIC CO LLC Page 1of1

__ , ,.---~ .. '~. ~~::*t..; ;"' ,._., ~---:.; ~~~~-'~,~~:~fJ,~'.t x:,,ix },:;,~'* ':* 1ilfF"' t< ~ ,, c'.*'\6.+~"'i:. '*' l*:li:A: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 t.,Icl'J,<r{c:~~Mr\JS;q*~~~l~~i~'mP!it:~'.'JS$.U~I) (~ :X,~':<';;}!~:\;;*~-; FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE FYIIE FYIIE FYIIE R&All FYIIE PRINl lllllE R&AIE R&All R&AIE Remarks: MNS Tech Sgec. - Amendment 284£263

SG Tube Integrity 3.4.18 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.18 Steam Generator (SG) Tube Integrity LCO 3.4.18 SG tube integrity shall be maintained.

All SG tubes satisfying the tube plugging criteria shall be plugged in accordance with the Steam Generator Program.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS


NOTE-----------------------------------------------------------

Separate Condition entry is allowed for each SG tube.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SG tubes A.1 Verify tube integrity of the 7 days satisfying the tube affected tube(s) is plugging criteria and not maintained until the next plugged in accordance refueling outage or SG with the Steam tube inspection.

Generator Program.

AND A.2 Plug the affected tube(s) in Prior to entering accordance with the Steam MODE 4 following the Generator Program. next refueling outage or SG tube inspection B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.

B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR SG tube integrity not maintained.

McGuire Units 1 and 2 3.4.18-1 Amendment Nos. 284/263

SG Tube Integrity 3.4.18 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.18.1 Verify SG tube integrity in accordance with the In accordance Steam Generator Program. with the Steam Generator Program SR 3.4.18.2 Verify that each inspected SG tube that satisfies the Prior to entering tube plugging criteria is plugged in accordance with MODE 4 following the Steam Generator Program. a SG tube inspection McGuire Units 1 and 2 3.4.18-2 Amendment Nos. 284/263