U-602682, Monthly Operating Rept for Dec 1996 for Clinton Power Station Unit 1

From kanterella
(Redirected from U-602682)
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1996 for Clinton Power Station Unit 1
ML20133N798
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/31/1996
From: Demark W, Telthorst P
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-602682, NUDOCS 9701230411
Download: ML20133N798 (5)


Text

_- - - .- .

l lilinois Power Company l Clinton Power Station P.O. Box 678 Clinton, IL 61727 Tel 217 935-8881 P6WER u-602682 8E.100c j

1 January 7, 1997 10CFR50.36 Docket No. 50-461 l

U.S. Nuclear Regulatory Commission Document Control Desk j Washington, D.C. 20555 '

Subject:

Clinton Power Station, Unit 1 Facility Operating License NPF-62 -

December 1996 Monthlv Operatino- Report

Dear Madam or Sir:

I Please find in Attachment 1 the Monthly Operating i Report for Clinton Power Station, Unit 1, for the period ending December 31, 1996.  !

Sincerely yours, i

Paul J. Telthorst 150034 Director - a censing \ l WED/ pay -

Attachments /(,1 l'Y ,

l l

l cc: NRC Region III Regional Administrator NRC Resident Office, V-690 Illinois Department of Nuclear Safety I 9701230411 961231 i PDR ADOCK 05000461  !

R PDR. j i

i . .

se.

s ,

Attachmtnt 1

. a, U-602682 Page 1 of 4 l

CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month December 1996 NONE J

l l

l l

l l

l l

i I

- -. . .. . . =., _ _ . - .

e ,

Attcchmrnt 1

. U-602682 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL j DOCKET NO. 50-461 UNIT Clinton 1 DATE 12/31/96 COMPLETED BY W. E. DeMark ,

TELEPHONE (217)935-8881 X3537 l l

MONTH December 1996 i

l 1 0 17 0 2 0 18 0 3 0 19 0 j 4 0 20 0  ;

5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0

l * .

Attachm:nt 1 l

. U-602682 Page 3 of 4 i OPERATING DATA REPORT l

i l DOCKET NO. 50-461 l

l UNIT Clinton 1 DATE 12/31/96 COMPLETED BY W. E. DeMark l

t l TELEPHONE (217) 935-8881 X3537 1

OPERATING STATUS l

1. REPORTING PERIOD: December 1996 GROSS HOURS IN REPORT PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) : 2894 MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 930 DESIGN ELECTRICAL RATING (MWe-Net) : 933
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY) : N/A i l

'IHIS M'NIH YR 'IO DA'IE CLM EATIVE

5. NGEER OF 10URS REACIDR WAS CRITICAL. . . . . . O.0 5,858.3 58,883.8
6. REACIDR RESERVE SHUIDOWN 100RS. . . . . . . . . . . . O.0 0.0 0.0 l

7 100RS GENERA'IOR CN LINE. . . . . . . . . . . . . . . . . 0.0 5.833.8 57,401.9

8. UTIT RESERVE SHUIDOWN IIGS. . . . . . . . . . . . . . O.0 0.0 4.0
9. GROSS THERMAL ENERGY GENERATED (M) . . . . . . . 0 16.690,339 154,700,590
10. GROSS ELECIRICAL ENERGY GENERATED (M) . . . . . 0 5,559,814 51.120,966 ,

1

11. NEI' ELECIRICAL DERGY GE2ERATED (M) . . . . . . 0 5,311.780 49,697,141 I
12. REACIIR SERVICE FACIOR. . . . . . . . . . . . . . . . . . 0.0% 66.7% 73.8%
13. REACKR AVAIIABILITY FACIOR. . . . . . . . . . . . . . O.0% 66.7% 73.8%
14. UNIT SERVICE FACIGR. . . . . . . . . . . . . . . . . . . . . 0.0% 66.4% 71.9%
15. HTIT AVAIIABILITY FACIOR. . . . . . . . . . . . . . . . . 0.0% 66.4% 71.9%
16. UNIT CAPACITY FACKR (Using MDC) . . . . . . . . . . O.0% 65.0% 65,6%
17. INIT CAPACITY FACIOR (Using Design MWe. . . . . 0.0% 64.8% 65.4%
18. INIT FORCED CUI' AGE RATE. . . . . . . . . . . . . . . . . O 0% 15.0% 9.1%
19. SHUIDOWNS SOEDULE DOVER NEXT SIX M27IHS (TYPE, DATE, DURATICN OF EAG):

l None i

20. IF SHUT DOWN AT END OF REPCRT PERIOD, ESTIMATED DATE OF STARTUP:

The unit will remain shutdown until the completion of Refueling Outage 6 j (RF-6); expected restart dated is January 30, 1997.

1 l

4 ; m.  !

Attachment 1 -

U-602682 - ~A Page 4 of 4 i UNIT SHUTDOWNS AND POWER REDUCTIONS -

DOCKET NO. 50-461 UNIT Clinton 1 DATE 12/31/96 COMPLETED BY W. E. DeMark i.

l REPORT MONTH December 1996 l

t METHOD OF TYPE SHUTTING DOWN ,

F: FORCED DURATION THE REACTOR OR CORRECTIVE *:

NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) ACTIONS / COMMENTS RF-6 10/13/96 S 744.0 .C. Refueling Outage The unit remains *[

in refueling outage.

I r

(1) Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction, E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)

H - Other (explain)

(2) Method 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain) v t

n 6

- - - - - _ . . _ . m__. _ _ . _ . . _ _ _ _ . _ . _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ . _ _ _ _ . ________,-..-,mm , -..--m_.._..v_, _ . . _ , , , , , , , . _ _ , , ._, , _ ,.