| number = ML14070A140
| number = ML14070A140
| issue date = 03/08/2014
| issue date = 03/08/2014
| title = 2014/03/08 NRR E-mail Capture - Salem, Unit 1 - RAIs Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22)
| title = RAIs Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22)
| author name = Hughey J D
| author name = Hughey J D
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL

Revision as of 21:19, 7 February 2019

RAIs Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22)
ML14070A140
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/08/2014
From: Hughey J D
Division of Operating Reactor Licensing
To: Duke P R
Public Service Enterprise Group
References
Download: ML14070A140 (2)


Text

1 NRR-PMDAPEm Resource From: Hughey, John Sent: Saturday, March 08, 2014 4:21 PM To: Duke, Paul R. (Paul.Duke@pseg.com)

Subject:

Salem, Unit 1 - RAIs Re: Steam Generat or Tube Inspection Report - Twenty-Second Refueling Outage (1R22).Paul, By letter dated November 04, 2013 (Agencywide Docu ments Access System (ADAMS) Accession No. ML13310A885), PSEG Nuclear, L.L.C., submitted information summarizing the results of the 2013 steam generator (SG) inspections performed at Salem Nuclear Generating St ation, Unit 1 during the refueling outage 1R22.

The NRC staff has reviewed the information provided and determined that additional information is needed in order to complete our review as follows.

1. The description of the scope of array probe inspections indicates that you inspected 50 percent of the hot-leg population of internal tubesheet over expansions, which were greater than 0.25 inches. Please confirm the number and the units.
2. Please discuss the scope and results of any secondary side inspections, other than foreign object search and retrieval, performed during the outage (e.g., results of inspections in the steam drum and upper bundle).
3. Please discuss the scope and results of any tube plug inspections (e.g., was there any degradation and were all plugs in their proper locations). 4. Please discuss the scope and results of any inspections performed in the SG primary channel heads. The NRC staff requests a response to the above questions by April 25, 2014. Please advise if PSEG would like to have a teleconference with NRC staff to clarify any of the questions above.

Thank you, John John Hughey Salem / Hope Creek / TMI Project Manager

NRR - Division of Operating Reactor Licensing

Phone: 301-415-3204 e-mail: John.Hughey@nrc.gov

Hearing Identifier: NRR_PMDA Email Number: 1158 Mail Envelope Properties (3D388D66E29B124A910BAC867C3A359D021F28002A45)

Subject:

Salem, Unit 1 - RAIs Re: Steam Generator Tube Inspection Report - Twenty-Second Refueling Outage (1R22). Sent Date: 3/8/2014 4:20:35 PM Received Date: 3/8/2014 4:20:00 PM From: Hughey, John Created By: John.Hughey@nrc.gov Recipients: "Duke, Paul R. (Paul.Duke@pseg.com)" <Paul.Duke@pseg.com> Tracking Status: None

Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1669 3/8/2014 4:20:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: