Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20261N1025 June 1981BECHTEL GROUP
INC.
Piping Isometric:Main Steam System Ctmt Bldg Steam Gen 1-2Other
ML20054G58420 May 1982SACRAMENTO MUNICIPAL UTILITY DISTRICT
Rodrigues R
Submits Addl Info Re Auxiliary Feedwater Header Mod,Per NRC Request.Existing Headers Have Become Distorted Since Original Fabrication.Headers Will Be Replaced & Stabilized to Prevent Further Unacceptable Damage to Steam GeneratorsOther
ML20054H50621 June 1982Wells R
Consumers Energy
Requests List of Specific New B&W Steam Generator Auxiliary Feedwater Header Design Details Required for NRC Design Review of New Scheme to Supply Auxiliary Feedwater to Steam GeneratorsOther
ML20054M36523 June 1982FirstEnergy
Crouse R
Forwards Public Version of Revision 4 to Emergency Plan, Per 10CFR50 App E.Cover Sheet & Receipt Form EnclRequest
ML20054J48423 June 1982Novak T
Office of Nuclear Reactor Regulation
Requests Addl Info Re Auxiliary Feedwater Header Repair, Reported in LER 82-019,Revision 1.Info Needed 10 Days Prior to Scheduled RestartOther
ML20062C40730 July 1982FirstEnergyTech Spec Table 3.7-3 Re safety-related Hydraulic Snubbers. Safety Evaluation for Auxiliary Feedwater Header Replacement EnclOther
ML20062C39430 July 1982FirstEnergy
Murray T
Crouse R
Application for Amend to License NPF-3,revising Tech Spec Table 3.7-3 to Reflect Steam Generator Auxiliary Feedwater Header Mod.Identification of Snubbers Removed & Relocated During Mod to Header EnclRequest
ML20062C37930 July 1982FirstEnergy
Crouse R
Forwards Application for Amend to License NPF-3,revising Tech Spec Table 3.7-3 to Reflect Steam Generator Auxiliary Feedwater Header Mod.Class III Fee EnclRequest
ML20058J6206 August 1982FirstEnergy
Crouse R
Forwards Addl Info Re Auxiliary Feedwater Header Repair,In Response to NRC 820623 Request.One Oversize Drawing Encl. Aperture Card Is Available in PDROther
ML20062N79816 August 1982FirstEnergy
Crouse R
Forwards Info Re Auxiliary Feedwater Header/Steam Generator Mod,In Response to NRC Questions in .Also Discusses Potential for Crack Propagation in Retired Header. Util Will Propose Changes to Tech Specs within 30 DaysOther
05000287/LER-1982-006, Forwards Updated LER 82-006/01X-2.Detailed Event Analysis Encl27 August 1982Duke Energy
Tucker H
Forwards Updated LER 82-006/01X-2.Detailed Event Analysis EnclOther
ML20065C13716 September 1982FirstEnergy
Crouse R
Advises of Delay in Submittal of Proposed Tech Specs Re Auxiliary Feedwater Header Insps Due to Intensive Resource Requirements to Start Up from Refueling Outage.Submittal Expected by 821029Other
ML20079R10817 June 1983Taylor J
BABCOCK & WILCOX CO.
Part 21 Rept Re Adequacy of Fittings Supplied by Tube-Line Corp Through Capitol Pipe & Steel Products Co for Use on New Auxiliary Feedwater Headers of Steam Generators.Flanges Not heat-treated as Required by Matl SpecsOther