MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17284A9101999-10-13013 October 1999 Application for Amend to License NPF-21,revising TS 3.3.6.1, Table 3.3.6.1-1, Primary Containment Isolation Instrumentation. Footnote (D) Is Removed Since Both Inboard & Outboard Trip Sys Are Now Functional in All Modes ML17284A8501999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17284A8471999-07-29029 July 1999 Application for Amend to License NPF-21,revising Tech Specs SR 3.5.2.2, Condensate Storage Tank Water Level. ML17284A8441999-07-29029 July 1999 Application for Amend to License NPF-21,revising TS Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & 5.a. ML17284A8431999-07-29029 July 1999 Application for Amend to License NPF-21,removing License Condition 2.C.(16),Attachment 2,Item 3(b) Re post-accident Neutron Flux Monitoring ML17284A8401999-07-29029 July 1999 Application for Amend to License NPF-21,amending Tech Specs SR 3.8.4.6 of TS 3.8.5, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17292B6891999-06-0303 June 1999 Application for Amend to License NPF-21,reflecting Change in Name of Washington Public Power Supply Sys to Energy Northwest.Marked-up Copy of Affected Pages of OL for Plant, Encl ML17292B6441999-04-20020 April 1999 Application for Amend to License NPF-21,revising TS 3.4.11 to Replace Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6321999-04-0707 April 1999 Application for Amend to License NPF-21,requesting Mod to MCPR Safety Limits by 990930 to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B4861998-12-17017 December 1998 Application for Amend to License NPF-21,revising TS SR 3.8.1.8 to Allow for Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML17284A8071998-11-0909 November 1998 Supplemental Application for Amend to License NPF-21, Requesting Minor Wording Changes to Clarify Intent of Proposed New License Section 2.B.(6).Addl Info That Describes Physical Storage of Matls,Encl ML17284A7161998-08-0505 August 1998 Application for Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7051998-07-17017 July 1998 Application for Exigent Amend to License NPF-21,modifying TS SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc, Battery E-B1-2 ML17292B3401998-04-16016 April 1998 Application for Amend to License NPF-21,modifying Requirement That cold-worked Austenitic Stainless Steel Used in Newly Designed ECCS Pump Suction Strainers Must Have Yield Strength Not Greater than 90,000 Psi ML17292B1301997-12-0404 December 1997 Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage ML17292B0261997-08-14014 August 1997 Application for Amend to License NPF-21,modifying Inservice Testing Requirements Specified in TS 5.5.6 for Inboard Primary Containment Isolation Valve on Transvering in-core Probe (TIP) Sys Nitrogen Purge Line ML17292A9401997-07-16016 July 1997 Application for Amend to License NPF-21,adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 Efpys.Changes Support Vessel Leak Testing ML17292A8631997-05-20020 May 1997 Application for Amend to License NPF-21,requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A7561997-03-22022 March 1997 Application for Amend to License NPF-21,modifying Response Time Testing Surveillance Requirements for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A5491996-10-15015 October 1996 Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl ML17292A5381996-10-10010 October 1996 Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials ML17292A4081996-08-0909 August 1996 Requests Amend to License NPF-21,revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 GO2-96-089, Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage1996-04-24024 April 1996 Application for Amend to License NPF-21,modifying TS to Support Cycle 12,scheduled to Begin Subsequent to Spring 1996 Outage ML17291B2781996-03-19019 March 1996 Application for Amend to License NPF-21,revising Containment Leakage Testing ML17291B2071996-01-19019 January 1996 Application for Amend to License NPF-21 Re Primary Containment Leakage Testing GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC1995-12-0808 December 1995 Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC ML17291B0921995-10-26026 October 1995 Application for Amend to License NPF-21,revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A8421995-06-0606 June 1995 Application for Amend to License NPF-21,changing TS 6.0, Administrative Controls by Revising Assistant Managing Director,Operations & Plant Manager Position Titles ML17291A8381995-06-0606 June 1995 Application for Amend to License NPF-21,modifying Index of TS by Deleting Ref to Bases Pages.Future Changes to Bases Info Will Be Evaluated Per 10CFR50.59 ML17291A8321995-06-0606 June 1995 Application for Amend to License NPF-21,modifying TS 6.9.3.2 by Adding Re to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications,Consistent W/Gl 88-16 ML17291A7551995-04-25025 April 1995 Application for Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SRs to Tables 3.3.2-1,3.3.2-2 & 4.3.2.1-1 ML17291A4791994-10-31031 October 1994 Application for Amend to License NPF-21,revising TSs to Relocate Safety/Relief Valve Position Indication Instrumentation Requirements ML17291A4741994-10-31031 October 1994 Application for Amend to License NPF-21,revising TS 3/4.1.3.1, Reactivity Control Sys. ML17291A4201994-09-26026 September 1994 Suppl to 930709 Application for Amend to License NPF-21 Re Increase in Power Operation,Changing Power/Flow Maps in TS 3/4.2.6,3/4.2.7,3/4.2.8 & 3/4.4.1 & Bases to Reflect Use of Siemens Power Corp Staif Code for Stability Analysis ML17291A3941994-09-18018 September 1994 Application for Amend to License NPF-21,changing TS Table 3.6.3-1 Re Primary Containment Isolation Valve Requirements ML17291A3171994-08-0808 August 1994 Application for Amend to License NPF-21,amending TS 4.0.5, Surveillance Requirements for Inservice Insp & Testing Program. ML17291A2151994-07-12012 July 1994 Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits ML17291A2201994-07-0808 July 1994 Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances ML17290B1711994-05-0606 May 1994 Application for Amend to License NPF-21,revising TSs 3/4.3.7.5,3/4.4.2 & 3/4.5.1 for Main Steam Relief Valve Position Indication ML17290B1551994-05-0505 May 1994 Application for Amend to License NPF-21,requesting Mod of Three Equipment Piece Numbers Included in Table 3.6.3-1, Primary Containment Isolation Valves. ML17290A9631994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS to Support Hydrostatic Testing ML17290A9601994-02-17017 February 1994 Application for Amend to License NPF-21,revising TS Section 6.0, Administrative Controls, Including Changing Reporting Relationship for QA Functions in Section 6.2.1.e of TS from Managing Director to Assistant Managing Director,Operations ML17290A9551994-02-0808 February 1994 Application for Amend to License NPF-21,consisting of Changes to TS Table 3.6.3-1,for RCIC-V-8,increasing Stroke Time from 13 Seconds to 26 Seconds & Deleting Note (J) Reference from RCIC-V-8 & RCIC-V-63 ML17290A9031994-01-13013 January 1994 Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation. ML17290A8961994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements ML17290A8781994-01-0606 January 1994 Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures ML17290A8921994-01-0606 January 1994 Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 ML17290A8391993-12-20020 December 1993 Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys. ML17290A8181993-12-0606 December 1993 Application for Amend to License NPF-21,requesting TS Surveillance Requirement 4.6.6.1.b.3 Be Revised to Provide Appropriate Acceptance Criteria for Demonstrating Operability of Primary Containment Hydrogen Recombiner Sys ML17290A8221993-12-0606 December 1993 Application for Amend to License NPF-21,adding Footnote to TS Table 4.3.7.5-1, Accident Monitoring Instrumentation Srs, Exempting Channel Calibr of Safety/Relief Valve Position Indicators from Spec 4.0.4 for 24 H 1999-07-29
[Table view] |
Text
ACCELERATED DISTRIBUTION DEMONSTPATION SYSH~m REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9004100281 DOC.DATE: 90/03/30 NOTARIZED:
YES FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000397 R
SUBJECT:
Application for amend to License NPF-21,replacing surveillance requirements 4.8.1.1.2.b,c
&d.DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR Q ENCL l SIZE:~TITLE: OR Submittal:
General Distribution NOTES~D'/RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E/EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 5 5 6 6 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 A D D S D NOTE TO ALL"RIDS" RECIPIENTS:
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE, DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISIRIBUTION
'ISTS FOR DOCUMENTS YOU DON'T NEED t TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 March 30, 1990 Docket No.50-397 G02-90-065 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
Subject:
NUCLEAR PLANT NO.2, OPERATING LICENSE NPF-21 RE(UEST FOR AMENDMENT TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 4.8.1.1.2
Reference:
Letter, RB Samworth (NRR)to GC Sorensen (SS),"Issuance of Amendment 76 to Facility Operating License No.NPF-21-WPPSS Project No.2 (TAC No.75564)", dated February 22, 1990 The reference responded to an emergency technical specification amendment request and subsequent temporary waiver of compliance by providing an alternative method of performing the subject surveillance until May 30, 1990.It further stated that the NRC expected the Supply System to submit a new technical specification amendment application to be effective when the interim technical specification expired.Accordingly, and per the Code of Federal Regulations, Title 10 Parts 50.90 and 2.101, the Supply System hereby submits a request for amendment to the WNP-2 Technical Specifications.
Specifically, the Supply System is requesting that surveillance requirements 4.8.1.1.2.b, c and d be replaced, as attached, to allow a more comprehensive and effective fuel oil surveillance program to be implemented at WNP-2.The significant items of this requested change are: 1)more frequent check and removal of accumulated water, if found, from the fuel storage tanks;2)increased frequency and a different method for testing stored fuel (ASTM D2276 on a 31-day schedule in lieu of ASTM D2274 on a quarterly schedule);
3)modifications to the procedure and acceptance criteria for new fuel oil addition to the storage tanks;4)addition of alternate test methods for determining'ome fuel oil properties; and 5)deletion of tests on stored fuel oil which do not serve to determine the impact of the fuel condition on diesel generator operability.
The benefits in implementing the proposed changes are an increased and more effective ability to detect unsatisfactory fuel oil, testing that can be performed onsite with more immediate results, and testing that is simpler to perform.9004l00281 900330 PDR ADOCK 05000397 P PDC goo/l/I l
t Page Two REQUEST FOR AMENDMENT TO TS SURVEILLANCE RE(UIREHENT 4.8.1.1.2 The change in frequency for checking and removing accumulated free water in the fuel storage tanks reduces the possibility of bacteria contamination of the stored fuel, minimizes the formation of corrosion products and prevents water from contaminating the fuel oil transfer system and the diesel generator fuel systems.The quarterly checks for accumulated water in the tanks have proven negative sine'e the tanks were installed (approximately 9 years ago).Further, the water table at the WNP-2 site is significantly below the tanks (the water table is at 380 feet and the bottoms of the tanks are at 422.5 feet)which eliminates this potential source of water contamination.
Increasing the frequency of checking for and removal, if necessary, of any'free water accumulation in the storage tanks adds,to the conservatism of the present testing program.The present technical specifications do not specify where the fuel is to be tested for free water accumulation.
The proposed change specifies that the fuel will be sampled below the transfer pump suction which is believed to be the most desireable location.Also, as the current design has no provision to drain the tanks, the pumping out of accumulated water is specified.
The use of ASTH D2276 in lieu of D2274 for testing stored fuel provides a better indication of the present fuel conditions in the storage tanks.ASTM D2276 indicates the condition of the fuel in terms of particulates which could impair diesel generator operability.
ASTH D2274 has been recognized to be of limited value with regard to fuel suitability for immediate use.ASTH D2274 test results are an indication of the tendency of fuel oil to degrade (oxidize and form particulates) during long term storage.The test results are not an indication of actual particulate matter present in the fuel oil.The accuracy of the test is questionable and it is more commonly used as a means of quality assurance at refineries.
As presently used ASTH D2274 samples are required quarterly.
Use of ASTH D2276 on a monthly frequency provides better data on fuel condition at the time of the test as well as any p'articulates formed during storage.Hence ASTH D2276 sampling on a monthly basis is more conservative than the presently required ASTH D2274 test on a quarterly basis.ASTH D2276 recommends, where possible, filtering of 3.785 to 5 liters of fuel.The time required to filter this amount of fuel is excessive and therefore only I to 2 liters of fuel will be used.Also, the analysis may be performed using an equivalent solvent such as T,T,4-Trinethylpentane or Isooctane for ease of testing.Modifications to the procedure and acceptance criteria for new fuel oil additions are also proposed to simplify testing of new fuel, provide immediate assurance of the quality of fuel being delivered, and continued quality of stored fuel.The present technical specifications require that new fuel additions meet the properties specified in ASTH D975-77.This standard and ASTH D975-81 included in the requested changes, recognize ASTH D1796,"Test for Water and Sediment in Crude Oils and Fuel Oils by Centrifuge" as providing criteria for acceptance of Page Three REQUEST FOR ANENDNENT TO TS SURVEILLANCE RE(VIRESCENT 4.8.1.1.2 new fuel.This test can be performed on site and provides a good indicator of fuel quality.However, it can be time consuming with respect to the ASTH D4176-82"Clear and Bright" test.This test is recognized by the NRC staff and industry as an equally acceptable test for recognizing the presence of water and sediment contaminants in new fuel.Accordingly, the Supply System proposes that satisfactory results from either test will indicate acceptability with respect to water and sediment contaminants.
Because both tests have been found acceptable, the addition of the"Clear and Bright" test to the acceptance criteria for new fuel remains conservative.
The addition of a flash point test provides additional confirmation that new fuel is acceptable and within specification limits, thereby reducing the possibility of adding"bad" fuel to that already in storage.With this additional test the acceptance criteria for new fuel remain conserva'tive relative to that presently required by the WNP-2 Technical Specifications.'n optional method of verifying gravity prior to storing is proposed for 4.8.1.1.2.c.I.a to simplify new fuel acceptance procedures.
This would involve testing and comparing the test results with the suppliers certification.
The justification for this change is that any contamination during transportation, i.e.after certification by the supplier, would be recognized by changes in flash point, viscosity, or appearance.
As discussed above, contamination that alters the appearance of the fuel oil will be detected in the water and sediment test or the"Clear and Bright" test.The flash point test will provide additional indication that the new fuel oil is within specification limits and has not been contaminated.
A viscosity measurement within limits provides further confirma-tion that the new fuel is acceptable.
Hence, given satisfactory results on these tests, verification of fuel oil gravity by testing and comparing to the supplier's certification provides the necessary assurance that the new fuel is within specification limits.Thus, verification of fuel oil gravity by optional methods as proposed is acceptable.
At present, the WNP-2 Technical Specifications require new fuel to be tested to ensure that the properties listed in ASTH D975-77 are met with the test results available within 14 days after sampling.The proposed change recognizes that those properties having the most detrimental and immediate impact on fuel performance (flash point, viscosity,"gravity, and water and sediment)are checked for conformance prior to addition of the fuel to the storage tanks.The remaining properties are those which might impact fuel performance only on a long term basis.Hence an extension of time from 14 to 31 days to obtain indications of acceptability for long term fuel performance has no impact on fuel suitability during the additional 17-day interval.The proposed changes to the Technical Specifications include deleting the requirement for testing of stored fuel oil in accordance with ASTH D975 requirements on a 92-day basis.The rationale for this deletion is that the fuel oil properties which can effect diesel generator performance (flash point, cetane, viscosity and cloud point)do not change during storage.If these properties are within specification when the fuel oil is placed in storage, they will remain within specification unless other non-specification petroleum products are added to the storage tanks.The addition of non-specification petroleum products is precluded by the proposed new fuel surveillance program
P'age Four RE/VEST FOR AMENDMENT TO TS SURVEILLANCE REgUIREHENT 4.8.1.1.2 as detailed above.Over a prolonged period stored fuel can oxidize and form particulates which, in significant concentrations, could impair diesel generator performance.
Particulate and bacterial concentrations are parameters that can change in stored fuel oil.Particulate concentrations will be monitored every 31 days as discussed previously.
Bacteria growth will be prevented by periodic checking for and removal of free water, if necessary, from the storage tanks.Considering that the fuel oil properties will not change in storage, and that fuel oil conditions which could affect diesel generator operation will be closely monitored (on a 31-day basis), further testing of stored fuel in accordance with ASTH D975 every 92 days will not provide any additional data nor improve diesel generator reliability.
As such, it is proposed that this additional testing be deleted.By ASTH 0975-77, as specified in the present technical specifications, sulfur content analysis may only be performed using ASTM D129 to verify acceptability.
Federal diesel specification VV-F-800C and ASTH 0396,"Specification for Fuel Oil", allow the use of ASTH D1552-79 and ASTH D2262-82 tests for sulfur determination in No.2 grade fuel oil.The attached technical specification change proposes to allow the use of these tests as a substitute for ASTH D129.These tests, in use at numerous laboratories, can be performed more rapidly than ASTH D129.The ASTM D129 test may be utilized when the two tests provide conflicting results.This substitution has been found acceptable by the NRC staff on other dockets.Use of these tests will provide equivalent results to those obtained by the use of ASTH D129.In summary, the proposed changes provide a more comprehensive program for determining fuel oil properties than that presently required by the WNP-2 Technical Specifications.
New fuel additions wil,l meet flash point, viscosity, gravity, and water and" sediment requirements prior to addition to'he storage tanks.The combination of these requirements is more stringent than that presently required.Further, the continuous addition of high quality fuel (with these properties satisfied) t'o the storage tanks combined with the monthly monitoring ensures that the fuel remains suitable for immediate use.Water in the storage tanks, although not expected, will be checked monthly versus quarterly and removed as necessary.
As discussed above, stored fuel properties will be verified on a monthly basis by a testing method that reflects immediate suitability of the fuel instead of a long term tendency to oxidize and evolve particulates.
The proposed changes provide a more conservative, accurate determination of fuel oil properties than that presently approved for use at WNP-2.The Supply System has evaluated this amendment request per 10CFR 50.92 and determined that it does not represent a significant hazard because it does not: 1)Involve a significant increase in the probability or consequences of an accident previously evaluated.
As discussed above the proposed program represents a more comprehensive, accurate method for determining fuel suitability.
As such, the adoption of this program cannot impact the probability or consequences of an accident previously evaluated because the fuel supporting the operability of the diesel generators (utilized in accident analysis)will be tested to a more conservative program.As such, diesel generator operability continues to be maintained.
f,k 4)~kk k k kf t.f I Ik Ik Page Five XEQUEST FOR AHENDHENT TO TS SURVEILLANCE REQUIREMENT 4.8.1.1.2 2)Create the possibility of a new or different kind of accident from any accident previously evaluated.
The design function and operation of the DG fuel oil system is not affected by this change.There are no new modes of operation introduced.
The reliability of the DG system to provide an emergency source of power is not reduced as no fuel oil acceptance or long term storage criteria are being compromised.
As discussed above the proposed program will provide a more accurate assessment of fuel oil suitability.
Hence no new or different kind of accidents from any previously evaluated are introduced by this change.)i 3)Involve a significant reduction in a margin of safety.No reduction in the margin of safety is involved as this, proposed change provides a more comprehensive program for determining fuel oil"properties and their impact on diesel generator operabil.ity.
As such, this program helps assure that reliability and operability of the diesel generators are maintained.
As discussed above, the Supply System considers that this change does not involve a significant hazards consideration, nor is there a potential for significant change in the types or significant increase in the amount of any effluents that may be released offsite, nor does it involve a significant increase in individual or cumulative occupational radiation exposure.Accordingly, the proposed change meets the eligibility criteria for categorical exclusion set forth in 10CFR 51.22(c)(9) and therefore, per lOCFR 51.22(b), an environmental assessment of the change is not required.This Technical Specification change has been reviewed and approved by the WNP-2 Plant Operations Committee (POC)and the Supply System Corporate Nuclear Safety Review Board (CNSRB).In accordance with 10CFR 50.91, the State of Washington has been provided a copy of this letter.Very truly yours, I G.C.Sorensen, Manager Regulatory Programs PLP/bk Attachments cc: JB Hartin-NRC RV NS Reynolds-BCP&R RB Samworth-NRC DL Williams-BPA/399 NRC Site Inspector-901A C Eschels-EFSEC