==Subject:==
==Subject:==
  [External_Sender] RE: Draft Meeting Summary for the October 4, 2014, Category 1 Public Meeting  Sent Date:  10/12/2016 6:30:30 AM  Received Date:  10/12/2016 6:30:47 AM From:    Louie, Richard Created By:  rlouie@entergy.com Recipients:    "Wentzel, Michael" <Michael.Wentzel@nrc.gov>  Tracking Status: None  
[External_Sender] RE: Draft Meeting Summary for the October 4, 2014, Category 1 Public Meeting  Sent Date:  10/12/2016 6:30:30 AM  Received Date:  10/12/2016 6:30:47 AM From:    Louie, Richard Created By:  rlouie@entergy.com Recipients:    "Wentzel, Michael" <Michael.Wentzel@nrc.gov>  Tracking Status: None  


Post Office:  JDCXMETSP002.etrsouth.corp.entergy.com Files    Size      Date & Time MESSAGE    795      10/12/2016 6:30:47 AM  Summary of the October 4 2016 Public Meeting with Entergy Regarding the Indian Point License Renewal Application_RL.docx    33393 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:         
Post Office:  JDCXMETSP002.etrsouth.corp.entergy.com Files    Size      Date & Time MESSAGE    795      10/12/2016 6:30:47 AM  Summary of the October 4 2016 Public Meeting with Entergy Regarding the Indian Point License Renewal Application_RL.docx    33393 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:         
Line 102: Line 102:
A FFILIATIONS:Brian Allik U.S. Nuclear Re g ulator y Commission (NRC)Ben j amin Beasle y NRCWilliam Burton NRC Yoira Diaz-Sanabria NRC Jim Gavula NRC Brian Harris NRC Bill Holston NRC
A FFILIATIONS:Brian Allik U.S. Nuclear Re g ulator y Commission (NRC)Ben j amin Beasle y NRCWilliam Burton NRC Yoira Diaz-Sanabria NRC Jim Gavula NRC Brian Harris NRC Bill Holston NRC


Dennis More y NRCDavid Roth NRC Michael Wentzel NRC Richard Burroni Enter gy Nuclear O p erations, Inc.  
Dennis More y NRCDavid Roth NRC Michael Wentzel NRC Richard Burroni Enter gy Nuclear O p erations, Inc.
(Enter gy)Charles Ca p uto Enter gy Michael Kem pski Enter gyRichard Louie Enter gyThomas Orlando Enter gyDennis Pennino Enter gy A ndrew Ta y lo r Enter gy Robert Wal p ole Enter gy}}
(Enter gy)Charles Ca p uto Enter gy Michael Kem pski Enter gyRichard Louie Enter gyThomas Orlando Enter gyDennis Pennino Enter gy A ndrew Ta y lo r Enter gy Robert Wal p ole Enter gy}}

Revision as of 01:06, 27 April 2019

2016/10/12 Indian Point Lr Hearing - (External_Sender) Draft Meeting Summary for the October 4, 2014, Category 1 Public Meeting
ML16286A004
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/12/2016
From:
- No Known Affiliation
To:
Division of License Renewal
References
Download: ML16286A004 (8)


Text

1 IPRenewal NPEmails From: Louie, Richard <rlouie@entergy.com>

Sent: Wednesday, October 12, 2016 6:31 AM To:Wentzel, Michael

Subject:

[External_Sender] RE: Draft Meeting Summa ry for the October 4, 2014, Category 1 Public Meeting Attachments:

Summary of the October 4 2016 Public Meet ing with Entergy R egarding the Indian Point License Renewal Application_RL.docxMike, Attached please find, comments we have on the draft meeting summary.

Additionally, we would like to request a due date extension for the responses for RAI SET 2016-01 to December 1, 2016.

Let me know if you have any questions.

Thanks, Rich From: Wentzel, Michael [mailto:Michael.Wentzel@nrc.gov

] Sent: Thursday, October 06, 2016 1:49 PM To: Louie, Richard

Subject:

Draft Meeting Summary for the October 4, 2014, Category 1 Public Meeting Rich,

Attached is a draft meeting summary for our October 4, 2016, meeting. Please let me know if you have any comments on the summary.

Thanks, Mike

Michael Wentzel Project Manager NRR/DLR/RERP (301) 415-6459 michael.wentzel@nrc.gov

Hearing Identifier: IndianPointUnits2and3NonPublic_EX Email Number: 8039 Mail Envelope Properties (CB159DC717B797428E92782CE3B5F40B2DDFEC53)

Subject:

[External_Sender] RE: Draft Meeting Summary for the October 4, 2014, Category 1 Public Meeting Sent Date: 10/12/2016 6:30:30 AM Received Date: 10/12/2016 6:30:47 AM From: Louie, Richard Created By: rlouie@entergy.com Recipients: "Wentzel, Michael" <Michael.Wentzel@nrc.gov> Tracking Status: None

Post Office: JDCXMETSP002.etrsouth.corp.entergy.com Files Size Date & Time MESSAGE 795 10/12/2016 6:30:47 AM Summary of the October 4 2016 Public Meeting with Entergy Regarding the Indian Point License Renewal Application_RL.docx 33393 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

U.S. Nuclear Regulatory Commission Public Meeting Summary

Title: Public Meeting with Entergy Nuclear Operations, Inc. (Entergy) Regarding P roposlann ed Changes to the Service Water Integrity Program for the Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3) License Renewal Application (LRA)

Meeting Identifier:

20161263 Date of Meeting: Tuesday, October 4, 2016 Location: NRC One White Flint North, O-9B4 11555 Rockville Pike Rockville, MD Type of Meeting: Category 1 Purpose of the Meeting(s):

The purpose of the meeting was for Entergy to describe proposlanned changes to the Indian Point Energy Center (IP2 and IP3IPEC)

Service Water Integrity Program. The p roposlanned changes are in response to the U.S. Nuclear Regulatory Commission (NRC) staff's July 25, 2016, request for additional information regarding its review of the IP2 and IP3 LRA. General Details:

The NRC held a meeting on October 4, 2016, from 9:00 a.m. - 10:00 a.m. EDT. The meeting began with an introduction, an overview of meeting logistics, and an introduction of attendees. Entergy then presented an overview of its proposlanned changes to the IP2 and IP3IPEC Service Water Integrity Program to address the NRC staff's request for additional information. Following the presentation, the meeting was opened for discussion between the NRC and Entergy staff. Approximately 23 people participated in the meeting. Meeting participants included representatives from the NRC and Entergy, as well as five unidentified members of the public or interested stakeholders that participated via telephone. Summary of Presentation: Entergy presented an overview of its proposlann ed enhancements to the IP2 and IP3IPEC Service Water Integrity Program to address the NRC staff's July 25, 2016, request for additional information. A summary of the proposlanned enhancements and discussion during the meeting is outlined below.

RAI 3.0.3-10 Request 1 Entergy stated that it proposlanned to enhance the Service Water Integrity Program to establish goals for the minimum number of inspections that would be performed to addressoccurrences of service water piping degradation (either through-wall leakage, or greater than 50 percent reduction in wall thickness) resulting from recurring internal corrosion (RIC). For five or fewer instances of the aging effect with the same aging mechanism (either through-wall leakage, or greater than 50 percent reduction in wall thickness)such degradation in safety-related piping, Entergy would perform 10 augmented inspections. For greater than five instances, a minimum of 15 augmented inspections will be performed. In nonsafety-related piping, five additional inspections would be performed if a through-wall leak occurs. In addition, Entergy p roposlanned to enhance the Service Water Integrity Program to perform a robotic inspection of in-scopeunderground and accessible above-ground service water piping during the second 10-year license renewal period (i.e. continuation of the first 10-year license renewal period).

Regarding the additional inspections, the NRC staff asked Entergy what the acceptance criteria would be. Entergy stated that the degradation would be evaluated by performing a calculation to determine the remaining useful life for the piping relative to structural integrity. The staff stated that acceptance criteria for structural integrity does not address future leaks, as discussed during the staff's February audit regarding a fire water system leak. Regarding robotic inspections, the NRC staff asked Entergy whether robotic inspections were performed as part of the current program. Entergy stated that there is a current preventive maintenance item to perform a robotic inspection of the service water piping every 8 years. When asked how making this enhancement would differ from what is done currently, Entergy stated that making this enhancement would credit result in a regulatory commitment to perform the inspection for license renewal and ensure that an inspection is performed during the second 10-year period of the period of extended operation. RAI 3.0.3-10 Request 2a Entergy stated that it planned to enhance the Service Water Integrity Program to perform a verificationverify that service water system piping in areasthe valve pit(s) that experiencedare susceptible to flooding wereis considered in-scope for license renewal.

Additionally, the Pp rogram would be enhance d to ensure that inspections on the non-safety related piping (within the scope of license renewal) would be conducted on the same frequency as the safety-related piping. The NRC staff asked Entergy whether they had assessed the effectiveness of the corrective actions taken in response to Licensee Event Report (LER) 286/2011-003, considering that similar leakage was identified in a valve pit subsequent to the LER. Entergy stated that they believed that the corrective actions taken were effectivewere unaware of the circumstances the second leak event and asked the NRC staff to identify documentation describing the leakage to which the NRC staff had referred. The NRC staff committed to identifying the applicable documentation. Entergy stated that it would address the effectiveness of the corrective actions subsequent to the LER in the response to this request. (See Action Items/Next Steps below for additional information.)

RAI 3.0.3-10 Request 3 Entergy stated that it proposlanned to enhance the Service Water Integrity Program to include silt monitoring and that change would be implemented by identifying its relationship to license renewal in the IP2 and IP3 Generic Letter 89-13 program documentation. RAI 3.0.3-10 Requests 4a and 4b Entergy stated that it proposlanned to enhance the Service Water Integrity Program to incorporate layup procedures for the radiation monitoring piping. Entergy stated that the subject leakage occurred when the system was isolated for maintenance without properly laying up the system beforehand.

RAI 3.0.3-10 Request 5a Entergy stated that it proposlanned to enhance the Service Water Integrity Program by developing goals and increasing the flushing frequency of performing the Ss ervice Ww ater Pp iping and Vv alve Ff lush ing procedure from once every 2 years to annually, if these goals are exceeded. RAI 3.0.3-10 Request 6 Entergy stated that it proposlanned to enhance the Service Water Integrity Program to clarify that the minimum number of augmented inspections that will be performed in response to any identified leakage associated with corrosion would be five inspections for

through-wall leakage on A(2) piping. Implementation Schedule Entergy stated that all enhancements would be implemented as soon as practicable, but not later than December 31, 2019. Public Participation Themes:

No questions or comments were provided to the NRC staff during the public participation portion of the meeting.

Action Items/Next Steps: During the meeting, the NRC staff committed to providing Entergy with the reference to the documentation of additional valve pit leakage. Subsequent to the meeting, the NRC staff identified that the leakage appears to be documented in Condition Report CR-IP3-2013-

0507. Attachments:

  • Entergy's agenda - MLXXX Entergy stated that it proposlanned to enhance the Service Water Integrity Program to clarify that the minimum number of augmented inspections that will be performed in response to any identified leakage associated with corrosion would be five inspections for through-wall

leakage. Implementation Schedule Entergy stated that all enhancements would be implemented as soon as practicable, but not later than December 31, 2019. Public Participation Themes:

No questions or comments were provided to the NRC staff during the public participation portion of the meeting.

Action Items/Next Steps: During the meeting, the NRC staff committed to providing Entergy with the reference to the documentation of additional valve pit leakage. Subsequent to the meeting, the NRC staff identified that the leakage appears to be documented in Condition Report CR-IP3-2013-

0507. Attachments:

  • Entergy's agenda - MLXXX

ADAMS Accession Nos.: (PKG) (MEMO) *concurred via email OFFICE LA:DLR PM:RERP:DLR BC:RARB:DLR BC:RPB1:DLR NAME MWentzel DMorey YDiaz-Sanabria DATE OFFICE RECORD COPY DISTRIBUTION:

HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource

RidsNrrDlrRpb1 Resource

RidsNrrDlrRpb2 Resource

RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource

RidsNrrDlrRerb Resource

RidsNrrDlrRsrg Resource

RidsOgcMailCenter Resource


MWentzel YDiaz JGavula BAllik DMorey DPickett STurk, OGC

DRoth, OGC

BHarris, OGC SBurnell, OPA DMcIntyre, OPA JWeil, OCA MGray, RI GDentel, RI

DonaldJackson, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA

DTifft, RI

BHaagensen, RI GNewman, RI SRich, RI ENCLOSURE U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of License Renewal Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application List of Participants October 4, 2016 PARTICIPANTS:

A FFILIATIONS:Brian Allik U.S. Nuclear Re g ulator y Commission (NRC)Ben j amin Beasle y NRCWilliam Burton NRC Yoira Diaz-Sanabria NRC Jim Gavula NRC Brian Harris NRC Bill Holston NRC

Dennis More y NRCDavid Roth NRC Michael Wentzel NRC Richard Burroni Enter gy Nuclear O p erations, Inc.

(Enter gy)Charles Ca p uto Enter gy Michael Kem pski Enter gyRichard Louie Enter gyThomas Orlando Enter gyDennis Pennino Enter gy A ndrew Ta y lo r Enter gy Robert Wal p ole Enter gy