|
|
Line 24: |
Line 24: |
| Completion of Confirmatory Action Letter Actions Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-035 1. Letter, NRC to Entergy Nuclear Operations, Inc., "Confirmatory Action Letter -Pilgrim Nuclear Power Station," dated August 2, 2017 (ML 172114A088) | | Completion of Confirmatory Action Letter Actions Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-035 1. Letter, NRC to Entergy Nuclear Operations, Inc., "Confirmatory Action Letter -Pilgrim Nuclear Power Station," dated August 2, 2017 (ML 172114A088) |
| : 2. Letter, NRC to Entergy Nuclear Operations, Inc., "Confirmatory Action Letter (EA-17-086) | | : 2. Letter, NRC to Entergy Nuclear Operations, Inc., "Confirmatory Action Letter (EA-17-086) |
| Follow-Up Inspection Report 05000293/2018013," dated January 23, 2019 (ML 19023A057) | | Follow-Up Inspection Report 05000293/2018013," dated January 23, 2019 (ML19023A057) |
| In Reference 1, the U.S. Nuclear Regulatory Commission (NRC) provided a Confirmatory Action Letter (CAL) approving the commitments Entergy Nuclear Operations, Inc. (Entergy) had made concerning improvement actions at the Pilgrim Nuclear Power Station. Since that time, Entergy has completed all of the actions specified in the CAL. The NRC conducted five CAL follow-up inspections and concluded in Reference 2 that all 156 Confirmatory Action Letter actions and their 11 associated Area Action Plans are complete. | | In Reference 1, the U.S. Nuclear Regulatory Commission (NRC) provided a Confirmatory Action Letter (CAL) approving the commitments Entergy Nuclear Operations, Inc. (Entergy) had made concerning improvement actions at the Pilgrim Nuclear Power Station. Since that time, Entergy has completed all of the actions specified in the CAL. The NRC conducted five CAL follow-up inspections and concluded in Reference 2 that all 156 Confirmatory Action Letter actions and their 11 associated Area Action Plans are complete. |
| In accordance with Item 4 of Reference 1, Entergy hereby notifies the NRC that we have completed all of the actions addressed in the CAL. There are no new regulatory commitments made in this letter. | | In accordance with Item 4 of Reference 1, Entergy hereby notifies the NRC that we have completed all of the actions addressed in the CAL. There are no new regulatory commitments made in this letter. |
| Letter No. 2.19.015 Page 2 of 2 If you have any questions on this letter, please contact Mr. Peter J. Miner at (508) 830-7127. | | Letter No. 2.19.015 Page 2 of 2 If you have any questions on this letter, please contact Mr. Peter J. Miner at (508) 830-7127. |
| Sincerely, ~Jtx-Brian R. Sullivan BRS/pm cc: USNRC Document Control Desk USNRC Resident Inspector, Pilgrim}} | | Sincerely, ~Jtx-Brian R. Sullivan BRS/pm cc: USNRC Document Control Desk USNRC Resident Inspector, Pilgrim}} |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
2.19.015 . February 12, 2019 Mr. David C. Lew Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Brian R. Sullivan Site Vice President Regional AdministraJor, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713
SUBJECT:
REFERENCES:
Dear Mr. Lew:
Completion of Confirmatory Action Letter Actions Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-035 1. Letter, NRC to Entergy Nuclear Operations, Inc., "Confirmatory Action Letter -Pilgrim Nuclear Power Station," dated August 2, 2017 (ML 172114A088)
- 2. Letter, NRC to Entergy Nuclear Operations, Inc., "Confirmatory Action Letter (EA-17-086)
Follow-Up Inspection Report 05000293/2018013," dated January 23, 2019 (ML19023A057)
In Reference 1, the U.S. Nuclear Regulatory Commission (NRC) provided a Confirmatory Action Letter (CAL) approving the commitments Entergy Nuclear Operations, Inc. (Entergy) had made concerning improvement actions at the Pilgrim Nuclear Power Station. Since that time, Entergy has completed all of the actions specified in the CAL. The NRC conducted five CAL follow-up inspections and concluded in Reference 2 that all 156 Confirmatory Action Letter actions and their 11 associated Area Action Plans are complete.
In accordance with Item 4 of Reference 1, Entergy hereby notifies the NRC that we have completed all of the actions addressed in the CAL. There are no new regulatory commitments made in this letter.
Letter No. 2.19.015 Page 2 of 2 If you have any questions on this letter, please contact Mr. Peter J. Miner at (508) 830-7127.
Sincerely, ~Jtx-Brian R. Sullivan BRS/pm cc: USNRC Document Control Desk USNRC Resident Inspector, Pilgrim