Line 14: |
Line 14: |
| | page count = 11 | | | page count = 11 |
| }} | | }} |
| {{#Wiki_filter:"JUNITED STATESNUCLEAR REGULATORY COMMISSIONOFYFICE OF NUCLEAR REACTOR REGULATION-WASHINGTON, DC 20555-0001June 12, 1996NRC INFORMATION NOTICE 96-36: DEGRADATION OF COOLING WATER SYSTEMS DUE TOICING | | {{#Wiki_filter:"J UNITED STATES NUCLEAR REGULATORY |
| | |
| | COMMISSION |
| | |
| | ===OFYFICE OF NUCLEAR REACTOR REGULATION=== |
| | -WASHINGTON, DC 20555-0001 June 12, 1996 NRC INFORMATION |
| | |
| | NOTICE 96-36: DEGRADATION |
| | |
| | OF COOLING WATER SYSTEMS DUE TO ICING |
|
| |
|
| ==Addressees== | | ==Addressees== |
| All holders of operating licenses or construction permits for nuclear powerreactors. | | All holders of operating |
| | |
| | licenses or construction |
| | |
| | permits for nuclear power reactors. |
|
| |
|
| ==Purpose== | | ==Purpose== |
| The U.S. Nuclear Regulatory Commission (NRC) is issuing this informationnotice to alert addressees to potential degradation of facility water intakesystems (circulating, service, and fire water) due to icing conditions.It is expected that recipients will review the information for applicabilityto their facilities and consider actions, as appropriate, to avoid similarproblems. However, suggestions contained in this information notice are notNRC requirements; therefore, no specific action or written response isrequired. | | The U.S. Nuclear Regulatory |
| | |
| | Commission (NRC) is issuing this information |
| | |
| | notice to alert addressees |
| | |
| | to potential |
| | |
| | degradation |
| | |
| | of facility water intake systems (circulating, service, and fire water) due to icing conditions. |
| | |
| | It is expected that recipients |
| | |
| | will review the information |
| | |
| | for applicability |
| | |
| | to their facilities |
| | |
| | and consider actions, as appropriate, to avoid similar problems. |
| | |
| | However, suggestions |
| | |
| | contained |
| | |
| | in this information |
| | |
| | notice are not NRC requirements; |
| | therefore, no specific action or written response is required.Description |
| | |
| | of Circumstances |
| | |
| | Wolf Creek Between 1:45 a.m. and 2:45 a.m. (all times central standard time) on January 30, 1996, operators |
| | |
| | at Wolf Creek received alarms indicating |
| | |
| | that the circulating |
| | |
| | water system traveling |
| | |
| | screens were becoming blocked. A visual inspection |
| | |
| | showed that the traveling |
| | |
| | screens for bays 1 and 3 were frozen and that water levels in these bays were approximately |
| | |
| | 2.5 m [8 ft] below normal.The emergency |
| | |
| | service water system was started with the intent to separate this system from the service water system. However, the emergency |
| | |
| | service water system was incorrectly |
| | |
| | aligned; flow was directed to the service water system and warming flow to the emergency |
| | |
| | service water system suction bays was restricted. |
| | |
| | Operators |
| | |
| | also shifted to circulating |
| | |
| | water pump B. At approxi-mately 3:30 a.m., operators |
| | |
| | received a service water pressure alarm and an electric fire pump started on low service water pressure. |
| | |
| | The shift super-visor then directed a manual reactor/turbine |
| | |
| | trip. Circulating |
| | |
| | water system bays were subsequently |
| | |
| | determined |
| | |
| | to be at 3.5 m [12 feet] below normal. The level loss was caused by water from the spray wash system freezing and block-ing the traveling |
| | |
| | screens.The Train A emergency |
| | |
| | service water system pump was tripped and declared inoperable |
| | |
| | at 7:47 a.m. because of low discharge |
| | |
| | pressure and high strainer differential |
| | |
| | pressure. |
| | |
| | At about 8:00 a.m., the supervising |
| | |
| | operator coming on shift noted the incorrect |
| | |
| | alignment |
| | |
| | of the emergency |
| | |
| | service water system and took action to correct it. At about 5:45 p.m., the operators |
| | |
| | declared Train A'~P) C-FW 0f bla .pDR :t:-E moric6 6'sVOU 160612 ' |
| | 1.'K)IN 96-36 June 12, 1996 operable on the basis of an engineering |
| | |
| | evaluation |
| | |
| | and placed it in service.However, the pump was again stopped 1-1/2 hours later at approximately |
| | |
| | 7:30 p.m. when the pump exhibited |
| | |
| | further oscillations |
| | |
| | in flow and pressure.At approximately |
| | |
| | 8:00 p.m., operators |
| | |
| | noted that emergency |
| | |
| | service water system Train B suction bay level was 4.5 m [15 ft] below normal and decreasing |
| | |
| | slowly. Operators |
| | |
| | placed additional |
| | |
| | heat loads on Train B and the suction bay levels subsequently |
| | |
| | recovered. |
| | |
| | At 10:14 p.m., the operators |
| | |
| | again started Train A emergency |
| | |
| | service water system and secured it at 10:27 p.m. due to decreasing |
| | |
| | flow and pressure.At about 10:00 a.m. on January 31, divers inspected |
| | |
| | the suction bay of Train A and noted complete blockage of the trash racks by frazil ice. Train B was not inspected |
| | |
| | because the pump was running. The ice blockage was cleared by 4:00 p.m. by sparging the trash racks with air. The emergency |
| | |
| | service water system was designed to have warming flow injected in front of trash racks to increase bulk water temperature |
| | |
| | and prevent the formation |
| | |
| | of frazil ice. Due to calculational |
| | |
| | errors by the architect-engineer |
| | |
| | and the as-built system configuration, the emergency |
| | |
| | service water system warming flow was insufficient |
| | |
| | to prevent frazil ice from forming at the Train A trash racks.FitzPatrick |
| | |
| | On February 25, 1993, at 1:25 a.m., the electric fire pump started on low fire header pressure. |
| | |
| | After verifying |
| | |
| | normal fire header pressure, operators secured the electric fire pump, and the diesel fire pumps subsequently |
| | |
| | started on low header pressure. |
| | |
| | It was later determined |
| | |
| | that the fire jockey pump had lost suction because of the decreasing |
| | |
| | screenwell |
| | |
| | level.Over the next several minutes, operators |
| | |
| | noted an increase in circulating |
| | |
| | water system motor amperage (which is consistent |
| | |
| | with decreased |
| | |
| | suction pressure). |
| | |
| | Reactor power was also reduced and one circulating |
| | |
| | water pump was secured. At 1:40 a.m., an operator reported that the screenwell |
| | |
| | level was approximately |
| | |
| | 3 m [10 ft] below normal and the reactor was manually scrammed.After a second circulating |
| | |
| | water pump was subsequently |
| | |
| | secured, the screenwell |
| | |
| | water level quickly recovered. |
| | |
| | The licensee concluded |
| | |
| | that the reduced screenwell |
| | |
| | level had been caused by ice partially |
| | |
| | blocking the lake intake structure. |
| | |
| | Either frazil ice formed around or in front of the heated intake bar racks, or slush ice was present in front of the bar racks.Fermi On February 5, 1996, at approximately |
| | |
| | 2:30 p.m., diesel generator |
| | |
| | service water pump C failed to develop normal discharge |
| | |
| | pressure, flow, and motor current during a surveillance. |
| | |
| | This made Division I emergency |
| | |
| | diesel generator (EDG) 12 inoperable. |
| | |
| | After several unsuccessful |
| | |
| | attempts to start the pump, an air purge of the pump column on the discharge |
| | |
| | of the pump was initiated |
| | |
| | in an attempt to clear any obstruction |
| | |
| | in the column or the pump inlet. The licensee detected blockage when it tried to blow air through the pipe. At 8:21 p.m., the pump was started and after 3 to 5 seconds an erratic discharge |
| | |
| | pressure was noted. In a short time, pump flow, discharge |
| | |
| | pressure, and motor amps were normal. The following |
| | |
| | day, on February 6, diesel generator |
| | |
| | service water pump B was started. The pump, which cools Division II |
| | |
| | K> < IN 96-36 June 12, 1996 EDG 13, showed no flow, no pressure, and low amperage for the first 30 seconds. After approximately |
| | |
| | 90 seconds, normal flow discharge |
| | |
| | pressure and motor current were achieved. |
| | |
| | The remaining |
| | |
| | safety-related |
| | |
| | pumps were tested satisfactorily. |
| | |
| | The diesel generator |
| | |
| | service water pumps are all deep-draft |
| | |
| | pumps and take suction from the ultimate heat sink reservoir |
| | |
| | which is a segregated |
| | |
| | pool. The licensee evaluation |
| | |
| | concluded |
| | |
| | that although the reservoir |
| | |
| | temperatures |
| | |
| | are maintained |
| | |
| | above 5 eC [41 OF], part of the pump column and two of the linear guide bearings are located above the water level and are exposed to ambient air temperature |
| | |
| | conditions. |
| | |
| | The failure of the diesel generator |
| | |
| | service water pump C was attributed |
| | |
| | to ice buildup around the shaft and spider bearing from leakage past the discharge |
| | |
| | check valve and the cold weather. The licensee also concluded |
| | |
| | that under some credible meteorological |
| | |
| | conditions, the functions |
| | |
| | of both divisions |
| | |
| | could have been affected.Discussion |
| | |
| | Frazil icing is a phenomenon |
| | |
| | that affects the operation |
| | |
| | of intake structures |
| | |
| | in regions that experience |
| | |
| | cold weather. The accumulation |
| | |
| | of frazil ice on intake trash racks can completely |
| | |
| | block the flow of water into the intake.The process starts when the water flowing into the intake is supercooled (a condition |
| | |
| | where the water is below the freezing point). The supercooling |
| | |
| | may be very small, on the order of a few hundredths |
| | |
| | of a degree.The supercooling |
| | |
| | occurs with a loss of heat from a large surface area such as a lake with open water and clear nights. High winds contribute |
| | |
| | to the problem by providing |
| | |
| | mixing of the supercooled |
| | |
| | water to depths as great as 6 to 9 m[20 to 30 ft]. The frazil ice, which is composed of very small crystals (1-15 mm) with little buoyancy because of their size, is carried along in the water and mixed all through the supercooled |
| | |
| | water.The suction of the supercooled |
| | |
| | water and the suspended |
| | |
| | frazil ice crystals through an intake structure |
| | |
| | brings the frazil ice crystals in contact with the trash rack bars. Frazil ice crystals easily adhere to any object with which they collide. The ice collects first on the upstream side of the trash racks, then steadily grows until the space between the trash racks is bridged. This bridging rapidly blocks the trash racks. The accumulation |
| | |
| | of ice can with-stand high differential |
| | |
| | pressures; |
| | effectively |
| | |
| | damming the intake suction.Facility vulnerability |
| | |
| | to icing events is a function of plant design. Frazil and other ice formation |
| | |
| | is dependent |
| | |
| | on specific environmental |
| | |
| | conditions |
| | |
| | and represents |
| | |
| | a potential |
| | |
| | common-mode |
| | |
| | failure that can cause the loss or degrada-tion of multiple cooling water systems, including |
| | |
| | the potential |
| | |
| | loss of the ultimate heat sink. |
| | |
| | IN 96-36 June 12, 1996 Related Information |
| | |
| | NUREG/CR-0548, "Ice Blockage of Water Intakes." This information |
| | |
| | notice requires no specific action or written response. |
| | |
| | If you have any questions |
| | |
| | about the information |
| | |
| | in this notice, please contact one of the technical |
| | |
| | contacts listed below or the appropriate |
| | |
| | Office of Nuclear Reactor Regulation |
| | |
| | project manager.I i -..--.....-.Brian K. Grimes, Acting Director Division of Reactor Program Management |
| | |
| | ===Office of Nuclear Reactor Regulation=== |
| | Technical |
| | |
| | Contacts: John R. Tappert, NRR (301) 415-1167 Internet:jrtlnrc.gov |
| | |
| | Bruce Jorgensen, RIII (708) 829-9615 Internet:blj@nrc.gov |
| | |
| | Attachment: |
| | List of Recently Issued NRC Information |
| | |
| | Notices I k W (0%0%J4-c- -d I |
| | |
| | K>Attachment |
| | |
| | IN 96-36 June 12, 1996 LIST OF RECENTLY ISSUED NRC INFORMATION |
| | |
| | NOTICES Information |
| | |
| | Date of Notice No. Subject Issuance Issued to 96-35 Failure of Safety Systems on Self-Shielded |
| | |
| | Irradia-tors Because of Inadequate |
| | |
| | Maintenance |
| | |
| | and Training Hydrogen Gas Ignition during Closure Welding of a VSC-24 Multi-Assembly |
| | |
| | Sealed Basket 06/11/96 05/31/96 All U.S. Nuclear Regulatory |
| | |
| | Commission |
| | |
| | irradiator |
| | |
| | licensees |
| | |
| | and vendors All holders of OLs or CPs for nuclear power reactors 96-34 96-33 Erroneous Defective Results ii Data From Thermocouple |
| | |
| | i a Fire 05/24/96 All material and fuel cycle licensees |
| | |
| | that monitor tem-perature with thermocouples |
| | |
| | 96-32 96-31 96-30 Implementation |
| | |
| | of 10 CFR 50.55a(g)(6)(ii)(A),"Augmented |
| | |
| | Examination |
| | |
| | of Reactor Vessel" Cross-Tied |
| | |
| | Safety Injec-tion Accumulators |
| | |
| | Inaccuracy |
| | |
| | of Diagnostic |
| | |
| | Equipment |
| | |
| | for Motor-Operated Butterfly |
| | |
| | Valves Requirements |
| | |
| | in 10 CFR Part 21 for Reporting |
| | |
| | and Evaluating |
| | |
| | Software Errors Suggested |
| | |
| | Guidance Relating to Development |
| | |
| | and Imple-mentation |
| | |
| | of Corrective |
| | |
| | Action Potential |
| | |
| | Clogging of High Pressure Safety Injection Throttle Valves During Recirculation |
| | |
| | 06/05/96 05/22/96 05/21/96 05/20/96 05/01/96 05/01/96 All holders of OLs or CPs for nuclear power reactors All holders of OLs or CPs for pressurized |
| | |
| | water reactors All holders of OLs or CPs for nuclear power reactors All holders of OLs or CPs for nuclear power reactors All material and fuel cycle licensees All holders of OLs or CPs for pressurized |
| | |
| | water reactors 96-29 96-28 96-27 OL -Operating |
| | |
| | License CP = Construction |
| | |
| | Permit |
| | |
| | .I IN 96-36 June 12, 1996 Related Information |
| | |
| | NUREG/CR-0548, "Ice Blockage of Water Intakes." This information |
| | |
| | notice requires no specific action or written response. |
| | |
| | If you have any questions |
| | |
| | about the information |
| | |
| | in this notice, please contact one of the technical |
|
| |
|
| ==Description of Circumstances==
| | contacts listed below or the appropriate |
| Wolf CreekBetween 1:45 a.m. and 2:45 a.m. (all times central standard time) onJanuary 30, 1996, operators at Wolf Creek received alarms indicating that thecirculating water system traveling screens were becoming blocked. A visualinspection showed that the traveling screens for bays 1 and 3 were frozen andthat water levels in these bays were approximately 2.5 m [8 ft] below normal.The emergency service water system was started with the intent to separatethis system from the service water system. However, the emergency servicewater system was incorrectly aligned; flow was directed to the service watersystem and warming flow to the emergency service water system suction bays wasrestricted. Operators also shifted to circulating water pump B. At approxi-mately 3:30 a.m., operators received a service water pressure alarm and anelectric fire pump started on low service water pressure. The shift super-visor then directed a manual reactor/turbine trip. Circulating water systembays were subsequently determined to be at 3.5 m [12 feet] below normal. Thelevel loss was caused by water from the spray wash system freezing and block-ing the traveling screens.The Train A emergency service water system pump was tripped and declaredinoperable at 7:47 a.m. because of low discharge pressure and high strainerdifferential pressure. At about 8:00 a.m., the supervising operator coming onshift noted the incorrect alignment of the emergency service water system andtook action to correct it. At about 5:45 p.m., the operators declared Train A'~P) C-FW 0f bla .pDR :t:-E moric6 6'sVOU 160612 '
| |
| 1.'K)IN 96-36June 12, 1996 operable on the basis of an engineering evaluation and placed it in service.However, the pump was again stopped 1-1/2 hours later at approximately7:30 p.m. when the pump exhibited further oscillations in flow and pressure.At approximately 8:00 p.m., operators noted that emergency service watersystem Train B suction bay level was 4.5 m [15 ft] below normal and decreasingslowly. Operators placed additional heat loads on Train B and the suction baylevels subsequently recovered. At 10:14 p.m., the operators again startedTrain A emergency service water system and secured it at 10:27 p.m. due todecreasing flow and pressure.At about 10:00 a.m. on January 31, divers inspected the suction bay of Train Aand noted complete blockage of the trash racks by frazil ice. Train B was notinspected because the pump was running. The ice blockage was cleared by4:00 p.m. by sparging the trash racks with air. The emergency service watersystem was designed to have warming flow injected in front of trash racks toincrease bulk water temperature and prevent the formation of frazil ice. Dueto calculational errors by the architect-engineer and the as-built systemconfiguration, the emergency service water system warming flow wasinsufficient to prevent frazil ice from forming at the Train A trash racks.FitzPatrickOn February 25, 1993, at 1:25 a.m., the electric fire pump started on low fireheader pressure. After verifying normal fire header pressure, operatorssecured the electric fire pump, and the diesel fire pumps subsequently startedon low header pressure. It was later determined that the fire jockey pump hadlost suction because of the decreasing screenwell level.Over the next several minutes, operators noted an increase in circulatingwater system motor amperage (which is consistent with decreased suctionpressure). Reactor power was also reduced and one circulating water pump wassecured. At 1:40 a.m., an operator reported that the screenwell level wasapproximately 3 m [10 ft] below normal and the reactor was manually scrammed.After a second circulating water pump was subsequently secured, the screenwellwater level quickly recovered. The licensee concluded that the reducedscreenwell level had been caused by ice partially blocking the lake intakestructure. Either frazil ice formed around or in front of the heated intakebar racks, or slush ice was present in front of the bar racks.FermiOn February 5, 1996, at approximately 2:30 p.m., diesel generator servicewater pump C failed to develop normal discharge pressure, flow, and motorcurrent during a surveillance. This made Division I emergency dieselgenerator (EDG) 12 inoperable. After several unsuccessful attempts to startthe pump, an air purge of the pump column on the discharge of the pump wasinitiated in an attempt to clear any obstruction in the column or the pumpinlet. The licensee detected blockage when it tried to blow air through thepipe. At 8:21 p.m., the pump was started and after 3 to 5 seconds an erraticdischarge pressure was noted. In a short time, pump flow, discharge pressure,and motor amps were normal. The following day, on February 6, dieselgenerator service water pump B was started. The pump, which cools Division II
| |
|
| |
|
| K> < IN 96-36June 12, 1996 EDG 13, showed no flow, no pressure, and low amperage for the first30 seconds. After approximately 90 seconds, normal flow discharge pressureand motor current were achieved. The remaining safety-related pumps weretested satisfactorily.The diesel generator service water pumps are all deep-draft pumps and takesuction from the ultimate heat sink reservoir which is a segregated pool. Thelicensee evaluation concluded that although the reservoir temperatures aremaintained above 5 eC [41 OF], part of the pump column and two of the linearguide bearings are located above the water level and are exposed to ambientair temperature conditions. The failure of the diesel generator service waterpump C was attributed to ice buildup around the shaft and spider bearing fromleakage past the discharge check valve and the cold weather. The licenseealso concluded that under some credible meteorological conditions, thefunctions of both divisions could have been affected.DiscussionFrazil icing is a phenomenon that affects the operation of intake structuresin regions that experience cold weather. The accumulation of frazil ice onintake trash racks can completely block the flow of water into the intake.The process starts when the water flowing into the intake is supercooled (acondition where the water is below the freezing point). The supercooling maybe very small, on the order of a few hundredths of a degree.The supercooling occurs with a loss of heat from a large surface area such asa lake with open water and clear nights. High winds contribute to the problemby providing mixing of the supercooled water to depths as great as 6 to 9 m[20 to 30 ft]. The frazil ice, which is composed of very small crystals(1-15 mm) with little buoyancy because of their size, is carried along in thewater and mixed all through the supercooled water.The suction of the supercooled water and the suspended frazil ice crystalsthrough an intake structure brings the frazil ice crystals in contact with thetrash rack bars. Frazil ice crystals easily adhere to any object with whichthey collide. The ice collects first on the upstream side of the trash racks,then steadily grows until the space between the trash racks is bridged. Thisbridging rapidly blocks the trash racks. The accumulation of ice can with-stand high differential pressures; effectively damming the intake suction.Facility vulnerability to icing events is a function of plant design. Fraziland other ice formation is dependent on specific environmental conditions andrepresents a potential common-mode failure that can cause the loss or degrada-tion of multiple cooling water systems, including the potential loss of theultimate heat sink.
| | Office of Nuclear Reactor Regulation |
|
| |
|
| IN 96-36June 12, 1996 Related InformationNUREG/CR-0548, "Ice Blockage of Water Intakes."This information notice requires no specific action or written response. Ifyou have any questions about the information in this notice, please contactone of the technical contacts listed below or the appropriate Office ofNuclear Reactor Regulation project manager.Ii -..--.....-.Brian K. Grimes, Acting DirectorDivision of Reactor Program ManagementOffice of Nuclear Reactor RegulationTechnical Contacts:John R. Tappert, NRR(301) 415-1167Internet:jrtlnrc.govBruce Jorgensen, RIII(708) 829-9615Internet:blj@nrc.govAttachment:List of Recently Issued NRC Information NoticesIk W (0%0%J4-c- -dI
| | project manager.Original signed by Brian K. Grimes Brian K. Grimes, Acting Director Division of Reactor Program Management |
|
| |
|
| K>AttachmentIN 96-36June 12, 1996 LIST OF RECENTLY ISSUEDNRC INFORMATION NOTICESInformation Date ofNotice No. Subject Issuance Issued to96-35Failure of Safety Systemson Self-Shielded Irradia-tors Because of InadequateMaintenance and TrainingHydrogen Gas Ignitionduring Closure Weldingof a VSC-24 Multi-AssemblySealed Basket06/11/9605/31/96All U.S. Nuclear RegulatoryCommission irradiatorlicensees and vendorsAll holders of OLs or CPsfor nuclear power reactors96-3496-33ErroneousDefectiveResults iiData FromThermocouplei a Fire05/24/96All material and fuel cyclelicensees that monitor tem-perature with thermocouples96-3296-3196-30Implementation of 10 CFR50.55a(g)(6)(ii)(A),"Augmented Examinationof Reactor Vessel"Cross-Tied Safety Injec-tion AccumulatorsInaccuracy of DiagnosticEquipment for Motor-Operated Butterfly ValvesRequirements in 10 CFRPart 21 for Reporting andEvaluating Software ErrorsSuggested Guidance Relatingto Development and Imple-mentation of CorrectiveActionPotential Clogging of HighPressure Safety InjectionThrottle Valves DuringRecirculation06/05/9605/22/9605/21/9605/20/9605/01/9605/01/96All holders of OLs or CPsfor nuclear power reactorsAll holders of OLs or CPsfor pressurized waterreactorsAll holders of OLs or CPsfor nuclear power reactorsAll holders of OLs or CPsfor nuclear power reactorsAll material and fuel cyclelicenseesAll holders of OLs or CPsfor pressurized waterreactors96-2996-2896-27OL -Operating LicenseCP = Construction Permit
| | ===Office of Nuclear Reactor Regulation=== |
| | Technical |
|
| |
|
| .IIN 96-36June 12, 1996 IN 96-XXJune XX, 1996 Related informationNUREG/CR-0548, *Ice Blockage of Water Intakes"This information notice requires no specific action or written response. Ifyou have any questions about the information in this notice, please contactone of the technical contacts listed below or the appropriate Office ofNuclear Reactor Regulation project manager.Brian K. Grimes, Acting DirectorDivision of Reactor Program ManagementOffice of Nuclear Reactor RegulationTechnical Contacts:John R. Tappert, NRR(301) 415-1167Internet:Jrt@nrc.govBruce Jorgensen, RIII(708) 829-9615Internet:bl Jnrc.govAttachment:List of Recently Issued NRC Information NoticesDOCUMENT NAME:G:\JRT\WOLFICE.INTech Editor reviewed 5/1/96To receive a copy of this document, indicate in the box: ACTattachment/enclosure 'El -Copy with attachment/enclosure* see orevious concurrences-Copy withoutON" -No copyOFFICE
| | Contacts: John R. Tappert, NRR (301) 415-1167 Internet:jrt@nrc.gov |
| | |
| | Bruce Jorgensen, RIII (708) 829-9615 Internet:blj@nrc.gov |
| | |
| | Attachment: |
| | List of Recently Issued NRC Information |
| | |
| | Notices DOCUMENT NAME: 96-36.IN Tech Editor reviewed 5/1/96 To receive a copy of attachment/enclosure |
| | |
| | * s this document, indicate in the box: "C""EN -Copy with attachment/enclosure |
| | |
| | ee Drevious concurrences |
| | |
| | -Copy without"N" -No co OFFICE |
|
| |
|
| ==CONTACT== | | ==CONTACT== |
| S C C/SRXB:DSSA I C/PECB:DRPM I D/DRPMNAME JTappert | | S IC C/SRXB:DSSA |
| | |
| | I C/PECB:DRPM |
| | |
| | D/JT(S, i NAME JTappert |
|
| |
|
| * LMarsh | | * LMarsh |
|
| |
|
| * AChaffeer,(, IBGrimesBJorgensen *DATE 5 /2/96 5/14/96 6 _ _ _6/ _/96UrIU-lAL KLLUKU WO/WY-,*-) | | * AChaffee* |
| -IN 96 dMay XX, 1995 IN 96-XXMay XX, 1995 This information notice requires no specific action or written response. Ifyou have any questions about the information in this notice, please contactone of the technical contacts listed below or the appropriate Office ofNuclear Reactor Regulation project manager.Brian K. Grimes, Acting DirectorDivision of Reactor Program ManagementOffice of Nuclear Reactor RegulationTechnical Contacts:John R. Tappert, NRR(301) 415-1167Internet:jrt~nrc.govBruce Jorgensen, RIII(708) 829-9615Internet:bl Jnrc.govAttachment:List of Recently Issued NRC Information NoticesDOCUMENT NAME:G:\JRT\WOLFICE.INTech Editor reviewed 5/1/96To receive a copy of this document, Indicate in the box: "C'attachment/enclosure HEN -Copy with attachment/enclosure* see nrevinus concurrences-Copy withoutON" -No copy--r-V. ---*OFFICE
| | BKf1Tntee' |
| | l BJorgensen |
| | |
| | * lDATE 5 /2/96 5/14/96 6/5/96 6//(/96 OFFICIAL RECORD COPY |
| | |
| | IN 96-XX June XX, 1996 Related information |
| | |
| | NUREG/CR-0548, *Ice Blockage of Water Intakes" This information |
| | |
| | notice requires no specific action or written response. |
| | |
| | If you have any questions |
| | |
| | about the information |
| | |
| | in this notice, please contact one of the technical |
| | |
| | contacts listed below or the appropriate |
| | |
| | Office of Nuclear Reactor Regulation |
| | |
| | project manager.Brian K. Grimes, Acting Director Division of Reactor Program Management |
| | |
| | ===Office of Nuclear Reactor Regulation=== |
| | Technical |
| | |
| | Contacts: John R. Tappert, NRR (301) 415-1167 Internet:Jrt@nrc.gov |
| | |
| | Bruce Jorgensen, RIII (708) 829-9615 Internet:bl |
| | |
| | Jnrc.gov Attachment: |
| | List of Recently Issued NRC Information |
| | |
| | Notices DOCUMENT NAME:G:\JRT\WOLFICE.IN |
| | |
| | Tech Editor reviewed 5/1/96 To receive a copy of this document, indicate in the box: ACT attachment/enclosure |
| | |
| | 'El -Copy with attachment/enclosure |
| | |
| | * see orevious concurrences |
| | |
| | -Copy without ON" -No copy OFFICE |
|
| |
|
| ==CONTACT== | | ==CONTACT== |
| S IC C/SRXB:DSSA [_ C/PECB:DRPM I D/DRPMNAME JTappert | | S C C/SRXB:DSSA |
| | |
| | I C/PECB:DRPM |
| | |
| | I D/DRPM NAME JTappert |
|
| |
|
| * LMarsh | | * LMarsh |
|
| |
|
| * AChaffee BGrimesBJorgensen *DATE 5 12/96 5/14/96 5 / /96 5 / /96.- -----------. bOFFICIAL KLLRCD COPY so§S | | * AChaffeer,(, IBGrimes BJorgensen |
| | |
| | *DATE 5 /2/96 5/14/96 6 _ _ _6/ _/96 UrIU-lAL KLLUKU WO/WY-,*-) |
| | -IN 96 d May XX, 1995 Related-Information |
| | |
| | NUREG/CR-0548, "Ice Blockage of Water Intakes" This information |
| | |
| | notice requires no specific action or written response. |
| | |
| | If you have any questions |
| | |
| | about the information |
| | |
| | in this notice, please contact one of the technical |
| | |
| | contacts listed below or the appropriate |
| | |
| | Office of Nuclear Reactor Regulation |
| | |
| | project manager.Brian K. Grimes, Acting Director Division of Reactor Program Management |
| | |
| | ===Office of Nuclear Reactor Regulation=== |
| | Technical |
| | |
| | Contacts: John R. Tappert, NRR (301) 415-1167 Internet:jrt@nrc.gov |
| | |
| | Bruce Jorgensen, RIII (708) 829-9615 Internet:blj@nrc.gov |
| | |
| | Attachment: |
| | List of Recently Issued NRC Information |
| | |
| | Notices DOCUMENT NAME:G:\JRT\WOLFICE.IN |
|
| |
|
| IN 96-XXMay XX, 1995 This information notice requires no specific action or writtenyou have any questions about the information In this notice, plone of the technical contacts listed below or the appropriate 0Nuclear Reactor Regulation project manager..actofTechnical Contacts:John R. Tappert,(301) 415-1167Internet :Jrt~nrcBrian K. Grimes Acting DirectorDivision of Resctor Program ManagementOffice of Nu ear Reactor RegulationNRR uce Jorgensen, RGN III(708) 829-9615:.gov Internet:blj@nrc.govNRC I iormation NoticesAttachment:List of Recently IssuedDOCUMENT NAME:G:\JRT\WO 4ICE.INTech Editor reviewed /1/96To receive a copy p this documiattachment/enclosyre "E -Coiseep nrpvinu!ent, indicate in the box: IC'py with attachment/enclosureI concurrences= Copy withoutON, -No copyOFFICE CONTSCTS IC C/SRXB:DSSA _ C/PECB:DRPM l/DRPMNAME JT pert
| | Tech Editor reviewed 5/1/96 To receive a copy of this document, indicate in the box: "C" attachment/enclosure "E" = Copy with attachment/enclosure |
| | |
| | * _ nrvin_ , concurrences |
| | |
| | = Copy without"N" = No copy OFFICE |
| | |
| | ==CONTACT== |
| | S IC C/SRXB:DSSAl |
| | |
| | C/PECB:DRPM |
| | |
| | l D/DRPM H NAME JTappert |
|
| |
|
| * LMarsh | | * LMarsh |
|
| |
|
| * AChaffee BGrimesAB4rgensen *DATE /2/96 5/14/96 5 / /96 5 / /967 ArTTA I £'LFIL rIILvrv -'WI I AULOISI.WWI 5 JP4\ | | * AChaffee BGrimes BJorgensen |
| IN 96-XXMay XX, 1995 | | |
| }} | | *DATE 5 /2/96 5/14/96 5 / /96 5 / /96 OFFICIAL RECORD COPY |
| | |
| | IN 96-XX May XX, 1995 This information |
| | |
| | notice requires no specific action or written response. |
| | |
| | If you have any questions |
| | |
| | about the information |
| | |
| | in this notice, please contact one of the technical |
| | |
| | contacts listed below or the appropriate |
| | |
| | Office of Nuclear Reactor Regulation |
| | |
| | project manager.Brian K. Grimes, Acting Director Division of Reactor Program Management |
| | |
| | ===Office of Nuclear Reactor Regulation=== |
| | Technical |
| | |
| | Contacts: John R. Tappert, NRR (301) 415-1167 Internet:jrt~nrc.gov |
| | |
| | Bruce Jorgensen, RIII (708) 829-9615 Internet:bl |
| | |
| | Jnrc.gov Attachment: |
| | List of Recently Issued NRC Information |
| | |
| | Notices DOCUMENT NAME:G:\JRT\WOLFICE.IN |
| | |
| | Tech Editor reviewed 5/1/96 To receive a copy of this document, Indicate in the box: "C'attachment/enclosure |
| | |
| | HEN -Copy with attachment/enclosure |
| | |
| | * see nrevinus concurrences |
| | |
| | -Copy without ON" -No copy--r-V. ---*OFFICE |
| | |
| | ==CONTACT== |
| | S IC C/SRXB:DSSA |
| | |
| | [_ C/PECB:DRPM |
| | |
| | I D/DRPM NAME JTappert |
| | |
| | * LMarsh |
| | |
| | * AChaffee BGrimes BJorgensen |
| | |
| | *DATE 5 12/96 5/14/96 5 / /96 5 / /96.- -----------. b OFFICIAL KLLRCD COPY so§S |
| | |
| | IN 96-XX May XX, 1995 This information |
| | |
| | notice requires no specific action or written you have any questions |
| | |
| | about the information |
| | |
| | In this notice, pl one of the technical |
| | |
| | contacts listed below or the appropriate |
| | |
| | 0 Nuclear Reactor Regulation |
| | |
| | project manager..act of Technical |
| | |
| | Contacts: John R. Tappert, (301) 415-1167 Internet :Jrt~nrc Brian K. Grimes Acting Director Division of Resctor Program Management |
| | |
| | ===Office of Nu ear Reactor Regulation=== |
| | NRR uce Jorgensen, RGN III (708) 829-9615:.gov Internet:blj@nrc.gov |
| | |
| | NRC I iormation |
| | |
| | Notices Attachment: |
| | List of Recently Issued DOCUMENT NAME:G:\JRT\WO |
| | |
| | 4ICE.IN Tech Editor reviewed /1/96 To receive a copy p this documi attachment/enclosyre "E -Coi seep nrpvinu!ent, indicate in the box: IC'py with attachment/enclosure |
| | |
| | ===I concurrences=== |
| | = Copy without ON, -No copy OFFICE CONTSCTS IC C/SRXB:DSSA |
| | |
| | _ C/PECB:DRPM |
| | |
| | l/DRPM NAME JT pert |
| | |
| | * LMarsh |
| | |
| | * AChaffee BGrimes AB4rgensen |
| | |
| | *DATE /2/96 5/14/96 5 / /96 5 / /96 7 ArTTA I £'LFIL rIILvrv -'WI I AULOISI.WWI 5 JP4\ |
| | IN 96-XX May XX, 1995 This information |
| | |
| | notice requires no specific action or written response. |
| | |
| | If you have any questions |
| | |
| | about the information |
| | |
| | in this notice, please contact one of the technical |
| | |
| | contacts listed below or the appropriate |
| | |
| | Office of Nuclear Reactor Regulation |
| | |
| | project manager.Brian K. Grimes, Acting Direc r Division of Reactor Program anagement Office of Nuclear Reactor egulation Technical |
| | |
| | Contacts: |
| | John R. Tappert, NRR Bruc Jorgensen, RGN III (301) 415-1167 (7 ) 829-9615 Internet:jrt~nrc.gov |
| | |
| | I ernet:blJ~nrc.gov |
| | |
| | Attachment: |
| | List of Recently Issued NRC Informat1o |
| | |
| | otices DOCUMENT NAME:G:\JRT\WOLFICE.1I |
| | |
| | Tech Editor reviewed 5/1/96 To receive a copy of this ocument, indicate in the box: OCR -Copy without attachment/enclosure |
| | |
| | -C y with ttachment/enclosure |
| | |
| | N" -No copy OFFICE |
| | |
| | ==CONTACT== |
| | S IC C SRXB:DSSA |
| | |
| | I ?lC/PECB:DRPM |
| | |
| | D/DRPM NAME JTappert [7LMarsh ftv AChaffee BGrimes.~BJorgensel |
| | |
| | ;V 8 DATE 5 /2/96/ 5 /0t/96 5 / /96 5 //96 OFFICIAL RECORD COPY}} |
|
| |
|
| {{Information notice-Nav}} | | {{Information notice-Nav}} |
Degradation of Cooling Water Systems Due to IcingML031060039 |
Person / Time |
---|
Site: |
Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Issue date: |
06/12/1996 |
---|
From: |
Grimes B K Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
References |
---|
IN-96-036, NUDOCS 9606070097 |
Download: ML031060039 (11) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Category:NRC Information Notice
MONTHYEARInformation Notice 2020-02, Flex Diesel Generator Operational Challenges2020-09-15015 September 2020 Flex Diesel Generator Operational Challenges ML20225A0322020-09-0303 September 2020 NRC Choice Letter to NAC International with Attached Safety Inspection Report, IR 0721015/2020201, February 24-27, 2020 and July 22, 2020, Inspection of NAC International in Norcross, Georgia Information Notice 2012-09, PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs.2019-11-30030 November 2019 PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs. Information Notice 2011-20, NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011)2019-07-24024 July 2019 NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011) ML19196A2452019-07-15015 July 2019 Public Notice - Sequoyah Nuclear Plant, Unit 2 - Exigent Amendment to Facility Operating License Information Notice 2019-01, Inadequate Evaluation of Temporary Alterations2019-03-12012 March 2019 Inadequate Evaluation of Temporary Alterations ML16028A3082016-04-27027 April 2016 NRC Information Notice; IN 2016-05: Operating Experience Regarding Complications From a Loss of Instrumentation Air Information Notice 2015-05, Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps Information Notice 2015-05, Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps Information Notice 2013-20, OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-20, Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-11, OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2013-11, Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Contain2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notic2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool Information Notice 2012-11, Age Related Capacitor Degradation2012-07-23023 July 2012 Age Related Capacitor Degradation ML12031A0132012-02-0606 February 2012 U.S. Nuclear Regulatory Commission Investigation Report No. 2-2010-058, Cpn International, Inc Information Notice 2011-19, Licensee Event Reports Containing Information Pertaining to Defects to Basic Components2011-09-26026 September 2011 Licensee Event Reports Containing Information Pertaining to Defects to Basic Components Information Notice 2011-15, Steel Containment Degradation and Associated License Renewal Aging Management Issues2011-08-0101 August 2011 Steel Containment Degradation and Associated License Renewal Aging Management Issues Information Notice 2011-17, Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping2011-07-26026 July 2011 Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping Information Notice 2011-13, Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-13, Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13)2011-06-29029 June 2011 Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13) Information Notice 2011-13, OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-04, IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-262010-12-21021 December 2010 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 ML13066A1872009-12-16016 December 2009 Draft NRC Information Notice 2009-xx - Underestimate of Dam Failure Frequency Used in Probabilistic Risk Assessments ML1007804482009-11-23023 November 2009 Email from Peter Bamford, NRR to Pamela Cowan, Exelon on TMI Contamination Control Event Information Notice 2009-11, NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-112009-07-0707 July 2009 NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-11 Information Notice 2009-10, Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10)2009-07-0707 July 2009 Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10) Information Notice 2009-09, Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify2009-06-19019 June 2009 Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation2008-07-0707 July 2008 Reactor Trip Due to Off-Site Power Fluctuation Information Notice 2008-11, Service Water System Degradation at Brunswicksteam Electric Plant Unit 12008-06-18018 June 2008 Service Water System Degradation at Brunswicksteam Electric Plant Unit 1 Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants2008-04-0707 April 2008 Counterfeit Parts Supplied to Nuclear Power Plants Information Notice 1991-09, Counterfeiting of Crane Valves2007-09-25025 September 2007 Counterfeiting of Crane Valves Information Notice 2007-28, Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls2007-09-19019 September 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment2007-09-17017 September 2007 Temporary Scaffolding Affects Operability of Safety-Related Equipment Information Notice 2007-14, Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station2007-03-30030 March 2007 Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station Information Notice 2007-06, Potential Common Cause Vulnerabilities in Essential Service Water Systems2007-02-0909 February 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Information Notice 2007-05, Vertical Deep Draft Pump Shaft and Coupling Failures2007-02-0909 February 2007 Vertical Deep Draft Pump Shaft and Coupling Failures Information Notice 2006-31, Inadequate Fault Interrupting Rating of Breakers2006-12-26026 December 2006 Inadequate Fault Interrupting Rating of Breakers Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear Information Notice 2006-13, E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination2006-07-13013 July 2006 E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination 2020-09-03 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>. |
"J UNITED STATES NUCLEAR REGULATORY
COMMISSION
OFYFICE OF NUCLEAR REACTOR REGULATION
-WASHINGTON, DC 20555-0001 June 12, 1996 NRC INFORMATION
NOTICE 96-36: DEGRADATION
OF COOLING WATER SYSTEMS DUE TO ICING
Addressees
All holders of operating
licenses or construction
permits for nuclear power reactors.
Purpose
The U.S. Nuclear Regulatory
Commission (NRC) is issuing this information
notice to alert addressees
to potential
degradation
of facility water intake systems (circulating, service, and fire water) due to icing conditions.
It is expected that recipients
will review the information
for applicability
to their facilities
and consider actions, as appropriate, to avoid similar problems.
However, suggestions
contained
in this information
notice are not NRC requirements;
therefore, no specific action or written response is required.Description
of Circumstances
Wolf Creek Between 1:45 a.m. and 2:45 a.m. (all times central standard time) on January 30, 1996, operators
at Wolf Creek received alarms indicating
that the circulating
water system traveling
screens were becoming blocked. A visual inspection
showed that the traveling
screens for bays 1 and 3 were frozen and that water levels in these bays were approximately
2.5 m [8 ft] below normal.The emergency
service water system was started with the intent to separate this system from the service water system. However, the emergency
service water system was incorrectly
aligned; flow was directed to the service water system and warming flow to the emergency
service water system suction bays was restricted.
Operators
also shifted to circulating
water pump B. At approxi-mately 3:30 a.m., operators
received a service water pressure alarm and an electric fire pump started on low service water pressure.
The shift super-visor then directed a manual reactor/turbine
trip. Circulating
water system bays were subsequently
determined
to be at 3.5 m [12 feet] below normal. The level loss was caused by water from the spray wash system freezing and block-ing the traveling
screens.The Train A emergency
service water system pump was tripped and declared inoperable
at 7:47 a.m. because of low discharge
pressure and high strainer differential
pressure.
At about 8:00 a.m., the supervising
operator coming on shift noted the incorrect
alignment
of the emergency
service water system and took action to correct it. At about 5:45 p.m., the operators
declared Train A'~P) C-FW 0f bla .pDR :t:-E moric6 6'sVOU 160612 '
1.'K)IN 96-36 June 12, 1996 operable on the basis of an engineering
evaluation
and placed it in service.However, the pump was again stopped 1-1/2 hours later at approximately
7:30 p.m. when the pump exhibited
further oscillations
in flow and pressure.At approximately
8:00 p.m., operators
noted that emergency
service water system Train B suction bay level was 4.5 m [15 ft] below normal and decreasing
slowly. Operators
placed additional
heat loads on Train B and the suction bay levels subsequently
recovered.
At 10:14 p.m., the operators
again started Train A emergency
service water system and secured it at 10:27 p.m. due to decreasing
flow and pressure.At about 10:00 a.m. on January 31, divers inspected
the suction bay of Train A and noted complete blockage of the trash racks by frazil ice. Train B was not inspected
because the pump was running. The ice blockage was cleared by 4:00 p.m. by sparging the trash racks with air. The emergency
service water system was designed to have warming flow injected in front of trash racks to increase bulk water temperature
and prevent the formation
of frazil ice. Due to calculational
errors by the architect-engineer
and the as-built system configuration, the emergency
service water system warming flow was insufficient
to prevent frazil ice from forming at the Train A trash racks.FitzPatrick
On February 25, 1993, at 1:25 a.m., the electric fire pump started on low fire header pressure.
After verifying
normal fire header pressure, operators secured the electric fire pump, and the diesel fire pumps subsequently
started on low header pressure.
It was later determined
that the fire jockey pump had lost suction because of the decreasing
screenwell
level.Over the next several minutes, operators
noted an increase in circulating
water system motor amperage (which is consistent
with decreased
suction pressure).
Reactor power was also reduced and one circulating
water pump was secured. At 1:40 a.m., an operator reported that the screenwell
level was approximately
3 m [10 ft] below normal and the reactor was manually scrammed.After a second circulating
water pump was subsequently
secured, the screenwell
water level quickly recovered.
The licensee concluded
that the reduced screenwell
level had been caused by ice partially
blocking the lake intake structure.
Either frazil ice formed around or in front of the heated intake bar racks, or slush ice was present in front of the bar racks.Fermi On February 5, 1996, at approximately
2:30 p.m., diesel generator
service water pump C failed to develop normal discharge
pressure, flow, and motor current during a surveillance.
This made Division I emergency
diesel generator (EDG) 12 inoperable.
After several unsuccessful
attempts to start the pump, an air purge of the pump column on the discharge
of the pump was initiated
in an attempt to clear any obstruction
in the column or the pump inlet. The licensee detected blockage when it tried to blow air through the pipe. At 8:21 p.m., the pump was started and after 3 to 5 seconds an erratic discharge
pressure was noted. In a short time, pump flow, discharge
pressure, and motor amps were normal. The following
day, on February 6, diesel generator
service water pump B was started. The pump, which cools Division II
K> < IN 96-36 June 12, 1996 EDG 13, showed no flow, no pressure, and low amperage for the first 30 seconds. After approximately
90 seconds, normal flow discharge
pressure and motor current were achieved.
The remaining
safety-related
pumps were tested satisfactorily.
The diesel generator
service water pumps are all deep-draft
pumps and take suction from the ultimate heat sink reservoir
which is a segregated
pool. The licensee evaluation
concluded
that although the reservoir
temperatures
are maintained
above 5 eC [41 OF], part of the pump column and two of the linear guide bearings are located above the water level and are exposed to ambient air temperature
conditions.
The failure of the diesel generator
service water pump C was attributed
to ice buildup around the shaft and spider bearing from leakage past the discharge
check valve and the cold weather. The licensee also concluded
that under some credible meteorological
conditions, the functions
of both divisions
could have been affected.Discussion
Frazil icing is a phenomenon
that affects the operation
of intake structures
in regions that experience
cold weather. The accumulation
of frazil ice on intake trash racks can completely
block the flow of water into the intake.The process starts when the water flowing into the intake is supercooled (a condition
where the water is below the freezing point). The supercooling
may be very small, on the order of a few hundredths
of a degree.The supercooling
occurs with a loss of heat from a large surface area such as a lake with open water and clear nights. High winds contribute
to the problem by providing
mixing of the supercooled
water to depths as great as 6 to 9 m[20 to 30 ft]. The frazil ice, which is composed of very small crystals (1-15 mm) with little buoyancy because of their size, is carried along in the water and mixed all through the supercooled
water.The suction of the supercooled
water and the suspended
frazil ice crystals through an intake structure
brings the frazil ice crystals in contact with the trash rack bars. Frazil ice crystals easily adhere to any object with which they collide. The ice collects first on the upstream side of the trash racks, then steadily grows until the space between the trash racks is bridged. This bridging rapidly blocks the trash racks. The accumulation
of ice can with-stand high differential
pressures;
effectively
damming the intake suction.Facility vulnerability
to icing events is a function of plant design. Frazil and other ice formation
is dependent
on specific environmental
conditions
and represents
a potential
common-mode
failure that can cause the loss or degrada-tion of multiple cooling water systems, including
the potential
loss of the ultimate heat sink.
IN 96-36 June 12, 1996 Related Information
NUREG/CR-0548, "Ice Blockage of Water Intakes." This information
notice requires no specific action or written response.
If you have any questions
about the information
in this notice, please contact one of the technical
contacts listed below or the appropriate
Office of Nuclear Reactor Regulation
project manager.I i -..--.....-.Brian K. Grimes, Acting Director Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical
Contacts: John R. Tappert, NRR (301) 415-1167 Internet:jrtlnrc.gov
Bruce Jorgensen, RIII (708) 829-9615 Internet:blj@nrc.gov
Attachment:
List of Recently Issued NRC Information
Notices I k W (0%0%J4-c- -d I
K>Attachment
IN 96-36 June 12, 1996 LIST OF RECENTLY ISSUED NRC INFORMATION
NOTICES Information
Date of Notice No. Subject Issuance Issued to 96-35 Failure of Safety Systems on Self-Shielded
Irradia-tors Because of Inadequate
Maintenance
and Training Hydrogen Gas Ignition during Closure Welding of a VSC-24 Multi-Assembly
Sealed Basket 06/11/96 05/31/96 All U.S. Nuclear Regulatory
Commission
irradiator
licensees
and vendors All holders of OLs or CPs for nuclear power reactors 96-34 96-33 Erroneous Defective Results ii Data From Thermocouple
i a Fire 05/24/96 All material and fuel cycle licensees
that monitor tem-perature with thermocouples
96-32 96-31 96-30 Implementation
of 10 CFR 50.55a(g)(6)(ii)(A),"Augmented
Examination
of Reactor Vessel" Cross-Tied
Safety Injec-tion Accumulators
Inaccuracy
of Diagnostic
Equipment
for Motor-Operated Butterfly
Valves Requirements
in 10 CFR Part 21 for Reporting
and Evaluating
Software Errors Suggested
Guidance Relating to Development
and Imple-mentation
of Corrective
Action Potential
Clogging of High Pressure Safety Injection Throttle Valves During Recirculation
06/05/96 05/22/96 05/21/96 05/20/96 05/01/96 05/01/96 All holders of OLs or CPs for nuclear power reactors All holders of OLs or CPs for pressurized
water reactors All holders of OLs or CPs for nuclear power reactors All holders of OLs or CPs for nuclear power reactors All material and fuel cycle licensees All holders of OLs or CPs for pressurized
water reactors 96-29 96-28 96-27 OL -Operating
License CP = Construction
Permit
.I IN 96-36 June 12, 1996 Related Information
NUREG/CR-0548, "Ice Blockage of Water Intakes." This information
notice requires no specific action or written response.
If you have any questions
about the information
in this notice, please contact one of the technical
contacts listed below or the appropriate
Office of Nuclear Reactor Regulation
project manager.Original signed by Brian K. Grimes Brian K. Grimes, Acting Director Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical
Contacts: John R. Tappert, NRR (301) 415-1167 Internet:jrt@nrc.gov
Bruce Jorgensen, RIII (708) 829-9615 Internet:blj@nrc.gov
Attachment:
List of Recently Issued NRC Information
Notices DOCUMENT NAME: 96-36.IN Tech Editor reviewed 5/1/96 To receive a copy of attachment/enclosure
- s this document, indicate in the box: "C""EN -Copy with attachment/enclosure
ee Drevious concurrences
-Copy without"N" -No co OFFICE
CONTACT
S IC C/SRXB:DSSA
I C/PECB:DRPM
D/JT(S, i NAME JTappert
BKf1Tntee'
l BJorgensen
- lDATE 5 /2/96 5/14/96 6/5/96 6//(/96 OFFICIAL RECORD COPY
IN 96-XX June XX, 1996 Related information
NUREG/CR-0548, *Ice Blockage of Water Intakes" This information
notice requires no specific action or written response.
If you have any questions
about the information
in this notice, please contact one of the technical
contacts listed below or the appropriate
Office of Nuclear Reactor Regulation
project manager.Brian K. Grimes, Acting Director Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical
Contacts: John R. Tappert, NRR (301) 415-1167 Internet:Jrt@nrc.gov
Bruce Jorgensen, RIII (708) 829-9615 Internet:bl
Jnrc.gov Attachment:
List of Recently Issued NRC Information
Notices DOCUMENT NAME:G:\JRT\WOLFICE.IN
Tech Editor reviewed 5/1/96 To receive a copy of this document, indicate in the box: ACT attachment/enclosure
'El -Copy with attachment/enclosure
- see orevious concurrences
-Copy without ON" -No copy OFFICE
CONTACT
S C C/SRXB:DSSA
I C/PECB:DRPM
I D/DRPM NAME JTappert
- AChaffeer,(, IBGrimes BJorgensen
- DATE 5 /2/96 5/14/96 6 _ _ _6/ _/96 UrIU-lAL KLLUKU WO/WY-,*-)
-IN 96 d May XX, 1995 Related-Information
NUREG/CR-0548, "Ice Blockage of Water Intakes" This information
notice requires no specific action or written response.
If you have any questions
about the information
in this notice, please contact one of the technical
contacts listed below or the appropriate
Office of Nuclear Reactor Regulation
project manager.Brian K. Grimes, Acting Director Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical
Contacts: John R. Tappert, NRR (301) 415-1167 Internet:jrt@nrc.gov
Bruce Jorgensen, RIII (708) 829-9615 Internet:blj@nrc.gov
Attachment:
List of Recently Issued NRC Information
Notices DOCUMENT NAME:G:\JRT\WOLFICE.IN
Tech Editor reviewed 5/1/96 To receive a copy of this document, indicate in the box: "C" attachment/enclosure "E" = Copy with attachment/enclosure
= Copy without"N" = No copy OFFICE
CONTACT
S IC C/SRXB:DSSAl
C/PECB:DRPM
l D/DRPM H NAME JTappert
- AChaffee BGrimes BJorgensen
- DATE 5 /2/96 5/14/96 5 / /96 5 / /96 OFFICIAL RECORD COPY
IN 96-XX May XX, 1995 This information
notice requires no specific action or written response.
If you have any questions
about the information
in this notice, please contact one of the technical
contacts listed below or the appropriate
Office of Nuclear Reactor Regulation
project manager.Brian K. Grimes, Acting Director Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Technical
Contacts: John R. Tappert, NRR (301) 415-1167 Internet:jrt~nrc.gov
Bruce Jorgensen, RIII (708) 829-9615 Internet:bl
Jnrc.gov Attachment:
List of Recently Issued NRC Information
Notices DOCUMENT NAME:G:\JRT\WOLFICE.IN
Tech Editor reviewed 5/1/96 To receive a copy of this document, Indicate in the box: "C'attachment/enclosure
HEN -Copy with attachment/enclosure
- see nrevinus concurrences
-Copy without ON" -No copy--r-V. ---*OFFICE
CONTACT
S IC C/SRXB:DSSA
[_ C/PECB:DRPM
I D/DRPM NAME JTappert
- AChaffee BGrimes BJorgensen
- DATE 5 12/96 5/14/96 5 / /96 5 / /96.- -----------. b OFFICIAL KLLRCD COPY so§S
IN 96-XX May XX, 1995 This information
notice requires no specific action or written you have any questions
about the information
In this notice, pl one of the technical
contacts listed below or the appropriate
0 Nuclear Reactor Regulation
project manager..act of Technical
Contacts: John R. Tappert, (301) 415-1167 Internet :Jrt~nrc Brian K. Grimes Acting Director Division of Resctor Program Management
Office of Nu ear Reactor Regulation
NRR uce Jorgensen, RGN III (708) 829-9615:.gov Internet:blj@nrc.gov
NRC I iormation
Notices Attachment:
List of Recently Issued DOCUMENT NAME:G:\JRT\WO
4ICE.IN Tech Editor reviewed /1/96 To receive a copy p this documi attachment/enclosyre "E -Coi seep nrpvinu!ent, indicate in the box: IC'py with attachment/enclosure
I concurrences
= Copy without ON, -No copy OFFICE CONTSCTS IC C/SRXB:DSSA
_ C/PECB:DRPM
l/DRPM NAME JT pert
- AChaffee BGrimes AB4rgensen
- DATE /2/96 5/14/96 5 / /96 5 / /96 7 ArTTA I £'LFIL rIILvrv -'WI I AULOISI.WWI 5 JP4\
IN 96-XX May XX, 1995 This information
notice requires no specific action or written response.
If you have any questions
about the information
in this notice, please contact one of the technical
contacts listed below or the appropriate
Office of Nuclear Reactor Regulation
project manager.Brian K. Grimes, Acting Direc r Division of Reactor Program anagement Office of Nuclear Reactor egulation Technical
Contacts:
John R. Tappert, NRR Bruc Jorgensen, RGN III (301) 415-1167 (7 ) 829-9615 Internet:jrt~nrc.gov
I ernet:blJ~nrc.gov
Attachment:
List of Recently Issued NRC Informat1o
otices DOCUMENT NAME:G:\JRT\WOLFICE.1I
Tech Editor reviewed 5/1/96 To receive a copy of this ocument, indicate in the box: OCR -Copy without attachment/enclosure
-C y with ttachment/enclosure
N" -No copy OFFICE
CONTACT
S IC C SRXB:DSSA
I ?lC/PECB:DRPM
D/DRPM NAME JTappert [7LMarsh ftv AChaffee BGrimes.~BJorgensel
- V 8 DATE 5 /2/96/ 5 /0t/96 5 / /96 5 //96 OFFICIAL RECORD COPY
|
---|
|
list | - Information Notice 1996-01, Potential For High Post-Accident Closed-Cycle Cooling Water Temperatures to Disable Equipment Important to Safety (3 January 1996)
- Information Notice 1996-01, Potential for High Post-Accident Closed-Cycle Cooling Water Temperatures to Disable Equipment Important to Safety (3 January 1996)
- Information Notice 1996-02, Inoperability of Power-Operated Relief Valves Masked by Downstream Indications During Testing (5 January 1996, Topic: Stroke time)
- Information Notice 1996-03, Main Steam Safety Valve Setpoint Variation as a Result of Thermal Effects (5 January 1996)
- Information Notice 1996-03, Main Steam Safety Valve Setpoint Variation As a Result of Thermal Effects (5 January 1996)
- Information Notice 1996-04, Incident Reporting Requirements for Radiography Licensees (10 January 1996, Topic: Brachytherapy)
- Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel (18 January 1996, Topic: Reactor Vessel Water Level)
- Information Notice 1996-06, Design & Testing Deficiencies of Tornado Dampers at Nuclear Power Plants (25 January 1996)
- Information Notice 1996-07, Slow Five Percent Scram Insertion Times Caused by Viton Diaphragms in Scram Solenoid Pilot Valves (26 January 1996)
- Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve (5 February 1996, Topic: Anchor Darling, Cold shutdown justification)
- Information Notice 1996-09, Damage in Foreign Steam Generator Internals (12 February 1996, Topic: Earthquake)
- Information Notice 1996-10, Potential Blockage by Debris of Safety System Piping Which Is Not Used During Normal Operation or Tested During Surveillances (13 February 1996)
- Information Notice 1996-10, Potential Blockage by Debris of Safety System Piping Which is Not Used During Normal Operation or Tested During Surveillances (13 February 1996)
- Information Notice 1996-11, Ingress of Demineralizer Resins Increases Potential For Stress Corrosion Cracking of Control Rod Drive Mechanism Penetrations (14 February 1996)
- Information Notice 1996-11, Ingress of Demineralizer Resins Increases Potential for Stress Corrosion Cracking of Control Rod Drive Mechanism Penetrations (14 February 1996)
- Information Notice 1996-12, Control Rod Insertion Problems (15 February 1996)
- Information Notice 1996-13, Potential Containment Leak Paths Through Hydrogen Analysis (26 February 1996)
- Information Notice 1996-14, Degradation of Radwaste Facility Equipment at Millstone Nuclear Power Station, Unit 1 (1 March 1996)
- Information Notice 1996-15, Unexpected Plant Performance During Performance of New Surveillance (8 March 1996)
- Information Notice 1996-16, BWR Operation with Indicated Flow Less than Natural Circulation (14 March 1996)
- Information Notice 1996-17, Reactor Operation Inconsistent with the Updated Final Safety Analysis Report (18 March 1996)
- Information Notice 1996-18, Compliance with 10 CFR Part 20 for Airborne Thorium (25 March 1996, Topic: Brachytherapy)
- Information Notice 1996-19, Failure of Tone Alert Radios to Activate When Receiving a Shortened Activation Signal (2 April 1996)
- Information Notice 1996-20, Demonstration of Associated Equipment Compliance with 10 CFR 34.20 (4 April 1996, Topic: Brachytherapy)
- Information Notice 1996-21, Safety Concerns Related to the Design of the Door Interlock Circuit on Nucletron High-Dose Rate and Pulsed Dose Rate Remote Afterloading Brachytherapy Devices (10 April 1996, Topic: Brachytherapy)
- Information Notice 1996-22, Improper Equipment Settings Due to Use of Nontemperature-Compensated Test Equipment (11 April 1996, Topic: Brachytherapy)
- Information Notice 1996-23, Fires in Emergency Diesel Generator Exciters During Operation Following Undetected Fuse Blowing (22 April 1996, Topic: Brachytherapy)
- Information Notice 1996-24, Preconditioning of Molded-Case Circuit Breakers Before Surveillance Testing (25 April 1996, Topic: Brachytherapy)
- Information Notice 1996-25, Traversing In-Core Probe Overwithdrawn at Lasalle County Station, Unit 1 (30 April 1996, Topic: Brachytherapy)
- Information Notice 1996-26, Recent Problems with Overhead Cranes (30 April 1996, Topic: Brachytherapy)
- Information Notice 1996-26, Recent Problems With Overhead Cranes (30 April 1996)
- Information Notice 1996-27, Potential Clogging of High Pressure Safety Injection Throttle Valves During Recirculation (1 May 1996, Topic: Brachytherapy)
- Information Notice 1996-28, Suggested Guidance Relating to Development and Implementation of Corrective Action (1 May 1996, Topic: Brachytherapy)
- Information Notice 1996-29, Requirements in 10 CFR Part 21 for Reporting and Evaluating Software Errors (20 May 1996, Topic: Brachytherapy)
- Information Notice 1996-30, Inaccuracy of Diagnostic Equipment for Motor-Operated Butterfly Valves (21 May 1996)
- Information Notice 1996-31, Cross-Tied Safety Injection Accumulators (22 May 1996)
- Information Notice 1996-32, Implementation of 10 CFR 50.55a(g) (6) (II) (A), Augmented Examination of Reactor Vessel (5 June 1996, Topic: Non-Destructive Examination)
- Information Notice 1996-32, Implementation of 10 CFR 50.55a(g) (6) (ii) (A), Augmented Examination of Reactor Vessel (5 June 1996, Topic: Nondestructive Examination)
- Information Notice 1996-33, Erroneous Data From Defective Thermocouple Results in a Fire (24 May 1996, Topic: Reverse polarity)
- Information Notice 1996-33, Erroneous Data from Defective Thermocouple Results in a Fire (24 May 1996, Topic: Reverse polarity)
- Information Notice 1996-34, Hydrogen Gas Ignition During Closure Welding of a VSC-24 Multi-Assembly Sealed Basket (31 May 1996)
- Information Notice 1996-35, Failure of Safety Systems on Self-Shielded Irradiators Because of Inadequate Maintenance and Training (11 June 1996)
- Information Notice 1996-36, Degradation of Cooling Water Systems Due to Icing (12 June 1996, Topic: High winds, Ultimate heat sink, Frazil ice)
- Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown (18 June 1996, Topic: Reactor Vessel Water Level)
- Information Notice 1996-38, Results of Steam Generator Tube Examinations (21 June 1996)
- Information Notice 1996-39, Estimates of Decay Heat Using ANS 5.1 Decay Heat Standard May Vary Significantly (5 July 1996)
- Information Notice 1996-40, Defciencies in Material Dedication and Procurement Practices and in Audits of Vendors (7 October 1996, Topic: Coatings, Troxler Moisture Density Gauge)
- Information Notice 1996-41, Effects of a Decrease in Feedwater Temperature on Nuclear Instrumentation (26 July 1996)
- Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves (5 August 1996, Topic: Reactor Vessel Water Level)
- Information Notice 1996-43, Failures of General Electric Magne-Blast Circuit Breakers (2 August 1996)
... further results |
---|