ML17124A125: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17124A125
| number = ML17124A125
| issue date = 04/18/2017
| issue date = 04/18/2017
| title = Beaver Valley Power Station, Units 1 and 2 - Submittal of 2016 Radioactive Effluent Release Report, 2016 Annual Radiological Environmental Operating Report, and 2016 Annual Environmental Operating Report (Non-Radiological)
| title = Submittal of 2016 Radioactive Effluent Release Report, 2016 Annual Radiological Environmental Operating Report, and 2016 Annual Environmental Operating Report (Non-Radiological)
| author name = Richey M L
| author name = Richey M L
| author affiliation = FirstEnergy Nuclear Operating Co
| author affiliation = FirstEnergy Nuclear Operating Co
Line 19: Line 19:


==SUBJECT:==
==SUBJECT:==
Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station P.O. Box4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 10 CFR 50.36a Submittal of 2016 Radioactive Effluent Release Report. 2016 Annual Radiological Environmental Operating Report. and 2016 Annual Environmental Operating Report (Non-Radiological) In accordance with 10 CFR 50.36a and Beaver Valley Power Station (BVPS) Unit Nos. 1 and 2 Technical Specifications 5.5.1, 5.6.1, *and 5.6.2, FirstEnergy Nuclear Operating Company (FENOC) hereby submits the BVPS 2016 Radioactive Effluent Release Report and the 2016 Annual Radiological Environmental Operating Report. These reports are provided in Enclosure A. FENOC also submits the 2016 Annual Environmental Operating Report (Non-Radiological) in accordance with the BVPS Unit No. 2 Operating License, Appendix B -Environmental Protection Plan. This report is provided in Enclosure B. There are no regylatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Donald J. Salera, Site Chemistry, at (724) 682-4141. Sincerely, . Marty L. RicH\ J;E1f -;J:. f: z_6 Beaver Valley Power Station Unit Nos. 1 and 2 L-17-126 Page2  
Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station P.O. Box4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 10 CFR 50.36a Submittal of 2016 Radioactive Effluent Release Report. 2016 Annual Radiological Environmental Operating Report. and 2016 Annual Environmental Operating Report (Non-Radiological)
In accordance with 10 CFR 50.36a and Beaver Valley Power Station (BVPS) Unit Nos. 1 and 2 Technical Specifications 5.5.1, 5.6.1, *and 5.6.2, FirstEnergy Nuclear Operating Company (FENOC) hereby submits the BVPS 2016 Radioactive Effluent Release Report and the 2016 Annual Radiological Environmental Operating Report. These reports are provided in Enclosure A. FENOC also submits the 2016 Annual Environmental Operating Report (Non-Radiological) in accordance with the BVPS Unit No. 2 Operating License, Appendix B -Environmental Protection Plan. This report is provided in Enclosure B. There are no regylatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Donald J. Salera, Site Chemistry, at (724) 682-4141.
Sincerely, .
Marty L. RicH\ J;E1f -;J:. f: z_6 Beaver Valley Power Station Unit Nos. 1 and 2 L-17-126 Page2  


==Enclosures:==
==Enclosures:==
A. 2016 Radioactive Effluent Release Report and 2016 Annual Radiological Environmental Operating Report B. 2016 Annual Environmental Operating Report (Non-Radiological) cc: NRC Region I Administrator NRC Resident Inspector NRR Project Manager Director BRP/DEP Site BRP/DEP Representative NRG Region I Health Physics Inspector   
A. 2016 Radioactive Effluent Release Report and 2016 Annual Radiological Environmental Operating Report B. 2016 Annual Environmental Operating Report (Non-Radiological) cc: NRC Region I Administrator NRC Resident Inspector NRR Project Manager Director BRP/DEP Site BRP/DEP Representative NRG Region I Health Physics Inspector   
, .. Enclosure A L-17-126 2016 Radioactive Effluent Release Report and 2016 Annual Radiological Environmental Operating Report (Reports follow).   
, .. Enclosure A L-17-126 2016 Radioactive Effluent Release Report and 2016 Annual Radiological Environmental Operating Report (Reports follow).   
.-' L_ ., Enclosure B L-17-126 2016 Annual Environmental Operating Report (Non-Radiological) (Report follows)
.-' L_ ., Enclosure B L-17-126 2016 Annual Environmental Operating Report (Non-Radiological) (Report follows)}}
}}

Latest revision as of 07:03, 16 March 2019

Submittal of 2016 Radioactive Effluent Release Report, 2016 Annual Radiological Environmental Operating Report, and 2016 Annual Environmental Operating Report (Non-Radiological)
ML17124A125
Person / Time
Site: Beaver Valley
Issue date: 04/18/2017
From: Richey M L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-17-126
Download: ML17124A125 (4)


Text

-. ' ,. I *-. FE NOCŽ RrstEnergy Nuclear Operating Company Marty L. Richey Site Vice President April 18, 2017 L-17-126 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station P.O. Box4 Shippingport, PA 15077 724-682-5234 Fax: 724-643-8069 10 CFR 50.36a Submittal of 2016 Radioactive Effluent Release Report. 2016 Annual Radiological Environmental Operating Report. and 2016 Annual Environmental Operating Report (Non-Radiological)

In accordance with 10 CFR 50.36a and Beaver Valley Power Station (BVPS) Unit Nos. 1 and 2 Technical Specifications 5.5.1, 5.6.1, *and 5.6.2, FirstEnergy Nuclear Operating Company (FENOC) hereby submits the BVPS 2016 Radioactive Effluent Release Report and the 2016 Annual Radiological Environmental Operating Report. These reports are provided in Enclosure A. FENOC also submits the 2016 Annual Environmental Operating Report (Non-Radiological) in accordance with the BVPS Unit No. 2 Operating License, Appendix B -Environmental Protection Plan. This report is provided in Enclosure B. There are no regylatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Donald J. Salera, Site Chemistry, at (724) 682-4141.

Sincerely, .

Marty L. RicH\ J;E1f -;J:. f: z_6 Beaver Valley Power Station Unit Nos. 1 and 2 L-17-126 Page2

Enclosures:

A. 2016 Radioactive Effluent Release Report and 2016 Annual Radiological Environmental Operating Report B. 2016 Annual Environmental Operating Report (Non-Radiological) cc: NRC Region I Administrator NRC Resident Inspector NRR Project Manager Director BRP/DEP Site BRP/DEP Representative NRG Region I Health Physics Inspector

, .. Enclosure A L-17-126 2016 Radioactive Effluent Release Report and 2016 Annual Radiological Environmental Operating Report (Reports follow).

.-' L_ ., Enclosure B L-17-126 2016 Annual Environmental Operating Report (Non-Radiological) (Report follows)