Category:Code Relief or Alternative
MONTHYEARML20282A7322020-10-27027 October 2020 Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection Interval ML17318A0422017-11-20020 November 2017 Relief Request No. 3ISI-17 from the Requirements of the ASME Code, Section XI for the Third 10-Year Inservice Inspection Interval (CAC No. MF8923; EPID L-2016 LLR-0005) ML17046A5072017-02-16016 February 2017 Relief Request for Alternative 4ISI-07 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML17018A0822017-01-24024 January 2017 Relief Request for Alternative 4ISI-05 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16292A8722016-11-0303 November 2016 Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection Interval ML16295A2122016-10-31031 October 2016 Relief Request 4ISI-02, Use of Code Case N-795 Following Repair/Replacement Activities, Fourth 10-Year Inservice Inspection Interval ML16175A4602016-06-24024 June 2016 Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval ML15357A3502015-12-23023 December 2015 Email, Verbal Authorization of Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval ML15036A2202015-02-13013 February 2015 Relief Request 3ISI-14 - Use of Code Case N-702 for Nozzle-Vessel Weld and Inner Radius Exams for the Third 10-Year Inservice Inspection Interval ML15030A2322015-02-0909 February 2015 Correction to 10 CFR 50.55a Citation and Administrative Changes - Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the 4th 10-Year Inservice Testing Interval ML14337A4492014-12-0909 December 2014 Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the Fourth 10-Year Inservice Testing Interval (TAC MF3847-MF3849, MF3851-MF3858) ML13191A0542013-08-0909 August 2013 Relief Request 3ISI-12, Use of Code Case N-795, Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities ML13098A0642013-04-10010 April 2013 Memorandum to File, Verbal Authorization on 4/6/2013 of Relief Request ISI3-13, Temporary Non-Code Repair of Reactor Water Cleanup System Piping to Prevent Reactor Shutdown Until Start of Refueling Outage 21 JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP2011-10-0303 October 2011 Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP ML1101101722011-02-0303 February 2011 Relief Request Nos. 3ISI-10, Use of Updated Method for RPV Weld Inspection, and 3ISI-11, Use of Requirements of BWRVIP-75-A, for the Third 10-Year Inservice Inspection Program ML1017400752010-06-0909 June 2010 Request for Relief from ASME OM Code Test Interval for a Class 2 Pressure Relief Valve ML0829504822008-10-0909 October 2008 Inservice Inspection Program Request 3ISI-09 ML0733300012007-12-18018 December 2007 Request for Relief No. 2ISI-32-1 Through 2ISI-32-20 for the Second 10-Year Inservice Inspection Program Interval and Withdrawal of 2ISI-32-21 ML0710103442007-05-15015 May 2007 Request for Relief Nos. RP01, RP03, RP06, RV01 and RV02 for the Third 10-year Inservice Testing Program Interval ML0706001112007-03-23023 March 2007 Relief, Request for Relief Nos. RP04, RP05, RP07, RV03, RV04, and RV05 for the Third 10-year Interval Inservice Testing Program ML0707305992007-03-22022 March 2007 Relief Request No. 3ISI-06 for the Third 10-Year Inservice Inspection Interval Synchronization of Interval for Class Mc Components and Their Supports ML0706506612007-03-19019 March 2007 Relief Request No. 3ISI-05 for the Third 10-Year Inservice Inspection Interval Hold Time Prior to VT-2 Examination of Standby Liquid Control System ML0705901752007-03-16016 March 2007 Request for Relief No. 3ISI-07 for the Third 10-year Inservice Inspection Interval Program ML0705105212007-03-0808 March 2007 Relief Request Nos. 3ISI-03 and 3ISI-04 for Third 10-Year Inservice Inspection Interval ML0513100912005-06-0101 June 2005 Columbia Generating Station (CGS) - Safety Evaluation for CGS on Relief Request for Alternative to Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds in Accordance with BWRVIP-05 ML0508703482005-05-17017 May 2005 5/17/05 -J. Parrish, Ltr Columbia Gs - American Society of Mechanical Engineers Inservice Inspection Program Relief Requests 21SI-29 and 21SI-30, Subsequent ASME Section XI Edition and Addenda for Pressure Testing ML0508901152005-04-15015 April 2005 Relief, American Society of Mechanical Engineers Inservice Inspection Program Relief Requests 2ISI-31, Subsequent ASME Section XI Edition and Addenda for Pressure Testing (Tac No. MC5851) ML0510405562005-04-14014 April 2005 Columbia Generating Station - American Society of Mechanical Engineers Inservice Inspection Program Second 10-Year Interval Request for Relief 2ISI-028 ML0412701902004-05-0606 May 2004 5/6/04, Columbia Generating Station - American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Relief for Qualification Requirements for Dissimilar Metal Piping Welds 2020-10-27
[Table view] Category:Letter
MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] Category:Safety Evaluation
MONTHYEARML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds ML23083B4012023-04-27027 April 2023 Issuance of Amendment No. 271 to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22263A4452022-11-23023 November 2022 Issuance of Amendment No. 268 to Revise Technical Specification 3.4.11 RCS Pressure and Temperature (P/T) Limits ML22109A0922022-05-18018 May 2022 Correction Letter - Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML22098A0642022-05-0909 May 2022 Issuance of Amendment No. 267 to Adopt Technical Specifications Task Force (TSTF) 546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML22004A1852022-03-11011 March 2022 Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML21293A1642022-01-13013 January 2022 Issuance of Amendment No. 266 License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) ML21273A1672021-11-22022 November 2021 Issuance of Amendment No. 265 Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21081A1502021-03-25025 March 2021 Approval for Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20302A0262020-12-15015 December 2020 Issuance of Amendment No. 262 to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML20282A7322020-10-27027 October 2020 Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection Interval ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20203K8762020-07-22022 July 2020 Correction to Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003 (COVID-19)) ML20181A4452020-07-0707 July 2020 Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003)(Covid-19) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20136A3472020-06-22022 June 2020 Issuance of Amendment No. 259 Revise Technical Specifications Per TSTF-529, Revision 4, Clarify Use and Application Rules ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML20113E9842020-05-0404 May 2020 Issuance of Amendment No. 257 to Extend Implementation Date for Amendment No. 255 Control Room Air Conditioning System (Exigent Circumstances) ML19350B5792020-01-0202 January 2020 Generation Station - Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4383; EPID L-2014-JLD-0045) ML19063A5792019-06-20020 June 2019 Issuance of Amendment No. 253 Renewed Facility Operating License and Technical Specification Clean-Up ML18317A0052018-11-27027 November 2018 Correction to Safety Evaluation Pages 5 and 24 for Amendment No. 199 Dated November 27, 2006 Related to Alternative Source Term ML18283A1252018-11-0808 November 2018 Issuance of Amendment No. 252 Update Appendix B to Renewed Facility Operating License to Incorporate the 2017 Biological Opinion ML18255A3502018-10-30030 October 2018 Issuance of Amendment No. 251 Revision to the Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) ML17333A8882018-02-22022 February 2018 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17318A0422017-11-20020 November 2017 Relief Request No. 3ISI-17 from the Requirements of the ASME Code, Section XI for the Third 10-Year Inservice Inspection Interval (CAC No. MF8923; EPID L-2016 LLR-0005) ML17290A1272017-10-30030 October 2017 Columbia Generating Station - Issuance of Amendment No. 245 Re: Request for a One-Time Extension of the Residual Heat Removal Train A Completion Time (CAC No. MF8794; EPID L-2016-LLA-0016) ML17188A2302017-08-28028 August 2017 Issuance of Amendment No. 244 Emergency Action Level Scheme Change to Nuclear Energy Institute 99-01, Revision 6 ML17187A2572017-07-24024 July 2017 Columbia Generating Station - Issuance of Amendment No. 243 Re: Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 (CAC No. MF8148) ML17131A0712017-06-27027 June 2017 Columbia Generating Station - Issuance of Amendment No. 242 Re: Reduction of Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, "Reactor Core SLs (Safety Limits)" (CAC No. MF8116) ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) ML17046A5072017-02-16016 February 2017 Relief Request for Alternative 4ISI-07 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16357A6462017-01-31031 January 2017 Issuance of Amendment No. 239, Adopt Technical Specification Task Force (TSTF)-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML17018A0822017-01-24024 January 2017 Relief Request for Alternative 4ISI-05 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16292A8722016-11-0303 November 2016 Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection Interval ML16295A2122016-10-31031 October 2016 Relief Request 4ISI-02, Use of Code Case N-795 Following Repair/Replacement Activities, Fourth 10-Year Inservice Inspection Interval ML16263A2332016-10-0505 October 2016 Relief Request 4ISI-04, Reduced Percentage Requirements for Nozzle to Vessel Welds and Inner Radius Exams, for the Fourth 10-Year Inservice Inspection Interval ML16175A4602016-06-24024 June 2016 Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval ML16020A0312016-02-16016 February 2016 Issuance of Amendment No. 237, Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability, Using Consolidated Line Item Improvement Process ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15098A2542015-05-11011 May 2015 Issuance of Amendment No. 234, Request to Revise Technical Specification 2.1.1.2 to Change Safety Limit Minimum Critical Power Ratio Values ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink 2024-05-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023) Richland, WA 99352-0968 June 24, 2016
SUBJECT:
COLUMBIA GENERATING STATION-RELIEF REQUEST FOR ALTERNATIVE 41Sl-03 FOR THE FOURTH 10-YEAR INSERVICE INSPECTION INTERVAL (CAC NO. MF7205)
Dear Mr. Reddemann:
By letter dated December 22, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15357A274), Energy Northwest (the licensee) submitted Relief Request 41Sl-03 to request authorization to continue to use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, 2001 Edition, 2003 Addenda as the plant repair/replacement program and plant inspection procedures until January 31, 2016, for Columbia Generating Station (CGS). Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1
), the licensee requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety. CGS entered the fourth 10-year inservice inspection (ISi) interval on December 13, 2015. The licensee was unable to implement a new ISi program prior to the expiration of the third 10-year interval for the fourth 10-year interval.
The ISi program would only be used for inspections or repair/replacement activities conducted prior to issuance of the ISi program plan for the fourth 10-year interval.
No Code repair/replacement or ISi work occurred between the licensee's submittal on December 22, 2015, and January 31, 2016. Verbal authorization of this relief request was granted by the U.S. Nuclear Regulatory Commission (NRC) on December 23, 2015 (ADAMS Accession No. ML 15357A350).
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that Energy Northwest's use of the proposed ISi program until January 31, 2016, provides an acceptable level of quality and safety, and the proposed alternative ISi program provides reasonable assurance of the leak tightness and structural integrity of the components that may be inspected.
Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1
). Therefore, the NRC authorizes the use of alternative 41Sl-03 to allow the use of the proposed ISi program at CGS until January 31, 2016.
M. Reddemann All other ASME Code,Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
If you have any questions regarding this matter, please contact the NRC Project Manager, John Klos, at (301) 415-5136 or via e-mail at John.Klos@nrc.gov.
Docket No. 50-397
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv Sincerely, Robert J. Pascarelli, Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FOR THE FOURTH 10-YEAR INSERVICE INSPECTION INTERVAL FOR RELIEF REQUEST 41Sl-03 ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397
1.0 INTRODUCTION
By letter dated December 22, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15357A274), Energy Northwest (the licensee) submitted Relief Request (RR) 41Sl-03 to request authorization to temporarily use the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, 2001 Edition with the 2003 Addenda for the plant repair/replacement program and plant inspection procedures until January 31, 2016, for Columbia Generating Station. Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1
), the licensee requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety. Verbal authorization of this relief request was granted by the U.S. Nuclear Regulatory Commission (NRC) staff on December 23, 2015 (ADAMS Accession No. ML 15357 A350).
2.0 REGULATORY EVALUATION
The licensee has requested relief from the requirements of 1 O CFR 50.55a(g)(5), which requires licensees to have an inservice inspection (ISi) program in place according to the requirements described in 10 CFR 50.55a(g)(4).
The licensee was unable to implement a new ISi program prior to the expiration of the third 10-year ISi interval.
Paragraph 55a(z) of 1 O CFR 50 states, in part, that alternatives to the requirements of 10 CFR 50.55a(b)-(h) may be used, when authorized by the Director, Office of Nuclear Reactor Regulation, if the licensee demonstrates that (1) the proposed alternative would provide an acceptable level of quality and safety or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Enclosure Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request and the Commission to authorize the alternative requested by the licensee.
3.0 TECHNICAL
EVALUATION
3.1 Licensee's
Relief Request ASME Code Components Affected All ASME Code Class 1, 2, 3, and MC welds, components, and their supports.
Applicable Code Edition and Addenda The applicable edition and addenda of the ASME Code,Section XI, for the fourth 10-year ISi interval is the 2007 Edition, 2008 Addenda. Reason for Request The licensee's refueling outage was completed in June 2015 and was the last outage of the third 10-year interval.
This coincided with the preparation, adoption, and implementation of the ISi program plan for the fourth 10-year interval.
The licensee was unable to issue the ISi program plan prior to entering the fourth 10-year interval.
Final approvals of the revised ISi program plan using the 2007 Edition, 2008 Addenda of ASME Code,Section XI, is expected in January 2016. Proposed Alternative The licensee proposed to utilize the 2001 Edition with the 2003 Addenda of the ASME Code,Section XI, as approved under the third 10-year interval plan for performing emergent repair/replacement and ISi activities.
ASME Code,Section XI, Appendix VIII will be implemented in accordance with 10 CFR 50.55a(b)(2)(xxiv).
The licensee therefore proposed to use the 2001 Edition of the ASME Code,Section XI, for Appendix VIII, as modified by 10 CFR 50.55a. Basis for Use The 2001 Edition with the 2003 Addenda of the ASME Code,Section XI, is currently incorporated by reference in 10 CFR 50.55a and provides an acceptable level of quality and safety. Duration of Proposed Alternative Relief is requested from the date of relief approval through January 31, 2016. 3.2 NRC Staff Evaluation Pursuant to 10 CFR 50.55a(z)(1
), the licensee proposed to utilize the 2001 Edition with 2003 Addenda of the ASME Code,Section XI, as approved under the third 10-year ISi interval plan for performing emergent repair/replacement and ISi activities.
The licensee also proposed to use the 2001 Edition of the ASME Code,Section XI, for Appendix VIII as modified by 10 CFR 50.55a. The licensee is requesting the use of this ISi program until January 31, 2016. The proposed alternative corresponds to the Code edition and addenda utilized during the third 10-year ISi interval.
No refueling outages or ISi inspections were conducted before January 31, 2016, and no unplanned ISi work was performed in this time period. The 2001 Edition with 2003 Addenda of the ASME Code, using the 2001 Edition of Appendix VIII, is incorporated by reference in 10 CFR 50.55a(a)(1)(ii).
Therefore, the NRC staff has determined that authorizing the alternative inspection program until January 31, 2016, provides an acceptable level of quality and safety.
4.0 CONCLUSION
As set forth above, the NRC staff has determined that the proposed alternative ISi program provides reasonable assurance of the leak tightness and structural integrity of the components that may be inspected.
The NRC staff has concluded that using the proposed ISi program until January 31, 2016, provides an acceptable level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1
). Therefore, the NRC authorizes the use of alternative Relief Request 41Sl-03 to allow the use of the proposed ISi program at the Columbia Generating Station until January 31, 2016. All other ASME Code,Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear I nservice Inspector.
Principal Contributor:
S. Cumblidge, NRR/DE/EPNB Date: June 24, 2016.
M. Reddemann All other ASME Code,Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
If you have any questions regarding this matter, please contact the NRC Project Manager, John Klos, at (301) 415-5136 or via e-mail at John.Klos@nrc.gov.
Docket No. 50-397
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-1 Reading RidsACRS_MailCTR Resource RidsNrrDeEpnb Resource RidsNrrDorllpl4-1 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsRgn4MailCenter Resource SCumblidge, NRR/DE JBowen, EDO RIV ADAMS Accession No. ML 16175A460 Sincerely, IRA/ Robert J. Pascarelli, Chief Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
- SE email dated OFFICE NRR/DORL/LPL4-1
/PM NRR/DORL/LPL4-1/LA NRR/DE/EPNB/BC*
NRR/DORL/LPL4-1/BC NAME JKlos JBurkhardt DAiiey RPascarelli DATE 6/24/16 6/24/16 5/31/16 6/24/16 OFFICIAL RECORD COPY