Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20261N102 | 5 June 1981 | BECHTEL GROUP INC. | Piping Isometric:Main Steam System Ctmt Bldg Steam Gen 1-2 | Other |
ML20054G584 | 20 May 1982 | SACRAMENTO MUNICIPAL UTILITY DISTRICT Rodrigues R | Submits Addl Info Re Auxiliary Feedwater Header Mod,Per NRC Request.Existing Headers Have Become Distorted Since Original Fabrication.Headers Will Be Replaced & Stabilized to Prevent Further Unacceptable Damage to Steam Generators | Other |
ML20054H506 | 21 June 1982 | Wells R Consumers Energy | Requests List of Specific New B&W Steam Generator Auxiliary Feedwater Header Design Details Required for NRC Design Review of New Scheme to Supply Auxiliary Feedwater to Steam Generators | Other |
ML20054M365 | 23 June 1982 | FirstEnergy Crouse R | Forwards Public Version of Revision 4 to Emergency Plan, Per 10CFR50 App E.Cover Sheet & Receipt Form Encl | Request |
ML20054J484 | 23 June 1982 | Novak T Office of Nuclear Reactor Regulation | Requests Addl Info Re Auxiliary Feedwater Header Repair, Reported in LER 82-019,Revision 1.Info Needed 10 Days Prior to Scheduled Restart | Other |
ML20062C407 | 30 July 1982 | FirstEnergy | Tech Spec Table 3.7-3 Re safety-related Hydraulic Snubbers. Safety Evaluation for Auxiliary Feedwater Header Replacement Encl | Other |
ML20062C394 | 30 July 1982 | FirstEnergy Murray T Crouse R | Application for Amend to License NPF-3,revising Tech Spec Table 3.7-3 to Reflect Steam Generator Auxiliary Feedwater Header Mod.Identification of Snubbers Removed & Relocated During Mod to Header Encl | Request |
ML20062C379 | 30 July 1982 | FirstEnergy Crouse R | Forwards Application for Amend to License NPF-3,revising Tech Spec Table 3.7-3 to Reflect Steam Generator Auxiliary Feedwater Header Mod.Class III Fee Encl | Request |
ML20058J620 | 6 August 1982 | FirstEnergy Crouse R | Forwards Addl Info Re Auxiliary Feedwater Header Repair,In Response to NRC 820623 Request.One Oversize Drawing Encl. Aperture Card Is Available in PDR | Other |
ML20062N798 | 16 August 1982 | FirstEnergy Crouse R | Forwards Info Re Auxiliary Feedwater Header/Steam Generator Mod,In Response to NRC Questions in .Also Discusses Potential for Crack Propagation in Retired Header. Util Will Propose Changes to Tech Specs within 30 Days | Other |
05000287/LER-1982-006, Forwards Updated LER 82-006/01X-2.Detailed Event Analysis Encl | 27 August 1982 | Duke Energy Tucker H | Forwards Updated LER 82-006/01X-2.Detailed Event Analysis Encl | Other |
ML20065C137 | 16 September 1982 | FirstEnergy Crouse R | Advises of Delay in Submittal of Proposed Tech Specs Re Auxiliary Feedwater Header Insps Due to Intensive Resource Requirements to Start Up from Refueling Outage.Submittal Expected by 821029 | Other |
ML20079R108 | 17 June 1983 | Taylor J BABCOCK & WILCOX CO. | Part 21 Rept Re Adequacy of Fittings Supplied by Tube-Line Corp Through Capitol Pipe & Steel Products Co for Use on New Auxiliary Feedwater Headers of Steam Generators.Flanges Not heat-treated as Required by Matl Specs | Other |