ML17278A578

From kanterella
Jump to navigation Jump to search

Proposed Tech Spec,Revising Section 4.6.H.1 Re Surveillance Requirements.Frequency of Operability Demonstration Changed from 31 to 92 Days by Cycling Each Vacuum Breaker & Verifying Valves in Closed Position
ML17278A578
Person / Time
Site: Columbia 
Issue date: 01/17/1986
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17278A577 List:
References
TAC-60547, NUDOCS 8601270231
Download: ML17278A578 (2)


Text

COHTAIHiIEHT SYSTEMS SURVEILLAHCE REOUI REPEHTS 4.6.4el sas Each suppression chamber " drywell 'vacuum breaker shall be:

Yerffied closed at least once per 7 days(PPpesAli',Dt.pss pp'P<itoAsii l+y)'emonstrated OPERABLE:

fldgg PtY SPacikcabiast l.

At least once per

%rig Vtrf(g(re aettts Vallvd. 4 be 2.

At least once per ~days by verifying both posstio%

5 ~

P

'LVl 94/,

Q tllagnA

'ndicators OPERABLE by observing expected valve movement

~ during. the cycling tes v

3.

At least once per 18 months by; r

a)

Verifying the opening setpoint, from the closed position, to be less than or',equal to Oe5 psid, and c

b)

Verifying both position indicators OPERABLE by performance

~4NCVlOQ+C.

t KG+

cy rr R

WDbl~loNAL MANCqE FROM 'THA'7 SNB hn>77Kb lN Cga'-es-s la (Q~. Q)

SbOi27023i SbDii7I I

P c

MASHIHGTON HUCLEAR " UHIT 2 3l4 6"34

~

~

P V

E<

II