MONTHYEARML17278A5781986-01-17017 January 1986 Proposed Tech Spec,Revising Section 4.6.H.1 Re Surveillance Requirements.Frequency of Operability Demonstration Changed from 31 to 92 Days by Cycling Each Vacuum Breaker & Verifying Valves in Closed Position Project stage: Other GO2-86-080, Application for Amend to License NPF-21 Revising Section 4.6.4.1 to Change Surveillance Frequency for Operability Demonstration of Vacuum Breaker Pairs & Position Indicators from 31 to 92 Days.Fee Paid1986-01-17017 January 1986 Application for Amend to License NPF-21 Revising Section 4.6.4.1 to Change Surveillance Frequency for Operability Demonstration of Vacuum Breaker Pairs & Position Indicators from 31 to 92 Days.Fee Paid Project stage: Request ML20207J2451986-07-16016 July 1986 Forwards Request for Addl Info Re Util Application to Amend Tech Spec 4.6.4.1 Concerning Drywell Vacuum Breakers,For Transmittal to Licensee.Receipt of Info After 860731 Will Require Rev to 860831 Anticipated Review Completion Date Project stage: RAI ML17278A9801986-08-26026 August 1986 Forwards Request for Addl Info Re Proposed Rev to Tech Spec 4.6.4.1,addressing Suppression Chamber - Drywell Vacuum Breakers (3/4.6.4).Response Requested within 45 Days of Ltr Receipt Project stage: RAI ML17279A6751987-02-0909 February 1987 Offers No Comments on Util 860117 Application for Amend to License NPF-21,changing Surveillance Frequency for Operability of Vacuum Breaker Pairs & Position Indicators from 31 to 92 Days Project stage: Request GO2-87-256, Withdraws Request for Amend to License NPF-21,changing Tech Spec Section 4.6.4.1 Re Surveillance Frequency for Chamber Drywell Vacuum Breaker Operability Demonstration from 31 to 92 Days to Allow Util to Concentrate on Other Requests1987-10-0202 October 1987 Withdraws Request for Amend to License NPF-21,changing Tech Spec Section 4.6.4.1 Re Surveillance Frequency for Chamber Drywell Vacuum Breaker Operability Demonstration from 31 to 92 Days to Allow Util to Concentrate on Other Requests Project stage: Request ML20147H9901988-03-0202 March 1988 Informs of Termination of Action on Three Util License Amend Applications,Per Util 871006,02 & 0615 Requests Project stage: Other 1986-08-26
[Table View] |
Proposed Tech Spec,Revising Section 4.6.H.1 Re Surveillance Requirements.Frequency of Operability Demonstration Changed from 31 to 92 Days by Cycling Each Vacuum Breaker & Verifying Valves in Closed Position| ML17278A578 |
| Person / Time |
|---|
| Site: |
Columbia  |
|---|
| Issue date: |
01/17/1986 |
|---|
| From: |
WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
|---|
| To: |
|
|---|
| Shared Package |
|---|
| ML17278A577 |
List: |
|---|
| References |
|---|
| TAC-60547, NUDOCS 8601270231 |
| Download: ML17278A578 (2) |
|
Text
COHTAIHiIEHT SYSTEMS SURVEILLAHCE REOUI REPEHTS 4.6.4el sas Each suppression chamber " drywell 'vacuum breaker shall be:
Yerffied closed at least once per 7 days(PPpesAli',Dt.pss pp'P<itoAsii l+y)'emonstrated OPERABLE:
fldgg PtY SPacikcabiast l.
At least once per
%rig Vtrf(g(re aettts Vallvd. 4 be 2.
At least once per ~days by verifying both posstio%
5 ~
P
'LVl 94/,
Q tllagnA
'ndicators OPERABLE by observing expected valve movement
~ during. the cycling tes v
3.
At least once per 18 months by; r
a)
Verifying the opening setpoint, from the closed position, to be less than or',equal to Oe5 psid, and c
b)
Verifying both position indicators OPERABLE by performance
~4NCVlOQ+C.
t KG+
cy rr R
WDbl~loNAL MANCqE FROM 'THA'7 SNB hn>77Kb lN Cga'-es-s la (Q~. Q)