| | issue date = 12/06/2017 | | | issue date = 12/06/2017 |
| | title = Grand Gulf, Unit 1 - Supplemental Letter to License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis | | | title = Supplemental Letter to License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis |
| | author name = Larson E A | | | author name = Larson E A |
| | author affiliation = Entergy Operations, Inc | | | author affiliation = Entergy Operations, Inc |
Revision as of 18:28, 27 January 2019
|
---|
Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] |
Text
/00077 December 6, 2017 U.S. Nuclear Regulatory Commission . ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Entergy Operations, Inc. P.O. Box 756 Port Gibson, MS 39150 Eric A. Larson Site Vice President Grand Gulf Nuclear Station Tel. (601) 437-7500
SUBJECT:
Supplemental Letter to License Amendment Request to Incorporate Tornado Missile Risk Evaluator into Licensing Basis Grand Gulf Nuclear Station, Unit 1
- Docket No. 50-416 License No. NPF-29
REFERENCE:
Grand Gulf Nuclear Station Letter GNR0-2017/0006.1, "License Amendment Request to Incorporate Tornado Missile Risk Evaluator into Licensing Basis". Ladies and Gentlemen:
The referenced letter submitted a license amendment request to incorporate the Tornado Missile Risk Evaluator methodology into the Grand Gulf licensing basis. This letter provides a supplemental change to the previously provided Updated Final Safety Analysis Report Markup, Table 3.5-8, page 5 of 6. Please replace the previously submitted page with the one provide in the attachment.
This letter contains no Regulatory Commitments.
Should you have any questions concerning the content of this letter, please contact Douglas Neve, Manager Regulatory Assurance at 601-437-2103.
Sincerely, CGL-Eric A. Larson Site Vice President EAL/amh Attachments:
- 1. Updated Final Safety Analysis Report Page Markup.
GNR0-2017/00077 Page 2 of 2 cc: with Attachment Mr. Siva Lingam U.S. Nuclear Regulatory Commission Mail Stop OWFN 8 81 Rockville, MD 20852-2738 cc: without Attachments and Enclosure Mr. Kriss Kennedy U.S. Nuclear Regulatory Comm_ission Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 Dr. Mary Currier, M.D., M.P.H State Health Officer Mississippi Department of Health P.O. Box 1700 Jackson, MS 39215-1700 Email: mary.currier@msdh.ms.gov GNR0-2017/00077
\ Grand Gulf Nuclear Station, Unit No. 1 Docket No. 50-416 I License No. NPF-29 License Amendment Request to Incorporate Tornado Missile Risk Evaluator into Licensing Basis Attachment 1 Updated Final Safety Analysis Report Page Markup .J
- f. Elevator machine room exhaust air check damper with centerline El. 212'-4" 6. Diesel-generator Building a. Air exhaust louver with centerline at El. 163' -9" b. Air exhaust louvers with centerline at El. 162'-0" c. Air intake louvers with centerline at El. 159'-8" d. Diesel generator exhaust pipes above roof El. 172' -0" _e. Diesel generator fuel oil tank vent-top El. 173'-6" 7. Auxiliary Building a. RHR room blowout shafts above El. 185'-0" b. RHR pump room & RCIC room blowout shafts above El. 185' -0" c. Steam tunnel blowout shaft above El. 185' -0" d. Louver and door at El. 185'-0" e. Door at roof El. 185' -0" f. Main entrance door at El. 139' -0" g. Exit door at El. 139'-0" GGNS-UFSAR Figure 3.8-117) Exposed\ but shielded by the partially complete,d Unit 2 Containment shell located approximately 90 feet to the north (see_ Figure 3.8-117) Protected by adjacent Auxiliary Bldg. wall & generator bldg. with roof El. 172'-0" (see Figure 9.5-21) Protected by adjacent Auxiliary Bldg. wall & generator bldg. with roof El. 172'-0" (see Figure 9.5-21) Protected by a 2'-0" thick reinforced concrete barrier wall (see Figure 9.5-21) See subsection 9.5.8.3 Exposed but shielded from horizontal missiles by concrete parapet with top elevation of 17 4' -0" Protected by a 2' -0" thick reinforced concrete barrier structure (see Figure 3.8-81) Protected by a 2'-0" thick reinforced concrete barrier structure (see Figure 3.8-81) Protected by a 2'-0" thick reinforced concrete barrier structure (see Figure 3.8-81) Protected by a 2'-0" thick reinforced concrete barrier wall (see Figure 3.8-81) Protected by a 2'-0" thick reinforced concrete barrier wall (see Figure 3.8-81) Protected by a 2'-0" thick reinforced concrete barrier wall & 2'-0" thick top slab (see Figure 3.8-79) Protected by a 2'-0" thick reinforced concrete barrier wall & 2'-0" thick top slab (see Figure 3.8-79) 5