{{#Wiki_filter:* CORRECTED COPY OPERATING DATA REPORT W Docket No: 50-311 Date: 07/10/94 Completed by: Mike Morroni Telephone: | {{#Wiki_filter:* CORRECTED COPY OPERATING DATA REPORT W Docket No: 50-311 Date: 07/10/94 Completed by: Mike Morroni Telephone: | ||
339-2122 Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period June 1994 3. Licensed Thermal Power (MWt) 3411 4. Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 6. Maximum Dependable Capacity(Gross MWe) 1149 7. Maximum Dependable Capa9ity (Net MWe) 1106 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA 9. Power Level to Which Restricted, if any (Net MWe) -N/A 10. Reasons for Restrictions, if any N/A. This Month Year to Date Cumulative | 339-2122 Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period June 1994 3. Licensed Thermal Power (MWt) 3411 4. Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 6. Maximum Dependable Capacity(Gross MWe) 1149 7. Maximum Dependable Capa9ity (Net MWe) 1106 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA 9. Power Level to Which Restricted, if any (Net MWe) -N/A 10. Reasons for Restrictions, if any N/A. This Month Year to Date Cumulative | ||
: 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator on-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) Gross Elec. Energy Generated (MWH) 18. Net Elec. Energy Gen. (MWH) 19. Unit Service Factor 20. Unit Availability Factor 21. Unit Capacity Factor (using MDC Net) 22. Unit Capacity Factor (using DER Net) 23. Unit Forced Outage Rate 720 652.65 0 577.05 0 1846245.6 582860 551889 80.1 80.1 69.3 68.7 6.9 4343 111456 4198.68 73478.24 0 0 4039.3 70928.82 0 0 *11916470.4 | : 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator on-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) Gross Elec. Energy Generated (MWH) 18. Net Elec. Energy Gen. (MWH) 19. Unit Service Factor 20. Unit Availability Factor 21. Unit Capacity Factor (using MDC Net) 22. Unit Capacity Factor (using DER Net) 23. Unit Forced Outage Rate 720 652.65 0 577.05 0 1846245.6 582860 551889 80.1 80.1 69.3 68.7 6.9 4343 111456 4198.68 73478.24 0 0 4039.3 70928.82 0 0 *11916470.4 | ||
*174379409.8 3837320 74383838 3650335 70777612 93 63.6 93 76 57.4 75.4 57 4.8 21.8 24. Shutdowns scheduled over next 6 months (type, date and duration of each) Refueling outage scheduled to start October 15. 1994 and last 60 days. 25. If shutdown at end of Report Period, Estimated Date of startup: NA 8-l-7.R2 ----I 9408260299 940818 PDR ADOCK 05000311 R PDR}} | *174379409.8 3837320 74383838 3650335 70777612 93 63.6 93 76 57.4 75.4 57 4.8 21.8 24. Shutdowns scheduled over next 6 months (type, date and duration of each) Refueling outage scheduled to start October 15. 1994 and last 60 days. 25. If shutdown at end of Report Period, Estimated Date of startup: NA 8-l-7.R2 ----I 9408260299 940818 PDR ADOCK 05000311 R PDR}} |
Revision as of 15:27, 25 April 2019
ML18101A192 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 06/30/1994 |
From: | MORRONI M Public Service Enterprise Group |
To: | |
Shared Package | |
ML18101A190 | List: |
References | |
NUDOCS 9408260299 | |
Download: ML18101A192 (1) | |
Text
- CORRECTED COPY OPERATING DATA REPORT W Docket No: 50-311 Date: 07/10/94 Completed by: Mike Morroni Telephone:
339-2122 Operating Status 1. Unit Name Salem No. 2 Notes 2. Reporting Period June 1994 3. Licensed Thermal Power (MWt) 3411 4. Nameplate Rating (Gross MWe) 1170 5. Design Electrical Rating (Net MWe) 1115 6. Maximum Dependable Capacity(Gross MWe) 1149 7. Maximum Dependable Capa9ity (Net MWe) 1106 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA 9. Power Level to Which Restricted, if any (Net MWe) -N/A 10. Reasons for Restrictions, if any N/A. This Month Year to Date Cumulative
- 11. Hours in Reporting Period 12. No. of Hrs. Rx. was Critical 13. Reactor Reserve Shutdown Hrs. 14. Hours Generator on-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) Gross Elec. Energy Generated (MWH) 18. Net Elec. Energy Gen. (MWH) 19. Unit Service Factor 20. Unit Availability Factor 21. Unit Capacity Factor (using MDC Net) 22. Unit Capacity Factor (using DER Net) 23. Unit Forced Outage Rate 720 652.65 0 577.05 0 1846245.6 582860 551889 80.1 80.1 69.3 68.7 6.9 4343 111456 4198.68 73478.24 0 0 4039.3 70928.82 0 0 *11916470.4
- 174379409.8 3837320 74383838 3650335 70777612 93 63.6 93 76 57.4 75.4 57 4.8 21.8 24. Shutdowns scheduled over next 6 months (type, date and duration of each) Refueling outage scheduled to start October 15. 1994 and last 60 days. 25. If shutdown at end of Report Period, Estimated Date of startup: NA 8-l-7.R2 ----I 9408260299 940818 PDR ADOCK 05000311 R PDR