|
|
Line 2: |
Line 2: |
| | number = ML060440546 | | | number = ML060440546 |
| | issue date = 02/02/2006 | | | issue date = 02/02/2006 |
| | title = North Anna, Units 1 & 2, Surry, Units 1 & 2, Relief, Containment Relief Request IWL1 | | | title = Surry, Units 1 & 2, Relief, Containment Relief Request IWL1 |
| | author name = Marinos E C | | | author name = Marinos E C |
| | author affiliation = NRC/NRR/ADRO/DORL | | | author affiliation = NRC/NRR/ADRO/DORL |
Surry, Units 1 & 2, Relief, Containment Relief Request IWL1ML060440546 |
Person / Time |
---|
Site: |
Surry, North Anna |
---|
Issue date: |
02/02/2006 |
---|
From: |
Marinos E C Plant Licensing Branch III-2 |
---|
To: |
Christian D A Virginia Electric & Power Co (VEPCO) |
---|
Monarque, S R, NRR/DORL, 415-1544 |
References |
---|
TAC MC8736, TAC MC8737, TAC MC8738, TAC MC8739 |
Download: ML060440546 (5) |
|
|
---|
Category:Code Relief or Alternative
MONTHYEARML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML23244A2352023-09-18018 September 2023 – Request to Use a Subsequent Edition of the ASME Code, Section XI ML23102A2832023-04-25025 April 2023 ASME OM Code Inservice Testing Program Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing ML23073A1912023-04-21021 April 2023 Alternative for Inservice Inspections of Pressurizer and Steam Generator Weld Examinations ML22342A1002022-12-0707 December 2022 Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles ML22196A1972022-07-28028 July 2022 Request for Relief Request N2-I4-LMT-004 Inservice Inspection Limitations ML22019A0022022-03-0808 March 2022 Regarding Request to Utilize Code Case OMN-28 ML20364A0402021-01-15015 January 2021 Request for Relief Request N1-I4-LMT-003 Inservice Inspection Limitations ML19135A3242019-05-21021 May 2019 Inservice Inspection Alternative Request N1-I4-CS-002 ML19092A4172019-04-15015 April 2019 Unit Nos.1 and 2 Inservice Inspection Alternative Requests N1-I5-NDE-001 and N2 I5 NDE 001 ML19043A8242019-03-15015 March 2019 Relief Requests Examination Coverage for Pressurizer Nozzle Inner Radius Sections and Certain Stainless Steel Piping Welds (S2-15-LMT-CO1 and S2-15-LMT-P01) ML18331A0602019-02-28028 February 2019 Relief Requests Regarding Examination Coverage for Pressurizer Nozzle Inner Radius Section and Certain Stainless Steel Piping Welds (S1-I5-LMT-C01 and S1-I5-LMT-P01) ML19039A2362019-02-14014 February 2019 Inservice Inspection Alternative N2-I4-NDE-007 ML18236A2362018-09-26026 September 2018 Relief from the Requirements of the ASME Code - Proposed Alternatives S1-I5-ISI-04 and S2-I5-ISI-04 ML18234A1332018-08-15015 August 2018 ASME Section XI Inservice Program Relief Requests N1-15-CMP-001 and N2-15-CMP-001 Proposed Alternative - Use of Paut in Lieu of Rt ML18068A0642018-03-26026 March 2018 Relief from the Requirements of the ASME Code Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) ML18029A1842018-02-0202 February 2018 Proposed Inservice Inspection Alternatives N1-I4-NDE-010 and N2-I4-NDE-005 (CAC Nos. MF9534 and MF9535; EPID L-2017-LLR-0029) ML18005A1092018-01-10010 January 2018 Relief Request (RR) N1-I4-LMT-002, Limited Coverage Examinations for the Fourth Ten-Year Inspection Interval (CAC No. MF9689; EPID L-2017-LLR-0024) ML17303A0682017-12-20020 December 2017 Nonproprietary Relief from the Requirements of the ASME Code (CAC Nos. MF8987 and MF8988; EPID L-2016-LLR-0019) ML17221A2522017-08-17017 August 2017 Proposed Alternative to Implement Code Case N-839 ML17053A2432017-07-21021 July 2017 Relief Request (RR) N1-I4-NDE-008, and N2-I4-NDE-003 Inservice Inspection Program ML17121A0362017-04-24024 April 2017 ASME Section XI Inservice Inspection Program Relief Request N1-I4-LMT-002 - Fourth Interval Period 2 Limited Examinations ML16365A1182017-02-17017 February 2017 Requests for Relief LMT-R01, LMT-SS01, LMT-CS01, LMT-P01, LMT-C01, LMT-C02, LMT-C03, and LMT-C04 - for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML16208A0092016-08-24024 August 2016 Requests for Relief LMT-R01, LMT-R02, LMT-R03, LMT-P01, and LMT-C01, Alternatives to ASME Code Requirements for Limited Coverage from the Requirements of the ASME Code ML16028A4342016-03-0101 March 2016 Relief Request (RR) N1-I4-SPT-006, Inservice Inspection Program ML15091A6872015-06-25025 June 2015 Relief Request (RR) N2-I4-NDE-002, Inservice Inspection Program ML15023A4412015-03-16016 March 2015 Alternatives to the Requirements of the ASME Code and Use of a Subsequent Edition and Addenda of the ASME B&PV Code, Section XI ML15029A4242015-02-10010 February 2015 Fifth 10-Year Inservice Inspection Interval Request for Subsequent Edition/Addenda ML15023A2192015-02-0303 February 2015 Relief Request (RR) N2-I4-LMT-002, Limited Examinations for the Fourth Ten-Year Inspection Interval Period ML14309A6662014-11-25025 November 2014 Relief from the Requirements of the ASME Code ML14125A4712014-05-0909 May 2014 Relief from the Requirements of the ASME Code ML14115A1992014-04-30030 April 2014 Relief from the Requirements of the ASME OM Code ML14113A3462014-04-25025 April 2014 Relief from the Requirements of the ASME Code ML13234A3532013-08-30030 August 2013 Relief Request (RR) N1-I4-LMT-001, Limited Examinations for the Fourth Ten-Year Inspection Interval Period 1 ML13204A2972013-08-0101 August 2013 Relief from the Requirements of the ASME Code (Tacs. MF0329 and MF0330) ML13106A1402013-04-30030 April 2013 Relief from the Requirements of the ASME Code Section XI for the Fourth Ten-Year Inservice Inspection Program Interval ML12348A0082012-11-0909 November 2012 ASME Section XI Inservice Inspection (Isl) Program Request for Alternative - Reactor Vessel Nozzle to Safe End Butt Welds Examination Relief Requests CMP-008 and CMP-010 ML12227A7732012-08-17017 August 2012 Relief Request N2-13-PRT-002, Limited Coverage Examinations for the Third 10-Year Inservice Inspection Interval ML12130A2172012-04-25025 April 2012 ASME Section XI Inservice Inspection (ISI) Program Request for Alternative - Implementation of Extended Reactor Vessel Inservice Inspection Interval Relief Requests CMP-007 and CMP-009 ML11270A1222011-09-21021 September 2011 ASME Section Xl Inservice Inspection Program Relief Request N2-I3-PRT-002 - Limited Coverage Examinations Performed in the Third Ten-Year Inspection Interval ML1102600222011-01-28028 January 2011 Fourth 10-Year Inservice Inspection Interval, Relief Request N2-I4-CS-001 ML1100600112011-01-0707 January 2011 (Naps), Unit No. 1, Third 10-Year Inservice Inspection Interval (ISI) Program, Relief Request (RR) N1-13-PRT-004, Part a Through Part G ML1024602232010-09-30030 September 2010 Fourth 10-Year Interval Inservice Inspection (ISI) Program, Pumps and Valves ML1019303072010-07-12012 July 2010 Request for Relieft N1-13-PRT-004 ML1005604302010-02-23023 February 2010 ASME Section XI Inservice Inspection Program Relief Request N1-14-RI-001 and N2-14-RI-001 Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 ML0930003522009-10-27027 October 2009 Submittal of Relief Request SPT-004, Revision 2, SPT-003, Revision 2 and Elimination of NRC Bulletin 2003-02 Commitment ML0910705392009-04-17017 April 2009 Use of Alternative Class 1 Pressure Test Requirements Relief Request SPT-014 ML0814400142008-06-0909 June 2008 Third 10-Year Inservice Inspection Interval Relief Requests CMP-023 and CMP-024 2024-08-12
[Table view] Category:Letter
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection 2024-09-03
[Table view] |
Text
February 2, 2006Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 (NORTH ANNA) ANDSURRY POWER STATION, UNIT NOS. 1 AND 2 (SURRY) - CONTAINMENT RELIEF REQUEST IWL1 (TAC NOS. MC8736, MC8737, MC8738, AND MC8739)By letter dated October 19, 2005, Virginia Electric and Power Company (VEPCO) submittedproposed Relief Request IWL1 for the second 10-year containment inservice inspection (ISI) program at North Anna and Surry. VEPCO is requesting relief from the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section50.55a(b)(2)(viii)(F). VEPCO is requesting this relief in order to allow for the ResponsibleEngineer, described in the American Society of Mechanical Engineers, Boiler and PressureVessel Code (ASME Code),Section XI, Paragraph IWL-2320, to perform examinations withoutmeeting the qualification and certification requirements of ASME Code, Paragraph IWA-2300. The Nuclear Regulatory Commission (NRC) staff has reviewed this submittal and is providingthe following comments. 1. VEPCO requested relief from the requirements of 10 CFR 50.55a(b)(2)(viii)(F) pursuantto 10 CFR 50.55a(a)(3), which states "Proposed alternatives to the requirements of paragraphs (c), (d), (e), (f), (g) and (h) of this section..." The NRC staff has determinedthat relief from the cited requirements cannot be granted under 10 CFR 50.55a(a)(3) asthe requirement from which relief is sought, is located in 10 CFR 50.55a(b). In addition, VEPCO stated that this proposed relief was similar to Relief Request IWL3,which was submitted to the NRC staff on February 11, 1999, and subsequentlyapproved on August 23, 1999. However, in Relief Request IWL3, VEPCO requested relief from Subsection IWL of the 1992 edition with the 1992 addenda of ASME Code,Section XI, and not from the requirements of 10 CFR 50.55a. Because the NRC staffcan only grant relief from the ASME Code and not from the requirements of 10 CFR 50.55a(b)(2)(viii)(F), Relief Request IWL1 cannot be approved. As such, the NRC staffrequests the licensee submit a request for an exemption under 10 CFR 50.12 "Specific Exemptions," if justified.2. Please clarify how a Responsible Engineer would acquire the proficiency that Nondestructive Testing personnel obtain by following the station procedure that was developed using the standard of the American National Standards Institute/American Society of Nondestructive Testing (ASNT), CP-189, "ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel." For example, this experience D. Christian includes using the different tools that aid in the identification of degraded concrete,reinforcing and pre-stressing hardware.VEPCO is requested to provide a submittal superceding the October 19, 2005, letter,requesting an exemption from 10 CFR Part 50 and addressing the NRC staff's comments. TheNRC staff has completed its evaluation of this request; and, therefore, we are closing TAC Nos. MC8736, MC8737, MC8738, and MC8739.Sincerely,/by LOlshan for/Evangelos C. Marinos, ChiefPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-338, 50-339,50-280, and 50-281cc: See next page D. Christian includes using the different tools that aid in the identification of degraded concrete,reinforcing and pre-stressing hardware.VEPCO is requested to provide a submittal superceding the October 19, 2005, letter,requesting an exemption from 10 CFR Part 50 and addressing the NRC staff's comments. TheNRC staff has completed its evaluation of this request; and, therefore, we are closing TAC Nos. MC8736, MC8737, MC8738, and MC8739.Sincerely,/by LOlshan for/Evangelos C. Marinos, ChiefPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-338, 50-339,50-280, and 50-281cc: See next pageDistribution:RidsAcrsAcnwMailCenter RidsRgn2MailCenter(KLandis)PUBLICRidsNrrPMSMonarqueRidsNrrEgcb(RKaras)
LPL2-1 Rdg.RidsNrrLAMO'Brien (2)BWetzel, EDO RII RidsOgcRpRidsNrrLplc(EMarinos)BSingal, DORL DPRRidsNrrEgcb(SSamaddar)
RidsNrrEgcb(HAshar)ADAMS ACCESSION NO. ML060440546 *NLO NRR-028OFFICENRR/LPL2-1/PMNRR/LPL2-1/LANRR/EGCB/BCOGCNRR/LPL2-1/BCNAMESMonarque:srmMO'BrienRKarasSHamrick*EMarinos DATE1/18/061/18/061/18/061/23/062/2/06 OFFICIAL RECORD COPYNorth Anna Power Station, Units 1 & 2 cc:Mr. C. Lee LintecumCounty Administrator Louisa County Post Office Box 160 Louisa, Virginia 23093Ms. Lillian M. Cuoco, Esq.Senior Counsel Dominion Resources Services, Inc.
Building 475, 5 th floorRope Ferry Road Waterford, Connecticut 06385Dr. W. T. LoughVirginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218Old Dominion Electric Cooperative4201 Dominion Blvd.
Glen Allen, Virginia 23060Mr. Chris L. Funderburk, DirectorNuclear Licensing & Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711Office of the Attorney GeneralCommonwealth of Virginia 900 East Main Street Richmond, Virginia 23219Senior Resident InspectorNorth Anna Power Station U. S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117 Surry Power Station, Units 1 & 2 cc:Ms. Lillian M. Cuoco, Esq.Senior Counsel Dominion Resources Services, Inc.
Building 475, 5th Floor Rope Ferry Road Waterford, Connecticut 06385Mr. Donald E. JerniganSite Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883-0315Senior Resident InspectorSurry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883ChairmanBoard of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683Dr. W. T. LoughVirginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218Dr. Robert B. Stroube, MD, MPHState Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia 23218Office of the Attorney GeneralCommonwealth of Virginia 900 East Main Street Richmond, Virginia 23219Mr. Chris L. Funderburk, DirectorNuclear Licensing & Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711