Letter Sequence Other |
---|
EPID:L-2018-LLR-0128, ASME Section XI Inservice Inspection Program Request for Proposed Alternative N1-I4-CS-002 Snubber Program Extension (Open) |
|
MONTHYEARML18275A1052018-09-26026 September 2018 ASME Section XI Inservice Inspection Program Request for Proposed Alternative N1-I4-CS-002 Snubber Program Extension Project stage: Request ML18298A1552018-10-23023 October 2018 Acceptance for Review - Proposed Alternative N1-14-CS-002 - Snubber Program Extension for North Anna Unit 1 Project stage: Acceptance Review ML19135A3242019-05-21021 May 2019 Inservice Inspection Alternative Request N1-I4-CS-002 Project stage: Other 2018-09-26
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML22196A1972022-07-28028 July 2022 Request for Relief Request N2-I4-LMT-004 Inservice Inspection Limitations ML22019A0022022-03-0808 March 2022 Regarding Request to Utilize Code Case OMN-28 ML20364A0402021-01-15015 January 2021 Request for Relief Request N1-I4-LMT-003 Inservice Inspection Limitations ML19135A3242019-05-21021 May 2019 Inservice Inspection Alternative Request N1-I4-CS-002 ML19092A4172019-04-15015 April 2019 Unit Nos.1 and 2 Inservice Inspection Alternative Requests N1-I5-NDE-001 and N2 I5 NDE 001 ML19039A2362019-02-14014 February 2019 Inservice Inspection Alternative N2-I4-NDE-007 ML18234A1332018-08-15015 August 2018 ASME Section XI Inservice Program Relief Requests N1-15-CMP-001 and N2-15-CMP-001 Proposed Alternative - Use of Paut in Lieu of Rt ML18029A1842018-02-0202 February 2018 Proposed Inservice Inspection Alternatives N1-I4-NDE-010 and N2-I4-NDE-005 (CAC Nos. MF9534 and MF9535; EPID L-2017-LLR-0029) ML18005A1092018-01-10010 January 2018 Relief Request (RR) N1-I4-LMT-002, Limited Coverage Examinations for the Fourth Ten-Year Inspection Interval (CAC No. MF9689; EPID L-2017-LLR-0024) ML17221A2522017-08-17017 August 2017 Proposed Alternative to Implement Code Case N-839 ML17053A2432017-07-21021 July 2017 Relief Request (RR) N1-I4-NDE-008, and N2-I4-NDE-003 Inservice Inspection Program ML17121A0362017-04-24024 April 2017 ASME Section XI Inservice Inspection Program Relief Request N1-I4-LMT-002 - Fourth Interval Period 2 Limited Examinations ML16028A4342016-03-0101 March 2016 Relief Request (RR) N1-I4-SPT-006, Inservice Inspection Program ML15091A6872015-06-25025 June 2015 Relief Request (RR) N2-I4-NDE-002, Inservice Inspection Program ML15023A2192015-02-0303 February 2015 Relief Request (RR) N2-I4-LMT-002, Limited Examinations for the Fourth Ten-Year Inspection Interval Period ML13234A3532013-08-30030 August 2013 Relief Request (RR) N1-I4-LMT-001, Limited Examinations for the Fourth Ten-Year Inspection Interval Period 1 ML12227A7732012-08-17017 August 2012 Relief Request N2-13-PRT-002, Limited Coverage Examinations for the Third 10-Year Inservice Inspection Interval ML11270A1222011-09-21021 September 2011 ASME Section Xl Inservice Inspection Program Relief Request N2-I3-PRT-002 - Limited Coverage Examinations Performed in the Third Ten-Year Inspection Interval ML1102600222011-01-28028 January 2011 Fourth 10-Year Inservice Inspection Interval, Relief Request N2-I4-CS-001 ML1100600112011-01-0707 January 2011 (Naps), Unit No. 1, Third 10-Year Inservice Inspection Interval (ISI) Program, Relief Request (RR) N1-13-PRT-004, Part a Through Part G ML1024602232010-09-30030 September 2010 Fourth 10-Year Interval Inservice Inspection (ISI) Program, Pumps and Valves ML1019303072010-07-12012 July 2010 Request for Relieft N1-13-PRT-004 ML1005604302010-02-23023 February 2010 ASME Section XI Inservice Inspection Program Relief Request N1-14-RI-001 and N2-14-RI-001 Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 ML0910705392009-04-17017 April 2009 Use of Alternative Class 1 Pressure Test Requirements Relief Request SPT-014 ML0814400142008-06-0909 June 2008 Third 10-Year Inservice Inspection Interval Relief Requests CMP-023 and CMP-024 ML0714403422007-08-0303 August 2007 Relief Request to Use Portion of 2001 Edition of American Society of Mechanical Engineers Code ML0604505172006-02-0909 February 2006 Unit No'S. 1 and 2 ASME Code Third 10-year ISI Program. (TAC No'S MC5588, MC5589, MC5590, MC5591, MC5592, MC5593, MC5594, MC5595, MC5599 and MC5600) ML0604405462006-02-0202 February 2006 Relief, Containment Relief Request IWL1 ML0522702752005-08-24024 August 2005 Relief Request, Snubber Visual Examination and Functional Testing (Tac No. MC5451, MC5452) ML0507000502005-03-10010 March 2005 RR, (Tac MC3317) ML0501804952005-01-10010 January 2005 ASME Section XI Inservice Inspection Program, End of Intervals System Pressure Testing ML0412700022004-05-0404 May 2004 Request to Use Code Case N-663 as an Alternative for Surface Examination of ASME Code Class 2 Piping Welds(Tac MC2489, MC2490, MC2491, MC2523 & MC2524) ML0331700242003-10-13013 October 2003 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Relief Request CMP-020 ML0326602352003-09-23023 September 2003 N. Anna, Units 1 & 2 - Risk-Informed Inservice Inspection Relief Request R-1 ML0316814082003-06-0505 June 2003 Risk-Informed ISI Relief Requests R-1 Response to Request for Additional Information ML0302303502003-01-23023 January 2003 Relief Request, Repair Technique for Reactor Vessel Head Penetrations ML0301500042003-01-14014 January 2003 Relief Request, ASME Section XI, Inservice Inspection Program, RR-IWE9 for Containment Testing ML0233303662002-11-14014 November 2002 ASME Section XI Inservice Inspection Program Relief Request IWE9 Containment Testing ML0215102442002-05-20020 May 2002 Code Relief Request, Alternative Repair Techniques for Reactor Vessel Heads CMP-16 & CMP-17 ML0213600242002-05-14014 May 2002 ASME Section XI Inservice Inspection (ISI) Program Relief Request Partial-1. Table - North Anna, Unit 2 - Reactor Vessel Outlet Nozzle to Shell Welds 10, 12 & 14 ML0204506472002-02-13013 February 2002 ASME Section XI Inservice Inspection (ISI) Program Relief Request NDE-Partial-2, TAC No. MB1129 2022-07-28
[Table view] Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Safety Evaluation
MONTHYEARML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23181A1352023-08-22022 August 2023 Issuance of Amendment Nos. 295 and 278 License Amendment Request to Remove the Refueling Water Chemical Addition Tank and Change the Containment Sump Ph Buffer ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML21320A0072022-09-0707 September 2022 Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) ML22196A1972022-07-28028 July 2022 Request for Relief Request N2-I4-LMT-004 Inservice Inspection Limitations ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22068A0712022-03-22022 March 2022 Issuance of Amendment Nos. 292 and 275 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22019A0022022-03-0808 March 2022 Regarding Request to Utilize Code Case OMN-28 ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML21323A1742021-12-22022 December 2021 Issuance of Amendment Nos. 289 and 272 to Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A ML21232A2172021-10-19019 October 2021 Issuance of Amendment Nos. 288 and 271 to Revise Technical Specifications Battery Surveillance Testing ML21264A0112021-10-18018 October 2021 Safety Evaluation Report Related to the Subsequent License Renewal of North Anna Power Station, Units 1 and 2 ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML20325A0952021-03-19019 March 2021 Issuance of Amendment to Revise Technical Specifications to Allow Usage of a Small Break Loss of Coolant Accident Methodology (Non-Proprietary) ML20364A0402021-01-15015 January 2021 Request for Relief Request N1-I4-LMT-003 Inservice Inspection Limitations ML20350B8062020-12-28028 December 2020 Request for Relief Request N1-I5-NDE-002 Inservice Inspection Alternative ML20302A1792020-10-29029 October 2020 Non-Proprietary, Issuance of Amendment Nos. 286 and 269 to Revise Technical Specifications to Allow Usage of a Full Spectrum Loss of Coolant Accident Methodology ML20253A3292020-09-30030 September 2020 Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency ML20252A0042020-09-23023 September 2020 Request for Relief Request Fifth 10-Year Interval ML20252A0072020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI ML20031E7842020-02-19019 February 2020 Request for Relief Request P-9 to Defer Performance of Comprehensive Pump Test ML19319A5832020-01-17017 January 2020 Issuance of Amendment Nos. 285 and 268 to Revise Technical Specifications Regarding Emergency Diesel Generator Maximum Voltage Limits ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19274C9982019-11-13013 November 2019 Issuance of Amendments Regarding Installation of Water Headers in Flood Protection Dike ML19238A1272019-09-12012 September 2019 Issuance of Amendment Nos. 282 and 265 to Revise Technical Specifications Regarding Open Phase Protection ML19143A3422019-05-29029 May 2019 Inservice Inspection Alternative Request N2-I4-LMT-003 ML19140A2882019-05-28028 May 2019 Inservice Inspection Alternative Requests N1-I5-CMP-001 and N2-I5-CMP-001 ML19135A3242019-05-21021 May 2019 Inservice Inspection Alternative Request N1-I4-CS-002 ML19093B2742019-04-15015 April 2019 Inservice Inspection Alternative Requests N1-I5-SPT-001 and N2 I5 Spt 001 ML19092A4172019-04-15015 April 2019 Unit Nos.1 and 2 Inservice Inspection Alternative Requests N1-I5-NDE-001 and N2 I5 NDE 001 ML19031B2272019-02-27027 February 2019 Issuance of Amendment Nos. 281, 264, 294, and 294 to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes ML19039A2362019-02-14014 February 2019 Inservice Inspection Alternative N2-I4-NDE-007 ML18290A8522018-11-27027 November 2018 Issuance of Amendments 280, 263 to Revise Technical Specifications Regarding Ventilation System Surveillance Requirements in Accordance with TSTF-522 ML18225A0202018-08-29029 August 2018 ISFSI; North Anna 1 & 2 Isfsls, and Unit 3; Surry Power 1 & 2, and Isfsls); Dominion Energy Kewaunee, Inc. (Kewaunee Power Station and Isfsi): Request for Threshold Determination Under 10 CFR 50.80 ML18180A1972018-07-27027 July 2018 Issuance of Amendments to Revise Technical Specifications Regarding New and Spent Fuel Storage (CAC Nos. MF9712 and MF9713, EPID L-2017-LLA-0240) ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) ML18029A1842018-02-0202 February 2018 Proposed Inservice Inspection Alternatives N1-I4-NDE-010 and N2-I4-NDE-005 (CAC Nos. MF9534 and MF9535; EPID L-2017-LLR-0029) ML18019A1952018-01-24024 January 2018 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination (CAC Nos. MF9923, MF9924, MF9925, MF9926, MF9927, and MF9928; EPID L-2017-LLR-0060) ML18005A1092018-01-10010 January 2018 Relief Request (RR) N1-I4-LMT-002, Limited Coverage Examinations for the Fourth Ten-Year Inspection Interval (CAC No. MF9689; EPID L-2017-LLR-0024) ML17332A0782017-12-12012 December 2017 ISFSI; Millstone and ISFSI; North Anna and ISFSI; Surry and ISFSI - Request for Approval of Revision 24 of the Nuclear Facility Quality Assurance Program Description Topical Report, DOM-QA-1 (CAC Nos. MF9732-MF9739; EPID L-2017-LLQ-0001) ML17332A6632017-12-0606 December 2017 Proposed Inservice Inspection Alternatives N1-I4-NDE-009 and N2-I4-NDE-004 (CAC Nos. MF9298 and MF9299; EPID L-2016-LLR-0018) ML17221A2522017-08-17017 August 2017 Proposed Alternative to Implement Code Case N-839 ML17053A2432017-07-21021 July 2017 Relief Request (RR) N1-I4-NDE-008, and N2-I4-NDE-003 Inservice Inspection Program ML17046A3162017-04-0606 April 2017 Connecticut, Virginia, Millstone, North Anna, Surry, Submission of Revision 21 of the Quality Assurance Topical Report for NRC Approval and Submission Revision 22 for Information Only (CAC Nos. MF8128 - MF8234) ML16252A4782016-10-17017 October 2016 Issuance of Amendments Revising Technical Specifications to Address the Issue Identified in Westinghouse NSAL-09-5, Revision 1, and NSAL-15-1, Revision 0 ML16209A4132016-07-27027 July 2016 Safety Evaluation For North Anna Power Station, Units 1 And 2, Proposed License Amendment To Revise The Technical Specifications To Address The Issue Identified In Westinghouse Documents NSAL-09-5. Rev. 1 and NSAL-15-I (TAC No. MF7186 and MF7187) ML16028A4342016-03-0101 March 2016 Relief Request (RR) N1-I4-SPT-006, Inservice Inspection Program ML16013A4442016-02-22022 February 2016 (NAPS) - Issuance of Amendment for Changes to Technical Specification (TS) 3.8.1 - AC Sources, Operating Revised Surveillance Requirement ML15307A3002016-02-0202 February 2016 (NAPS) - Issuance of Amendments for Changes to the Emergency Action Level Revisions - Correction of Equipment Mark Number 2023-08-22
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 21, 2019 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT:
NORTH ANNA POWER STATION, UNIT NO. 1 - INSERVICE INSPECTION ALTERNATIVE REQUEST N1-14-CS-002 (EPID L-2018-LLR-0128)
Dear Mr. Stoddard:
By letter dated September 26, 2018 (Agencywide Documents Access and Management System Accession No. ML18275A105), Virginia Electric and Power Company (the licensee) submitted a request for a proposed alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, to the U.S. Nuclear Regulatory Commission (NRC) for the North Anna Power Station (North Anna), Unit No. 1.
Pursuant to Title 10 of the Code of Federal Regulations ( 10 CFR), Part 50, Paragraph 55a(z)(2),
the licensee requested the NRC to authorize the use of an alternative to allow an extension to the snubber examination and testing program for the fourth 10-year inservice inspection (ISi) interval for North Anna, Unit No. 1, on the basis that compliance with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that complying with the ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the NRC staff authorizes the use of alternative request N1-14-CS-002 for North Anna, Unit No. 1 for the fourth 10-year ISi program interval for snubbers, which began on May 1, 2009, and is now scheduled to end on December 14, 2020. Additionally, alternative request N 1-14-CS-001, Revision 1, for North Anna, Unit No. 1, authorized previously by the NRC staff is now authorized under 10 CFR 50.55a(z)( 1) for the extended fourth ISi 10-year interval for snubbers, from May 1, 2009, through December 14, 2020.
All other ASME OM Code requirements for which relief was not specifically requested and approved in the subject request for alternative remain applicable.
D. Stoddard If you have any questions, please contact the Project Manager, Randy Hall, at 301-415-4032 or via e-mail at Randy.Hall@nrc.gov.
Sincerely,
~~4 Michael T. Markley, Chief Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-338
Enclosure:
Safety Evaluation cc: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ALTERNATIVE N1-14-CS-002 RELATED TO FOURTH & FIFTH 10-YEAR INTERVAL INSERVICE INSPECTION & TESTING PROGRAM VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)
NORTH ANNA POWER STATION, UNIT NO. 1 DOCKET NO. 50-338
1.0 INTRODUCTION
By letter dated September 26, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18275A105), Virginia Electric and Power Company (Dominion Energy Virginia, the licensee) submitted an alternative to the requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel (ASME BPV) Code Section XI "Rules for lnservice Inspection of Nuclear Power Station Components," associated with snubber examination and testing at the North Anna Power Station (North Anna) Unit No. 1.
Specifically, pursuant to Title 1O of the Code of Federal Regulations (10 CFR) 50.55a(z)(2), the licensee requested to use the proposed alternative in request N1-14-CS-002 on the basis that the ASME BPV Code Section XI requirements present an undue hardship, without a compensating increase in the level of quality and safety.
The North Anna, Unit No. 1 fourth 10-year inservice inspection (ISi) program interval started on May 1, 2009 and is scheduled to end on April 30, 2019. This proposed alternative requests an extension of the North Anna, Unit No. 1, fourth 10-year ISi interval for snubber examination and testing until December 14, 2020.
2.0 REGULATORY EVALUATION
Regulations in 10 CFR 50.55a(g), "Preservice and lnservice Inspection Requirements," states, in part, that ISi of certain ASME Code Class 1, 2, and 3 components (including supports) be performed in accordance with the specified ASME BPV Code Section XI (or ASME Operation and Maintenance of Nuclear Power Plant (OM) Code for snubber examination and testing) and applicable addenda incorporated by reference in the regulations.
Regulations in 10 CFR 50.55a(b)(3)(v)(A), "Snubbers: First provision," states, in part, that licensees may use Subsection ISTD, "Preservice and lnservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Power Plants," of the ASME OM Code 1995 Edition through the latest edition and addenda incorporated by reference in Enclosure
10 CFR 50.55a(a)(1 )(iv), in place of the requirements for snubbers in the editions and addenda up to the 2005 Addendum of the ASME BPV Code Section XI.
Regulations in 10 CFR 50.55a(b)(3)(v)(B), "Snubbers: Second provision," states, in part, that licensees must use Subsection ISTD of the ASME OM Code for snubber examination and testing when using 2006 addenda and later editions and addenda of Section XI of the ASME BPV Code.
Regulations in 10 CFR 50.55a(z) states that alternatives to the requirements of paragraphs (b) through (h) of 10 CFR 50.55a may be used, when authorized by the Nuclear Regulatory Commission (NRC), if the licensee demonstrates that: (1) the proposed alternatives provide an acceptable level of quality and safety, or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
3.0 TECHNICAL EVALUATION
The licensee has requested to use the proposed alternative described below for the North Anna, Unit No. 1, snubber program. The proposed alternative for the snubber program encompasses the total number of Unit No. 1 snubbers inspected as safety-related, which includes 326 small-bore (8-inch bore and less) snubbers and 12 large-bore snubbers (attached to steam generators).
3.1 Licensee's Alternative Request N1-14-CS-002 The licensee requested an alternative to the snubber examination and testing requirements of the ASME BPV Code Section XI for all snubbers within the scope of the North Anna, Unit No. 1, snubber program. The licensee is requesting the following: an extension of the North Anna, Unit No. 1, fourth 10-year ISi interval for the snubber program to align it with the North Anna, Unit No. 2, fourth 10-year ISi interval for the snubber program; to align the North Anna, Unit Nos. 1 and 2, fifth 10-year inservice testing (1ST} intervals for snubber programs to the fifth 10-year 1ST intervals for pump and valve programs for both units; and to extend the NRG-approved relief request N1-14-CS-001, Revision 1 (ADAMS Accession No. ML091350058),
for the fourth 10-year ISi interval for snubbers originally scheduled (and approved) from May 1, 2009, through April 30, 2019, to December 14, 2020. The NRC staff approved an alternative for snubber visual inspection and functional testing in granting relief request N1-14-CS-001, Revision 1.
Applicable Code Edition/Addenda The applicable ASME BPV Code Section XI edition and addenda for the North Anna, Unit No. 1, fourth 10-year ISi interval for the snubber program is the 2004 Edition with no Addenda. For the North Anna, Unit No. 1, fifth 10-year ISi interval, the applicable Code is the ASME BPV Section XI 2013 Edition. For the North Anna, Unit No. 1, fifth 10-year 1ST interval, the applicable Code is the ASME OM Code, 2012 Edition.
The snubber inservice examination and testing requirements have been deleted from the 2006 Addenda and later Editions of Section XI of the ASME BPV Code. The regulations in 10 CFR 50.55a(b)(3)(v)(B) require licensees to use the ASME OM Code for snubber inservice examination and testing when using the 2006 Addenda and later Editions of Section XI of the
ASME BPV Code. Therefore, for the North Anna Unit No. 1 fifth 10-year 1ST interval for the snubber program, the licensee will be using the ASME OM Code.
Applicable Code Requirements ASME Section XI, IWA-2430(b), "Inspection Interval," requires the inspection to be determined by calendar years following placement of the plant into commercial service.
ASME Section XI, IWA-2432, "Inspection Program B," specifies that the first inspection interval is 10 years following the initial start of plant commercial service and that each successive inspection interval is 10 years following the previous inspection interval, except as modified by IWA-2430(d).
ASME Section XI, IWA-2430(d){1), states that each inspection interval may be extended by as much as one year. Adjustment shall not cause successive intervals to be altered by more than one year from the original pattern of intervals.
Reason for Request
The licensee states, in part:
The current North Anna Power Station (NAPS) Unit 1 and 2 ASME O&M Code, (2004 Ed.) Pump and Valve Programs 1ST intervals end on December 14, 2020.
The NAPS Unit 1 snubber inspection and testing program is currently contained in the NAPS Technical Requirements Manual (TRM) in lieu of ASME Code,Section XI, Article IWF, as approved in Relief Request N1-14-CS-001-R1
([ADAMS] Accession No. ML091350058), which ends on April 30, 2019. This request for alternative is needed to transition from ASME Code,Section XI and the NAPS TRM with Unit 1 and Unit 2 snubber programs having different ending dates to the NAPS 1ST program, scheduled to end on December 14, 2020.
Although [NAPS] Unit 1 was shutdown for approximately three months during the Fourth interval because of the seismic event earthquake in 2011, this timeframe is not enough to meet the eight months [beyond the 12 months allowed by IWA-2430(d)(1)] (4/2019 thru 12/2020) required to align with 10-year inspection interval update.
NAPS Units 1 and 2 will transition the snubber programs to the 1ST Programs in accordance with the ASME O&M Code of record (currently 2012 Ed.), which includes Subsection ISTD, "Preservice and lnservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants."
Transitioning the snubber programs for Units 1 and 2 at different times, NAPS 1 on May 1, 2019, and NAPS 2 on December 14, 2020, would require a significant amount of administrative activity (e. g., administrative procedure changes, reconciliation of ASME O&M Code differences, technical procedure changes, etc.), without enhancement of quality and safety. Additionally, the Snubber Programs would not be aligned with the rest of the 1ST Program. This request for alternative is to extend the existing TRM snubber program requirements through the NAPS 1 Fall 2019, refueling outage N 1R27, which will continue to accomplish the intended program requirements of ASME O&M Code, Subsection ISTD until full conversion of NAPS Units 1 and 2 to ASME O&M Code, Subsection ISTD requirements with the Fifth interval update of the NAPS 1ST Programs by
December 14, 2020. Performance of the TRM snubber program requirements during previous intervals has continued to verify the reliability and safety of the affected snubber components.
Licensee's Proposed Alternative The licensee proposed an alternative to the North Anna, Unit No. 1, fourth ISi interval for snubber examination and testing program duration requirements of IWA-2430(b) and (d) and IWA-2432.
The licensee proposes to extend the North Anna, Unit No. 1, fourth 10-year ISi interval for the snubber program by approximately 8 months beyond the Code-allowed one-year extension, from April 30, 2019, to December 14, 2020. This will allow the alignment of both North Anna units to share a common inspection and testing interval and to implement the same ASME OM Code Edition 2012 for the snubber programs during the subsequent fifth 10-year interval.
Additionally, with both units applying the ASME OM Code Edition 2012, the fifth 10-year intervals for the snubber programs will align with the fifth 10-year 1ST programs for pumps and valves for both North Anna units.
The licensee also requested to extend the NRG-approved alternative in relief request N1-14-CS-001-R1 for snubber examination and testing for the North Anna Unit No. 1 fourth 10-year ISi interval (scheduled to end on April 30, 2019), to December 14, 2020.
3.2 NRC Staff Evaluation The 2004 Edition of the ASME BPV Code Section XI, IWA-2430(d)(1 ), states that each ISi interval may be extended as much as one year and interval adjustments shall not cause successive intervals to be altered by more than one year from the original pattern of intervals.
The North Anna, Unit No. 1, fourth 10-year ISi interval for the snubber program ends on April 30, 2019, and the North Anna, Unit No. 2, fourth 10-year ISi interval for the snubber program ends on December 13, 2020. Currently, North Anna Unit Nos. 1 and 2 have different 10-year ISi interval dates for snubber inservice examination and testing programs. This may result in different governing Code editions in subsequent 10-year intervals, which may require the implementation of different Code requirements and administrative procedures between units.
The proposed alternative will synchronize the 10-year interval for snubber programs between Units 1 and 2. As required by 10 CFR 50.55a(b)(3)(v)(B), the common Code of Record will be the 2012 Edition of the ASME OM Code for the fifth 10-year 1ST interval for the snubber programs for both units. There is an advantage in implementing the same Code requirements at both units in the same interval. The advantage includes the reduction of administrative burden of maintaining different sets of procedures and requirements and results in a significant decrease in the chance of applying the wrong requirements. The NRC staff considers it a hardship for the licensee to perform these tasks at different dates within a few months.
Additionally, the North Anna, Unit Nos. 1 and 2, fifth 10-year 1ST intervals for pump and valve programs are also based on the ASME OM Code. Therefore, the licensee would like to align the snubber program with the rest of the 1ST program for pumps and valves for the fifth 10-year 1ST interval at North Anna, Unit Nos. 1 and 2, to reduce the associated administrative activities.
The NRC staff concludes that the proposed extension of the North Anna, Unit No. 1, fourth 10-year ISi interval for the snubber program by approximately eight months beyond the Code-allowed one-year extension, from April 30, 2019 to December 14, 2020, in order to align the North Anna, Unit No. 1 and Unit No. 2, fifth 10-year interval snubber programs with the North
Anna, Unit No. 1 and Unit No. 2, fifth 10-year 1ST interval for pump and valve programs, is acceptable.
The NRC staff previously authorized the use of an alternative for snubber examination and testing as described in relief request N1-14-CS-001-R1 for North Anna Unit No. 1 for the fourth ISi 10-year interval, which is scheduled to end on April 30, 2019. As proposed in the current request for alternative N1-14-CS-002, the licensee will continue performing the alternative examination and testing of snubbers as approved in relief request N1-14-CS-001-R1, through the extended interval ending on December 14, 2020. The NRC staff finds that this extension of the interval for the previously approved alternative is of short duration and that the existing program has continued to verify the reliability and safety of the snubber components.
Therefore, the NRC staff concludes that the alternative will continue to provide an acceptable level of quality and safety during the extended interval.
4.0 CONCLUSION
As set forth above, the NRC staff determined that the proposed alternative N 1-14-CS-002 for North Anna Unit No. 1 provides reasonable assurance that the affected snubber components can perform their safety function. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2) for alternative request N1-14-CS-002. Therefore, the NRC staff authorizes the use of the alternative request N1-14-CS-002 for North Anna Unit No. 1 for the fourth 10-year ISi program interval for snubbers, which began on May 1, 2009, and is now scheduled to end on December 14, 2020.
Additionally, previously NRG-authorized alternative request N1-14-CS-001-R1 for North Anna Unit No. 1 is authorized under 10 CFR 50.55a(z)( 1) for the extended fourth 10-year ISi interval for snubbers, from May 1, 2009, through December 14, 2020.
All other ASME OM Code requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable.
Principal Contributor: Gurjendra S. Bedi, NRR Date: May 21, 2019