e

, lihnois Power Company Chnton Power Station I

, P.O. Box 678 Chnton, IL 61727 Tel 217 935-8881 P(WWER U-602710 8E.100c March 7, 1997 10CFR50.36 l

l Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Clinton Power Station, Unit 1 l

Facility Operating License NPF-62 February 1997 Monthlv Operatina Reoort

Dear Madam or Sir:

l Please find in Attachment 1 the Monthly operating Report for Clinton Power Station, Unit 1, for the period I ending February 28, 1997. l l

l Sincerely yours, I

0/

l

~

Paul J. Telthorst l Director - Licensing i l

WED/ pay. <

^ / I Attachments.

cc: NRC Region III Regional Administrator

- NRC Resident Office, V-690 l Illinois Department of Nuclear Safety i

i w" 9703120041 970229 ADOCKOSOOg1 .

, (DR

Attachmsnt 1 e m. U-602710

> Page 1 of 4 CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Month February 1997 NONE l

l

\

l l

e 1 Attachm:nt 1 1

, . , U-602710

. Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 4

UNIT Cliaton 1 DATE 2/28/97 COMPLETED BY _

W. E. DeMark TELEPHONE (217) 935-8881 X3537 i

MONTH February 1997 4

1 0 17 0 2 0 18 0 3 0 19 0 ,

1 4 0 20 0 l 5 0 21 0 I l

6 0 22 0 7 0 23 0

~

8 0 24 0 9 0 25 0 l 10 0 26 0 1

i 11 0 27 0 12 0 28 0 13 0 J

14 0 l

15 0 16 0

e Attachm nt 1

. .. U-602710 4

Page 3 of 4 OPERATING DATA REPORT l DOCKET NO. 50-461 UNIT Clinton 1 DATE 2/28/97 COMPLETED BY W. E. DeMark TELEPHONE (217)935-8881 X3537 OPERATING STATUS

1. kEPORTING PERIOD: February 1997 GROSS HOURS IN REPORT PERIOD: 672
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2894 MAX. DEPEND. CAPACITY (MDC) (MWe-Net) : 930 DESIGN ELECTRICAL RATING (MWe-Net) : 933
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) : None
4. REASONS FOR RESTRICTION (IF ANY) : N/A HIIS KNIH YR TO DATE CLNULATIVE
5. NtNBER OF IKXJRS REACIOR NAS CRITICAL. . . . . . 0.0 0.0 58,883.8
6. REACIOR RESERVE SHUIDOWN 100RS. . . . . . . . . . . 0.0 0.0 0.0
7. 100RS GENERATOR CN LINE. . . . . . . . . . . . . . . . . 0.0 0.0 57,401.9
8. INIT RESERVE SHLTIDOWN 100RS. . . . . . . . . . . . . . 0.0 0.0 4.0 j
9. GROSS DIERMAL ENERGY GENERATED (MWH) . . . . . . . 0 0.0 154,700,590
10. GROSS ELECIRICAL ENERGY GENERATED (MWH) . . . . . 0 0.0 51.120.966
11. NET. ELECIRICAL ENERGY GENERATED (FMI) . . . . . 0 0 48,697.141
12. REACICR SERVICE FACIOR . . . ............. 0.0% 0.0% 72.5%
13. REACIOR AVAIIABILTIY FACIOR.............. O.0% 0.0% 72.5%
14. INIT SERVICE FACIOR. . . . . . . . . . . . . . . . . . . . . O 0% 0.0% 70.7%
15. INIT AVAIIABILITY FACICR. . . . . . . . . . . . . . . . . 0.0% 0.0% 70.7%
16. INIT CAPACITY FACIOR (Usin3 FOC) . . . . . . . . . . 0.0% 0.0% 64.5%
17. INIT CAPACITY FACIOR (Using Design FHe. . . . . O.0% 0.0% 64.3%
18. INIT FORCED OLTI' AGE RATE. . . . . . . . . . . . . . . . . O.0% 0. 01r 9.1%
19. SHUIDOWNS SCHEDULE DOVER NEXT SIX KNIHS (TYPE, DATE, DURATICN OF EACH) :

None

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

The unit will remain shutdown until the completion of Refueling Outage 6 (RF-6); expected restart dated is April 21, 1997.

._-..m-m.. ... m . ._n_ . . _ _ . _ . _ . - . . m m . ~ .. ._..._..-._.u. , .. _ , ., , . . . . _ . . . . _ __- m. . . . ._ . ... _.m_... _ _ ~ . _ .

4 Attachment 1 ,

U-602710

~

Page 4 of 4 }

UNIT SHUTDOWNS AND POWER REDUCTIONS ,

DOCKET NO. 50-461 UNIT Clinton 1 i DATE 2/28/97 COMPLETED BY W. R,.DeMark i

. f REPORT MONTH February 1997 ,

METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE ,

NO. DATE S: SCHEDrJLED (HOURS) REASON (1) REDUCING POWER (2) ACTIONS / COMMENTS i RF-6 10/13/96 S 672.0 C. Refueling Outage The unit remains l in refueling outage. j t

^

i f t

I I

(1) Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction, E - Operator training & License Examination, F - Administrative, G - Operational Error (explain) [

H - Other (explain) [

(2) Method i 1 - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)

[

3 I

i b

i b

i l

t

___._ ....____.___.__..___.____-.__m._..__..:___.____m_.___.______m_uu__ _-.____m___m--- - _. e -.-r u - - -