|
|
Line 1: |
Line 1: |
| #REDIRECT [[DCL-12-091, Withdrawal of License Amendment Request 11-06, Revision to Technical Specification 3.3.5. Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation.]] | | {{Adams |
| | | number = ML12272A098 |
| | | issue date = 09/27/2012 |
| | | title = Withdrawal of License Amendment Request 11-06, Revision to Technical Specification 3.3.5. Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. |
| | | author name = Welsch J M |
| | | author affiliation = Pacific Gas & Electric Co |
| | | addressee name = |
| | | addressee affiliation = NRC/NRR, NRC/Document Control Desk |
| | | docket = 05000275, 05000323 |
| | | license number = DPR-080, DPR-082 |
| | | contact person = |
| | | case reference number = DCL-12-091 |
| | | document type = Letter |
| | | page count = 2 |
| | | project = |
| | | stage = Withdrawal |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:Pacific Gas and Electr ic Company September 27, 2012 PG&E Letter DCL-12-091 James M. Welsch Stat ion Director Diablo Canyon Power Plant Mail Code 10 4/5/502 P. O. Box 56 Avila Beach, CA 93424 805.545.3242 Internal: |
| | 691.3242 Fax: 805.545.4234 Interne t: JMW1@pge.com U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 10 CFR 50.90 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Withdrawal of License Amendment Request 11-06 Revision to Technical Specification 3.3.5. "Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation" Pursuant to 10 CFR 2.107, Pacific Gas and Electric Company (PG&E) hereby withdraws License Amendment Request (LAR) 11-06, "Revision to Technical Specification 3.3.5, 'Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation,'" dated October 24,2011. Discrepancies with the current licensing basis and the control room dose analysis of record (AOR) associated with this LAR were identified that would require additional analysis and a revision to the AOR that is projected to be available in the first quarter of 2013 (greater than 1 year from the original LAR submittal date). PG&E intends to resolve these discrepancies by obtaining NRC approval of proposed changes to the control room dose AOR. PG&E is making the following regulatory commitment (as defined by NEI 99-04) in this letter: PG&E will resubmit an LAR to address the issues identified in LAR 11-06, with an additional request for approval of a proposed revision to the control room dose AOR, within 60 days of the completion of the revised control room dose AOR. If you have any questions or require additional information, please contact Mr. Tom Baldwin at (805) 545-4720. |
| | Sincerely, --Ii /Yl tAlt.L Welsch Interim Site Vice President A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway |
| | * Comanche Peak |
| | * Diablo Canyon |
| | * Palo Verde |
| | * San Onofre |
| | * South Texas Project |
| | * Wolf Creek m Document Control Desk Septem ber 27, 2012 I & Page 2 PG&E Letter DCL-12-091 pns3/6984/N50353334 cc: Elmo E. Collins, NRC Region IV Dean H. Overland, NRC Senior Resident Inspector Gonzalo L. Perez, California Dept of Public Health Joseph M. Sebrosky, NRR Project Manager Diablo Distribution A member of the STARS (Strateg i c Teaming and Resource Sharing) Alliance Callaway |
| | * Comanche Peak |
| | * Diablo Canyon |
| | * Palo Verde |
| | * San Onofre |
| | * South Texas Project |
| | * Wolf Creek}} |
Letter Sequence Withdrawal |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] |
Text
Pacific Gas and Electr ic Company September 27, 2012 PG&E Letter DCL-12-091 James M. Welsch Stat ion Director Diablo Canyon Power Plant Mail Code 10 4/5/502 P. O. Box 56 Avila Beach, CA 93424 805.545.3242 Internal:
691.3242 Fax: 805.545.4234 Interne t: JMW1@pge.com U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 10 CFR 50.90 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Withdrawal of License Amendment Request 11-06 Revision to Technical Specification 3.3.5. "Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation" Pursuant to 10 CFR 2.107, Pacific Gas and Electric Company (PG&E) hereby withdraws License Amendment Request (LAR) 11-06, "Revision to Technical Specification 3.3.5, 'Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation,'" dated October 24,2011. Discrepancies with the current licensing basis and the control room dose analysis of record (AOR) associated with this LAR were identified that would require additional analysis and a revision to the AOR that is projected to be available in the first quarter of 2013 (greater than 1 year from the original LAR submittal date). PG&E intends to resolve these discrepancies by obtaining NRC approval of proposed changes to the control room dose AOR. PG&E is making the following regulatory commitment (as defined by NEI 99-04) in this letter: PG&E will resubmit an LAR to address the issues identified in LAR 11-06, with an additional request for approval of a proposed revision to the control room dose AOR, within 60 days of the completion of the revised control room dose AOR. If you have any questions or require additional information, please contact Mr. Tom Baldwin at (805) 545-4720.
Sincerely, --Ii /Yl tAlt.L Welsch Interim Site Vice President A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Wolf Creek m Document Control Desk Septem ber 27, 2012 I & Page 2 PG&E Letter DCL-12-091 pns3/6984/N50353334 cc: Elmo E. Collins, NRC Region IV Dean H. Overland, NRC Senior Resident Inspector Gonzalo L. Perez, California Dept of Public Health Joseph M. Sebrosky, NRR Project Manager Diablo Distribution A member of the STARS (Strateg i c Teaming and Resource Sharing) Alliance Callaway