Monthly Operating Rept for Oct 1995 for Clinton Power Station
ML20094H304
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/31/1995
From: Hollon M, Phares R
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
U-602514, NUDOCS 9511140116
Download: ML20094H304 (5)


Text

__ __ ._ ~, ._ _ _ _ . . . . . . . . -

. i. l y .. .

l liknots Power Company '

  • Chnton Power Station P.O. Box 678
  • Chnton, IL 61727 Tel 217 935-8881 ILLIN915 L3 11- 07) -LP 8E.100c November 7, 1995 10CFR50.36 I

Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Clinton Power Station, Unit 1 Facility Operating License NPF-62 October 1995 Monthly Ooerallne Report

Dear Sir:

Please find 'in;

Attachment:

l' the Monthly Operating Report for  ;

Clinton Power Station, Unit 1, for the period ending October 31,  !

1995. l Sincerely yours,

.d icjw i

Richard F. Phares  !

Director - Licensing MCH/kra Attachment ec: NRC Region III Regional Administrator NRC Resident Office, V-690 Illinois Department of Nuclear Safety 1dGOGi 9511140116 951031 ,

PDR ADOCK 05000461 / l R PDR 1

4 ..' '.

.' a* Attachment-~1 to U-602514

.Page 1 of 4

't CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES' Month October 1995 None

6

~

Attachment 1 to U-602514 I c Page 2 of 4

\

AVERAGE DAILY UNIT PO~JER LEVEL

}

DOCKET NO. 50-461 t

UNIT Clinton 1  !

t DATE 10/31/95 j COMPLETED BY M. C. Hollon I TELEPHONE (217) 935-8881 X3537' MONTH October 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL  !

(NWe-Net) (NWe-Net) l i

1 913 17 917  !

2 913 18 918  ;

3 914 19- 918 4 915 20 920 ___  ;

5 916 21' 920 6 915 22 919 7 917 23 918 8 886 24 919~  !

9 916 25 _919 '!

10 917 26 919 11 916 27 918  ;

12 916 _ 28 919 i i

13 915 29 916 i i

14 915 30 ~ 920 l

15- 914 31 921 i 16 916 ,

i Y

h i

j

Attcchment 1 to U-602514 Page 3 of 4 OPERATING DATA REPORT DOCKET NO. 50-461  :

UNIT Clinton 1 DATE 10/31/95 COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537' OPERATING STATUS

1. REPORTING PERIOD: October 1995 GROSS HOURS IN REPORTING PERIOD:-24,1 ,
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 21.9s, MAX. DEFEND. CAPACITY (MDC) (MWe-Net): 2.lQ f' DESIGN ELECTRICAL RATING (MWe-Net): 2]1 1
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): Egna ,
4. REASONS FOR RESTRICTION (IF ANY): N/A )

THIS MONTH YR TO DATE CUMULATIVE  !

5. NUMBER OF HOURS REACTOR WAS CRITICAL... 745.0 5.969.8 51.721.7
6. REACTOR RESERVE SHUTDOWN HOURS......... 0.0 0.0 0.0
7. HOURS GENERATOR ON LINE................ 745.0 5.850.1 50.274.5
8. UNIT RESERVE SHUTDOWN HOURS............ 0.0 0.0 4.0
9. GROSS THERMAL ENERGY GENERATED (MWH)... 2.162.269 15.859.358 134.325.556
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 711.138 5.192.127 44.349.078
11. NET ELECTRICAL ENERGY GENERATED (MWH).. 682.367 4.949.084 42.225.262
12. REACTOR SERVICE FACTOR................. 100.0% 81.8% 74.4%
13. REACTOR AVAIIABILITY FACTOR. . . . . . . . . . . . 100.0% 81.8% 74.4%
14. UNIT SERVICE FACTOR.................... 100.0% 80.2% 72.3%
15. UNIT AVAIIABILITY FACTOR............... 100.0% 80.2% 72.3%
16. UNIT CAPACITY FACTOR (Using MDC)....... 98.5% 72.9% 65.3%
17. UNIT CAPACITY FACTOR (Using Design MWe) 98.2% 72.7% 65.1%
18. UNIT FORCED OUTAGE RATE................ 0.0% 3.7% 8.6%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

None

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA

_ _ _ _ _ _ __~ . - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ . . . _ _ - _ . - _ _ _ . _ _ _ _ - - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ - _ _ - - - _ _ _ - - - - _ _ _ _ _

Attcchment 1 '

to U-602514 .

Page 4 of 4 #

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 UNIT Clinton 1 DATE 10/31/95 COMPLETED BY M. C. Hollon TELEPHONE (217) 935-8881 X3537 REPORT MONTH October 1995 METHOD OF-TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S ScHFnUT.rn (HOURS) REASON (1) REDUCING POWER (2) ACTIONS /COimmi5 None (1) Reason A-Equipment Failure (explain), B-Maintenance.or Test, C-Refueling, D-Regulatory Restriction, -

E-Operator Training & License Examination, F-Administrative, G-Operational Error (explain),

H-Other (explain)

(2) Method .

1-Manual, 2-Manual Scram, 3-Automatic Scram, 4-Other (explain)- ,

I I

6