GO2-16-057, Response to Second Request for Additional Information RAI) Related to an Amendment to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = Letter type:GO, Response to Request for Additional Information (RAI)
| document type = Letter type:GO, Response to Request for Additional Information (RAI)
| page count = 4
| page count = 4
| project =
| stage = Request
}}
}}


Line 28: Line 30:


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By Reference 1 , Energy Northwest submitted for approval the License Amendment Request (LAR) to adopt TSTF-425, Revision 3. Via Reference 2, the Nuclear Regulatory Commission (NRC) submitted Requests for Additional Information (RAls) related to the Energy Northwest's probabilistic risk assessment (PRA) model. Via References 3 and 4, Energy Northwest submitted responses to Reference  
By Reference 1 , Energy Northwest submitted for approval the License Amendment Request (LAR) to adopt TSTF-425, Revision 3. Via Reference 2, the Nuclear Regulatory Commission (NRC) submitted Requests for Additional Information (RAls) related to the Energy Northwest's probabilistic risk assessment (PRA) model. Via References 3 and 4, Energy Northwest submitted responses to Reference
: 2. In response to Reference 5, Energy Northwest is submitting as Attachment 1, its response to the second RAI on the PRA model. The No Significant Hazards Consideration determination (NSHCD) provided in the original submittal is not altered by this submittal.
: 2. In response to Reference 5, Energy Northwest is submitting as Attachment 1, its response to the second RAI on the PRA model. The No Significant Hazards Consideration determination (NSHCD) provided in the original submittal is not altered by this submittal.
This letter and its attachment contain no regulatory commitments.
This letter and its attachment contain no regulatory commitments.
Line 69: Line 71:


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By Reference 1 , Energy Northwest submitted for approval the License Amendment Request (LAR) to adopt TSTF-425, Revision 3. Via Reference 2, the Nuclear Regulatory Commission (NRC) submitted Requests for Additional Information (RAls) related to the Energy Northwest's probabilistic risk assessment (PRA) model. Via References 3 and 4, Energy Northwest submitted responses to Reference  
By Reference 1 , Energy Northwest submitted for approval the License Amendment Request (LAR) to adopt TSTF-425, Revision 3. Via Reference 2, the Nuclear Regulatory Commission (NRC) submitted Requests for Additional Information (RAls) related to the Energy Northwest's probabilistic risk assessment (PRA) model. Via References 3 and 4, Energy Northwest submitted responses to Reference
: 2. In response to Reference 5, Energy Northwest is submitting as Attachment 1, its response to the second RAI on the PRA model. The No Significant Hazards Consideration determination (NSHCD) provided in the original submittal is not altered by this submittal.
: 2. In response to Reference 5, Energy Northwest is submitting as Attachment 1, its response to the second RAI on the PRA model. The No Significant Hazards Consideration determination (NSHCD) provided in the original submittal is not altered by this submittal.
This letter and its attachment contain no regulatory commitments.
This letter and its attachment contain no regulatory commitments.

Revision as of 08:31, 27 April 2019

Response to Second Request for Additional Information RAI) Related to an Amendment to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program
ML16098A387
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/07/2016
From: Hettel W G
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-16-057
Download: ML16098A387 (4)


Text

William G. Hettel Vice President, Operations P.O. Box 968, Mail Drop PE23 Richland, WA 99352-0968 Ph. 509-377-8311 F. 509-377-4674 wghettel@energy-northwest.com GO2-16-057 10 CFR 50.90 U.S. Nuclear Regulat ory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 RESPONSE TO SECOND REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO AN AMENDMENT TO ADOPT TECHNICAL SPECIFICATION TASK FO RCE (TSTF)-425, REVISION 3 TO RELOCATE SPECIFIC SUR VEILLANCE FREQUENCIES TO A LICENSEE CONTROLLED PROGRAM

References:

1. Letter, GO2-15-007, dat ed March 17, 2015, WG Hettel (Energy Northwest) to NRC, "License Amendment Request for Adoption of Technical Specification Task Force Traveler (TSTF)-425, Revision 3 2.Email, dated August 12, 2015, Balwant Singal (NRC) to Lisa Williams (Energy Northwest), "Request for A dditional Information - License Amendment Request for Adoption of TSTF-425, Revision [3],

Columbia Generating Station - TAC No. MF6042"3.Letter, GO2-15-128, dated September 17, 2015, RE Schuetz (Energy Northwest) to NRC, "Response to Request for Additional Information

on License Amendment Request for A dopt Technical Specification Task Force (TSTF)-425, Revision 3"4.Letter, GO2-15-145, dated Octobe r 29, 2015, RE Schuetz (EnergyNorthwest to NRC, "Response to Request for Additional Information (RAI) 3 on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 G02-16-057 Page 2 of 2 5. Email, dated March 9, 2016, John Klos (NRC) to Lisa Williams (Energy Northwest), "Second Request for Additional Information (RAI) Related to an Amendment to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program

Dear Sir or Madam:

By Reference 1 , Energy Northwest submitted for approval the License Amendment Request (LAR) to adopt TSTF-425, Revision 3. Via Reference 2, the Nuclear Regulatory Commission (NRC) submitted Requests for Additional Information (RAls) related to the Energy Northwest's probabilistic risk assessment (PRA) model. Via References 3 and 4, Energy Northwest submitted responses to Reference

2. In response to Reference 5, Energy Northwest is submitting as Attachment 1, its response to the second RAI on the PRA model. The No Significant Hazards Consideration determination (NSHCD) provided in the original submittal is not altered by this submittal.

This letter and its attachment contain no regulatory commitments.

If there are any questions or if additional information is needed, please contact Ms. L. L. Williams, Licensing Supervisor, at 509-377-8148.

I declare of perjury that the foregoing is true and correct.

of , 2016. Respectfully, W.G. Hettel Vice President, Operations Attachments:

As stated cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector

-988C CD Sonoda -BPN1399 (email) WA Horin -Winston & Strawn RR Cowley-WDOH (email) EFSECutc.wa.gov--

EFSEC (email) Executed this GO2-16-057 Page 1 of 2RESPONSE TO SECOND REQUEST FOR ADDITIONAL INFORMATION NRC Request PRA RAI 1.1 (Follow up to PRA RAI 1)

In response to PRA RAI 1, the licensee provided the internal event s PRA 2009 peer review facts and observations (F&Os), self-a ssessment findings, and their dispositions.

Please address the following regarding F&O 1-3. a.The peer review F&O 1-3 states "In almo st all of the post-in itiator Human Error Probabilities (HEPs) where optimal stress is assumed, time is a factor with coredamage occurring between 30 mi nutes and an hours."

Clarify if these post-initiator HEPs were assumed to be optimal stress in all casesinvolving this time frame or if such HEPs were determined on a case-by-case basis to represent optimal stress or high stre ss as appropriate. Please describe your process to make this determination.b.The peer review also observed, "A sec ond set of justificati on was provided, with discussion that basically justif ied moderate or low stress would be appropriate, given enough training for the operators.

" The peer review reco mmendation stated: "Apply high stress factors per Table 17-1 of NUREG/CR-1278 to HEPs where time pressure is present during an a ccident situation."

Please clarify if high stress factors were used on a case-by-case basis from this table, and, if not provide justification. Please discuss whether time pressure was used to determine whether an ex ecution operator action ju stified the application of a high stress factor.Energy Northwest Response: As part of the Rev. 7.2 PRA update performed in 2014, the assignments of stress levels were reviewed for all Columbia Generating Station (CGS) post-initiator human failure events, and all post-initiator human failure events now utilize the stress levels recommended by the Human Reliability Analysi s (HRA) Calculator. The stress level recommended by the HRA calculator was revi ewed by the HRA analyst and in some cases increased to a higher stress level. In this manner, the full in tent of F&O 1-3 has been resolved.

By utilizing the HRA Calculator, the stress levels assigned to the CGS HFEs follow the NUREG/CR-1278 guidelines, including addressing the impact to stress levels from time pressure. NRC Request PRA RAI 4.1 (Follow up to PRA RAI 4) The NRC staff reviewed the response to PRA RAI 4 and found the response did not address the issue. The peer review observation in the LAR states:

GO2-16-057 Page 2 of 2 "Estimates based on the surveill ance tests and maintenance acts as described in DA-C6 and DA-C7 should be performed for signi ficant components whose data are not tracked in the MSPI [Mitigating Systems Performance Index] data."

The peer review recommendations states:

"Update the estimates for significant events based on surveillance test and maintenance records."

The response to PRA RAI 4 states:

"A sensitivity study was performed by replacing the base data for these failure modes with generic data from NUREG/CR-6928. It was determined that the finding is unlikely to change the conclusions of risk-informed decisions."

Supporting requirements (SRs) DA-C6 and DA-C7 are not limited to the MSPI systems.

SR DA-C6 and SR DA-C7 include consideration of plant-specific data, and it is not clear how generic data has been demonstrated to be bounding for the non-MSPI components. That is, if the peer review re commendation were to be performed it is not clear that the generic data would necessarily be bounding.

Please provide justification why the use of generic data for performing sensitivity analyses is bounding without updating applic able component estimates with plant-specific data consistent with SR DA-C6 and SR DA-C7, or compete the work to meet SR DA-C6 and SR DA-C7 for applicable components and provide the disposition of the F&O. Energy Northwest Response:

Finding F&O 2-2 against SR DA-C6 and SR DA-C7 from the 2009 peer review has been resolved. The disposition of the F&O is as follows:

Estimates for significant events not tracked in the Mitigating Performance System Index (MSPI) data are now based on plant-specific surveillance test and maintenance records. Resolution of F&O 2-2 impacts the following component failure modes: C---W2 (compressor fails to start), C---W4 (compressor fails to run), FN--R3 (fan fails to start), FR--W4 (fan fails to run), AHUS---S3 (air handl ing unit fails to start), AHUR---W4 (air handling unit fails to run).

The resolution to this F&O has been incorporated into a working model. This working model will be used for all Risk informed Techni cal Specification (RITS) 5B assessments until a model of record revision is released wh ich contains the resolution to this F&O.

William G. Hettel Vice President, Operations P.O. Box 968, Mail Drop PE23 Richland, WA 99352-0968 Ph. 509-377-8311 F. 509-377-4674 wghettel@energy-northwest.com GO2-16-057 10 CFR 50.90 U.S. Nuclear Regulat ory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 RESPONSE TO SECOND REQUEST FOR ADDITIONAL INFORMATION (RAI) RELATED TO AN AMENDMENT TO ADOPT TECHNICAL SPECIFICATION TASK FO RCE (TSTF)-425, REVISION 3 TO RELOCATE SPECIFIC SUR VEILLANCE FREQUENCIES TO A LICENSEE CONTROLLED PROGRAM

References:

1. Letter, GO2-15-007, dat ed March 17, 2015, WG Hettel (Energy Northwest) to NRC, "License Amendment Request for Adoption of Technical Specification Task Force Traveler (TSTF)-425, Revision 3 2.Email, dated August 12, 2015, Balwant Singal (NRC) to Lisa Williams (Energy Northwest), "Request for A dditional Information - License Amendment Request for Adoption of TSTF-425, Revision [3],

Columbia Generating Station - TAC No. MF6042"3.Letter, GO2-15-128, dated September 17, 2015, RE Schuetz (Energy Northwest) to NRC, "Response to Request for Additional Information

on License Amendment Request for A dopt Technical Specification Task Force (TSTF)-425, Revision 3"4.Letter, GO2-15-145, dated Octobe r 29, 2015, RE Schuetz (EnergyNorthwest to NRC, "Response to Request for Additional Information (RAI) 3 on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 G02-16-057 Page 2 of 2 5. Email, dated March 9, 2016, John Klos (NRC) to Lisa Williams (Energy Northwest), "Second Request for Additional Information (RAI) Related to an Amendment to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program

Dear Sir or Madam:

By Reference 1 , Energy Northwest submitted for approval the License Amendment Request (LAR) to adopt TSTF-425, Revision 3. Via Reference 2, the Nuclear Regulatory Commission (NRC) submitted Requests for Additional Information (RAls) related to the Energy Northwest's probabilistic risk assessment (PRA) model. Via References 3 and 4, Energy Northwest submitted responses to Reference

2. In response to Reference 5, Energy Northwest is submitting as Attachment 1, its response to the second RAI on the PRA model. The No Significant Hazards Consideration determination (NSHCD) provided in the original submittal is not altered by this submittal.

This letter and its attachment contain no regulatory commitments.

If there are any questions or if additional information is needed, please contact Ms. L. L. Williams, Licensing Supervisor, at 509-377-8148.

I declare of perjury that the foregoing is true and correct.

of , 2016. Respectfully, W.G. Hettel Vice President, Operations Attachments:

As stated cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector

-988C CD Sonoda -BPN1399 (email) WA Horin -Winston & Strawn RR Cowley-WDOH (email) EFSECutc.wa.gov--

EFSEC (email) Executed this GO2-16-057 Page 1 of 2RESPONSE TO SECOND REQUEST FOR ADDITIONAL INFORMATION NRC Request PRA RAI 1.1 (Follow up to PRA RAI 1)

In response to PRA RAI 1, the licensee provided the internal event s PRA 2009 peer review facts and observations (F&Os), self-a ssessment findings, and their dispositions.

Please address the following regarding F&O 1-3. a.The peer review F&O 1-3 states "In almo st all of the post-in itiator Human Error Probabilities (HEPs) where optimal stress is assumed, time is a factor with coredamage occurring between 30 mi nutes and an hours."

Clarify if these post-initiator HEPs were assumed to be optimal stress in all casesinvolving this time frame or if such HEPs were determined on a case-by-case basis to represent optimal stress or high stre ss as appropriate. Please describe your process to make this determination.b.The peer review also observed, "A sec ond set of justificati on was provided, with discussion that basically justif ied moderate or low stress would be appropriate, given enough training for the operators.

" The peer review reco mmendation stated: "Apply high stress factors per Table 17-1 of NUREG/CR-1278 to HEPs where time pressure is present during an a ccident situation."

Please clarify if high stress factors were used on a case-by-case basis from this table, and, if not provide justification. Please discuss whether time pressure was used to determine whether an ex ecution operator action ju stified the application of a high stress factor.Energy Northwest Response: As part of the Rev. 7.2 PRA update performed in 2014, the assignments of stress levels were reviewed for all Columbia Generating Station (CGS) post-initiator human failure events, and all post-initiator human failure events now utilize the stress levels recommended by the Human Reliability Analysi s (HRA) Calculator. The stress level recommended by the HRA calculator was revi ewed by the HRA analyst and in some cases increased to a higher stress level. In this manner, the full in tent of F&O 1-3 has been resolved.

By utilizing the HRA Calculator, the stress levels assigned to the CGS HFEs follow the NUREG/CR-1278 guidelines, including addressing the impact to stress levels from time pressure. NRC Request PRA RAI 4.1 (Follow up to PRA RAI 4) The NRC staff reviewed the response to PRA RAI 4 and found the response did not address the issue. The peer review observation in the LAR states:

GO2-16-057 Page 2 of 2 "Estimates based on the surveill ance tests and maintenance acts as described in DA-C6 and DA-C7 should be performed for signi ficant components whose data are not tracked in the MSPI [Mitigating Systems Performance Index] data."

The peer review recommendations states:

"Update the estimates for significant events based on surveillance test and maintenance records."

The response to PRA RAI 4 states:

"A sensitivity study was performed by replacing the base data for these failure modes with generic data from NUREG/CR-6928. It was determined that the finding is unlikely to change the conclusions of risk-informed decisions."

Supporting requirements (SRs) DA-C6 and DA-C7 are not limited to the MSPI systems.

SR DA-C6 and SR DA-C7 include consideration of plant-specific data, and it is not clear how generic data has been demonstrated to be bounding for the non-MSPI components. That is, if the peer review re commendation were to be performed it is not clear that the generic data would necessarily be bounding.

Please provide justification why the use of generic data for performing sensitivity analyses is bounding without updating applic able component estimates with plant-specific data consistent with SR DA-C6 and SR DA-C7, or compete the work to meet SR DA-C6 and SR DA-C7 for applicable components and provide the disposition of the F&O. Energy Northwest Response:

Finding F&O 2-2 against SR DA-C6 and SR DA-C7 from the 2009 peer review has been resolved. The disposition of the F&O is as follows:

Estimates for significant events not tracked in the Mitigating Performance System Index (MSPI) data are now based on plant-specific surveillance test and maintenance records. Resolution of F&O 2-2 impacts the following component failure modes: C---W2 (compressor fails to start), C---W4 (compressor fails to run), FN--R3 (fan fails to start), FR--W4 (fan fails to run), AHUS---S3 (air handl ing unit fails to start), AHUR---W4 (air handling unit fails to run).

The resolution to this F&O has been incorporated into a working model. This working model will be used for all Risk informed Techni cal Specification (RITS) 5B assessments until a model of record revision is released wh ich contains the resolution to this F&O.