ML16127A502: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:TMI-1 UFSAR APPENDIX 6B 6B-i REV. 20, APRIL 2010 | ||
APPENDIX 6B | |||
TMI-1 UFSAR APPENDIX 6B 6B-ii REV. 20, APRIL 2010 TABLE OF CONTENTS | |||
SECTION TITLE 1.1 HYDRAULIC MODEL | |||
===1.2 REACTOR=== | |||
BUILDING DESIGN BASIS ACCIDENT | |||
===2.0 ENVIRONMENTAL=== | |||
QUALIFICATION PROGRAM | |||
==2.1 INTRODUCTION== | |||
2.2 EQ ORGANIZATION 2.3 EQ MASTER LIST | |||
===2.4 ENVIRONMENTAL=== | |||
PARAMETERS | |||
===2.5 QUALIFICATION=== | |||
OF EQUIPMENT | |||
==3.0 REFERENCES== | |||
TMI-1 UFSAR APPENDIX 6B 6B-iii REV. 20, APRIL 2010 LIST OF TABLES | |||
TABLE TITLE 6B-1 Heat Transfer Coefficients Applied to the Reactor Coolant System and to the Reactor Building for LOCA analysis | |||
6B-2 Engineered Safeguards Data | |||
6B-3 Summary of Reactor Building LOCA Pressure Analysis 6B-4 Deleted | |||
6B-5 Isotopic Core Inventory | |||
6B-6 Assumptions Used In Development of LOCA Temperature Profile | |||
6B-7 Assumptions Used in Development of RB MSLB Temperature Profile | |||
TMI-1 UFSAR APPENDIX 6B 6B-iv REV. 20, APRIL 2010 LIST OF FIGURES | |||
FIGURE TITLE 6B-1 Loft Semiscale Blowdown Test No. 546 Vessel Pressure Vs Time (LOCA) 6B-2 Loft Test No. 546 Predicted Percent Mass Remaining Vs Time (LOCA) | |||
6B-3 Envelope of Peak Reactor Building Pressure Versus Rupture Sizes With 3 Air Coolers Operating (LOCA) 6B-4 Reactor Building Pressure Versus Time for the DBA (LOCA | |||
) 8.5 FT 2 Rupture with 3 Reactor Building Air Coolers | |||
6B-5 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) With 3 Reactor Building Air Coolers | |||
6B-6 Reactor Building Energy Inventory Versus Time for the DBA (LOCA) with 3 Reactor Building Air Coolers 6B-7 Reactor Building Pressure Versus Time After Rupture (14.1 FT 2 LOCA) 6B-8 Reactor Building Pressure Versus Time After Rupture (5.0 FT 2 LOCA) 6B-9 Reactor Building Pressure Versus Time After Rupture (3.0 FT 2 LOCA) 6B-10 Reactor Building Pressure Versus Time After Rupture (1.0 FT 2 LOCA) 6B-11 Reactor Building Pressure Versus Time for the DBA (LOCA) With 2 Air Coolers and 1,500 GPM Spray | |||
6B-12 Maximum Hot Spot Clad Temperature Vs Variable Heat Transfer Coefficient After DNB for a 36 inch ID, Double-Ended, Hot Leg Pipe Rupture (LOCA) | |||
6B-13 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) with Two Reactor Building Air Coolers & 1500 GPM Sprays 6B-13A Deleted | |||
6B-13B Deleted | |||
6B-13C Deleted | |||
6B-14 Deleted 6B-15 RB MSLB EQ Temperature Profile TMI-1 UFSAR APPENDIX 6B 6B-v REV. 20, APRIL 2010 LIST OF FIGURES (cont'd) | |||
FIGURE TITLE 6B-16 LOCA EQ Temperature Profile 6B-17 LOCA RB Pressure From EQ Model | |||
6B-18 RB MSLB EQ Pressure Profile | |||
6B-19 RB EQ Temperature Profile | |||
6B-20 RB EQ Pressure Profile | |||
TMI-1 UFSAR APPENDIX 6B 6B-i REV. 20, APRIL 2010 | |||
APPENDIX 6B | |||
TMI-1 UFSAR APPENDIX 6B 6B-ii REV. 20, APRIL 2010 TABLE OF CONTENTS | |||
SECTION TITLE 1.1 HYDRAULIC MODEL | |||
===1.2 REACTOR=== | |||
BUILDING DESIGN BASIS ACCIDENT | |||
===2.0 ENVIRONMENTAL=== | |||
QUALIFICATION PROGRAM | |||
==2.1 INTRODUCTION== | |||
2.2 EQ ORGANIZATION 2.3 EQ MASTER LIST | |||
===2.4 ENVIRONMENTAL=== | |||
PARAMETERS | |||
===2.5 QUALIFICATION=== | |||
OF EQUIPMENT | |||
==3.0 REFERENCES== | |||
TMI-1 UFSAR APPENDIX 6B 6B-iii REV. 20, APRIL 2010 LIST OF TABLES | |||
TABLE TITLE 6B-1 Heat Transfer Coefficients Applied to the Reactor Coolant System and to the Reactor Building for LOCA analysis | |||
6B-2 Engineered Safeguards Data | |||
6B-3 Summary of Reactor Building LOCA Pressure Analysis 6B-4 Deleted | |||
6B-5 Isotopic Core Inventory | |||
6B-6 Assumptions Used In Development of LOCA Temperature Profile | |||
6B-7 Assumptions Used in Development of RB MSLB Temperature Profile | |||
TMI-1 UFSAR APPENDIX 6B 6B-iv REV. 20, APRIL 2010 LIST OF FIGURES | |||
FIGURE TITLE 6B-1 Loft Semiscale Blowdown Test No. 546 Vessel Pressure Vs Time (LOCA) 6B-2 Loft Test No. 546 Predicted Percent Mass Remaining Vs Time (LOCA) | |||
6B-3 Envelope of Peak Reactor Building Pressure Versus Rupture Sizes With 3 Air Coolers Operating (LOCA) 6B-4 Reactor Building Pressure Versus Time for the DBA (LOCA | |||
) 8.5 FT 2 Rupture with 3 Reactor Building Air Coolers | |||
6B-5 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) With 3 Reactor Building Air Coolers | |||
6B-6 Reactor Building Energy Inventory Versus Time for the DBA (LOCA) with 3 Reactor Building Air Coolers 6B-7 Reactor Building Pressure Versus Time After Rupture (14.1 FT 2 LOCA) 6B-8 Reactor Building Pressure Versus Time After Rupture (5.0 FT 2 LOCA) 6B-9 Reactor Building Pressure Versus Time After Rupture (3.0 FT 2 LOCA) 6B-10 Reactor Building Pressure Versus Time After Rupture (1.0 FT 2 LOCA) 6B-11 Reactor Building Pressure Versus Time for the DBA (LOCA) With 2 Air Coolers and 1,500 GPM Spray | |||
6B-12 Maximum Hot Spot Clad Temperature Vs Variable Heat Transfer Coefficient After DNB for a 36 inch ID, Double-Ended, Hot Leg Pipe Rupture (LOCA) | |||
6B-13 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) with Two Reactor Building Air Coolers & 1500 GPM Sprays 6B-13A Deleted | |||
6B-13B Deleted | |||
6B-13C Deleted | |||
6B-14 Deleted 6B-15 RB MSLB EQ Temperature Profile TMI-1 UFSAR APPENDIX 6B 6B-v REV. 20, APRIL 2010 LIST OF FIGURES (cont'd) | |||
FIGURE TITLE 6B-16 LOCA EQ Temperature Profile 6B-17 LOCA RB Pressure From EQ Model | |||
6B-18 RB MSLB EQ Pressure Profile | |||
6B-19 RB EQ Temperature Profile | |||
6B-20 RB EQ Pressure Profile}} |
Latest revision as of 14:50, 9 October 2018
ML16127A502 | |
Person / Time | |
---|---|
Site: | Three Mile Island ![]() |
Issue date: | 04/11/2016 |
From: | Exelon Generation Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16127A520 | List:
|
References | |
TMI-16-035 | |
Download: ML16127A502 (38) | |
Text
TMI-1 UFSAR APPENDIX 6B 6B-i REV. 20, APRIL 2010
APPENDIX 6B
TMI-1 UFSAR APPENDIX 6B 6B-ii REV. 20, APRIL 2010 TABLE OF CONTENTS
SECTION TITLE 1.1 HYDRAULIC MODEL
1.2 REACTOR
BUILDING DESIGN BASIS ACCIDENT
2.0 ENVIRONMENTAL
QUALIFICATION PROGRAM
2.1 INTRODUCTION
2.2 EQ ORGANIZATION 2.3 EQ MASTER LIST
2.4 ENVIRONMENTAL
PARAMETERS
2.5 QUALIFICATION
OF EQUIPMENT
3.0 REFERENCES
TMI-1 UFSAR APPENDIX 6B 6B-iii REV. 20, APRIL 2010 LIST OF TABLES
TABLE TITLE 6B-1 Heat Transfer Coefficients Applied to the Reactor Coolant System and to the Reactor Building for LOCA analysis
6B-2 Engineered Safeguards Data
6B-3 Summary of Reactor Building LOCA Pressure Analysis 6B-4 Deleted
6B-5 Isotopic Core Inventory
6B-6 Assumptions Used In Development of LOCA Temperature Profile
6B-7 Assumptions Used in Development of RB MSLB Temperature Profile
TMI-1 UFSAR APPENDIX 6B 6B-iv REV. 20, APRIL 2010 LIST OF FIGURES
FIGURE TITLE 6B-1 Loft Semiscale Blowdown Test No. 546 Vessel Pressure Vs Time (LOCA) 6B-2 Loft Test No. 546 Predicted Percent Mass Remaining Vs Time (LOCA)
6B-3 Envelope of Peak Reactor Building Pressure Versus Rupture Sizes With 3 Air Coolers Operating (LOCA) 6B-4 Reactor Building Pressure Versus Time for the DBA (LOCA
) 8.5 FT 2 Rupture with 3 Reactor Building Air Coolers
6B-5 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) With 3 Reactor Building Air Coolers
6B-6 Reactor Building Energy Inventory Versus Time for the DBA (LOCA) with 3 Reactor Building Air Coolers 6B-7 Reactor Building Pressure Versus Time After Rupture (14.1 FT 2 LOCA) 6B-8 Reactor Building Pressure Versus Time After Rupture (5.0 FT 2 LOCA) 6B-9 Reactor Building Pressure Versus Time After Rupture (3.0 FT 2 LOCA) 6B-10 Reactor Building Pressure Versus Time After Rupture (1.0 FT 2 LOCA) 6B-11 Reactor Building Pressure Versus Time for the DBA (LOCA) With 2 Air Coolers and 1,500 GPM Spray
6B-12 Maximum Hot Spot Clad Temperature Vs Variable Heat Transfer Coefficient After DNB for a 36 inch ID, Double-Ended, Hot Leg Pipe Rupture (LOCA)
6B-13 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) with Two Reactor Building Air Coolers & 1500 GPM Sprays 6B-13A Deleted
6B-13B Deleted
6B-13C Deleted
6B-14 Deleted 6B-15 RB MSLB EQ Temperature Profile TMI-1 UFSAR APPENDIX 6B 6B-v REV. 20, APRIL 2010 LIST OF FIGURES (cont'd)
FIGURE TITLE 6B-16 LOCA EQ Temperature Profile 6B-17 LOCA RB Pressure From EQ Model
6B-18 RB MSLB EQ Pressure Profile
6B-19 RB EQ Temperature Profile
TMI-1 UFSAR APPENDIX 6B 6B-i REV. 20, APRIL 2010
APPENDIX 6B
TMI-1 UFSAR APPENDIX 6B 6B-ii REV. 20, APRIL 2010 TABLE OF CONTENTS
SECTION TITLE 1.1 HYDRAULIC MODEL
1.2 REACTOR
BUILDING DESIGN BASIS ACCIDENT
2.0 ENVIRONMENTAL
QUALIFICATION PROGRAM
2.1 INTRODUCTION
2.2 EQ ORGANIZATION 2.3 EQ MASTER LIST
2.4 ENVIRONMENTAL
PARAMETERS
2.5 QUALIFICATION
OF EQUIPMENT
3.0 REFERENCES
TMI-1 UFSAR APPENDIX 6B 6B-iii REV. 20, APRIL 2010 LIST OF TABLES
TABLE TITLE 6B-1 Heat Transfer Coefficients Applied to the Reactor Coolant System and to the Reactor Building for LOCA analysis
6B-2 Engineered Safeguards Data
6B-3 Summary of Reactor Building LOCA Pressure Analysis 6B-4 Deleted
6B-5 Isotopic Core Inventory
6B-6 Assumptions Used In Development of LOCA Temperature Profile
6B-7 Assumptions Used in Development of RB MSLB Temperature Profile
TMI-1 UFSAR APPENDIX 6B 6B-iv REV. 20, APRIL 2010 LIST OF FIGURES
FIGURE TITLE 6B-1 Loft Semiscale Blowdown Test No. 546 Vessel Pressure Vs Time (LOCA) 6B-2 Loft Test No. 546 Predicted Percent Mass Remaining Vs Time (LOCA)
6B-3 Envelope of Peak Reactor Building Pressure Versus Rupture Sizes With 3 Air Coolers Operating (LOCA) 6B-4 Reactor Building Pressure Versus Time for the DBA (LOCA
) 8.5 FT 2 Rupture with 3 Reactor Building Air Coolers
6B-5 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) With 3 Reactor Building Air Coolers
6B-6 Reactor Building Energy Inventory Versus Time for the DBA (LOCA) with 3 Reactor Building Air Coolers 6B-7 Reactor Building Pressure Versus Time After Rupture (14.1 FT 2 LOCA) 6B-8 Reactor Building Pressure Versus Time After Rupture (5.0 FT 2 LOCA) 6B-9 Reactor Building Pressure Versus Time After Rupture (3.0 FT 2 LOCA) 6B-10 Reactor Building Pressure Versus Time After Rupture (1.0 FT 2 LOCA) 6B-11 Reactor Building Pressure Versus Time for the DBA (LOCA) With 2 Air Coolers and 1,500 GPM Spray
6B-12 Maximum Hot Spot Clad Temperature Vs Variable Heat Transfer Coefficient After DNB for a 36 inch ID, Double-Ended, Hot Leg Pipe Rupture (LOCA)
6B-13 Reactor Building Vapor and Sump Coolant Temperatures Versus Time for the DBA (LOCA) with Two Reactor Building Air Coolers & 1500 GPM Sprays 6B-13A Deleted
6B-13B Deleted
6B-13C Deleted
6B-14 Deleted 6B-15 RB MSLB EQ Temperature Profile TMI-1 UFSAR APPENDIX 6B 6B-v REV. 20, APRIL 2010 LIST OF FIGURES (cont'd)
FIGURE TITLE 6B-16 LOCA EQ Temperature Profile 6B-17 LOCA RB Pressure From EQ Model
6B-18 RB MSLB EQ Pressure Profile