Pages that link to "ML20147H990"
Jump to navigation
Jump to search
The following pages link to ML20147H990:
Displaying 25 items.
- ML17279A675 (← links)
- ML17278A578 (← links)
- ML17278A272 (← links)
- ML17277B771 (← links)
- ML20137J031 (← links)
- ML20128F244 (← links)
- ML20198E856 (← links)
- ML20207J245 (← links)
- TAC:60547 (← links)
- TAC:56947 (← links)
- AECM-85-0180, Requests 10CFR50.73 Exemption for ESF Actuations Occurring from Single Channel Trip Signals,Including Inadvertent Isolations of Reactor Water Cleanup Sys Caused by High Differential Flow Signals or Spurious High Temp Signals (← links)
- GO2-87-258, Withdraws 850220 Request for Exemption from LER Reporting Requirements for Chlorine Monitor Tape Depletion & Spurious High Delta Flow.Exemption No Longer Necessary (← links)
- GO2-87-256, Withdraws Request for Amend to License NPF-21,changing Tech Spec Section 4.6.4.1 Re Surveillance Frequency for Chamber Drywell Vacuum Breaker Operability Demonstration from 31 to 92 Days to Allow Util to Concentrate on Other Requests (← links)
- GO2-87-009, Application for Amend to License NPF-21,modifying Time Period When Reg Guide 1.97,Rev 2 Required to Be Implemented for Suppression Pool Level Monitoring from Prior to Startup Following Second Refueling Outage.Fee Paid (← links)
- ML17278B066 (← links)
- ML17278B064 (← links)
- ML17278B029 (← links)
- ML17278A980 (← links)
- GO2-86-695, Requests Status of NRC Review of Util 850220 Request for Exemption from Reporting ESF Actuations Resulting from Chlorine Monitor Tape Depletion or Spurious RWCU High Delta Flow (← links)
- GO2-86-080, Application for Amend to License NPF-21 Revising Section 4.6.4.1 to Change Surveillance Frequency for Operability Demonstration of Vacuum Breaker Pairs & Position Indicators from 31 to 92 Days.Fee Paid (← links)
- ML17278A449 (← links)
- GO2-85-656, Clarifies Request for Amend to Tech Spec 3/4.6.4 Re Suppression chamber-drywell Vacuum Breakers.Analysis on Opening Time Response Completed.Tech Spec Changes Not Effected.Amend Request Should Be Processed (← links)
- GO2-85-278, Application for Amend to License NPF-21,changing Tech Spec Surveillance Requirement to Demonstrate Operability of Suppression Chamber Drywell Vacuum Breaker Pairs from Once Per 31 Days to Once Per 92 Days.Fee Paid (← links)
- GO2-85-163, Forwards Remittance of Application Fee for 850220 LER Exemption Request,Per 850313 Request (← links)
- GO2-85-093, Requests Exemption from Reporting Future ESF Actuations Resulting from Chlorine Monitor Tape Depletion or Spurious Reactor Water Cleanup High Delta Flow,Per 10CFR50.73(f). Justification for Exemption Provided (← links)