Pages that link to "Corlett D"
Jump to navigation
Jump to search
The following pages link to Corlett D:
Displayed 50 items.
- ML15114A203 (← links)
- ML11123A259 (← links)
- ML110590620 (← links)
- ML110590577 (← links)
- ML110530084 (← links)
- ML081710131 (← links)
- ML080460093 (← links)
- HNP-06-067, HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants. April 2007 FAQ Emails (← links)
- HNP-07-001, Comment (2) of D. H. Corlett on Behalf of Progress Energy Regarding Draft Regulatory Guide DG-1134, Inservice Inspection Code Case Acceptability (← links)
- HNP-06-081, Submittal of Inservice Inspection Summary Report for Harris Nuclear Plant (← links)
- HNP-13-083, Submittal of Summaries of 10 CFR 50.54(q) Evaluations (← links)
- HNP-13-050, Annual Report of Changes Pursuant to 10 CFR 50.46 for May 23, 2012 Through April 23, 2013 (← links)
- HNP-13-058, Relief Request 13R-11 Response to Request for Additional Information (← links)
- HNP-13-057, Relief Request I3R-11 Reactor Vessel Closure Head Nozzles Lnservice Inspection Program - Third Interval (← links)
- HNP-13-046, Report of Changes Pursuant to 10 CFR 50.59 (← links)
- HNP-13-039, Annual Environmental (Non-Radiological) Operating Report, January 1, 2012 Through December 31, 2012, Appendix B (← links)
- HNP-12-139, Evacuation Time Estimate Analysis (← links)
- HNP-12-133, Relief Request I3R-10 Spent Fuel Pool Cooling Piping, Request for Additional Information Response (← links)
- HNP-12-099, Relief Request I3R-10 Spent Fuel Pool Cooling Piping Inservice Inspection Program - Third Interval (← links)
- HNP-12-094, Cycle 18 Startup Test Report (← links)
- HNP-12-060, Relief Request I3R-09 Reactor Vessel Closure Head Nozzle Repairs Inservice Inspection Program - Third Interval, Request for Additional Information Response (← links)
- HNP-12-061, Cycle 18 Core Operating Limits Report, Revision 0 (← links)
- HNP-12-054, Relief Request I3R-09 Reactor Vessel Closure Head Nozzles Inservice Inspection Program - Third Interval (← links)
- HNP-12-015, Submittal of Cycle 17 Core Operating Limits Report, Revision 1 (← links)
- HNP-11-089, Response to Request for Clarification Regarding 180-day Steam Generator Tube Inspection Report (← links)
- HNP-11-034, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule (← links)
- HNP-11-045, 180-Day Steam Generator Tube Inspection Report (← links)
- HNP-10-059, Request for Approval of Proposed Alternative I3R-07 in Accordance with 10 CFR 50.55a(a)(3)(i) for the Third Ten-Year Interval Inservice Interval (← links)
- HNP-10-039, Submittal of Cycle 16 Core Operating Limits Report, Revision 1 (← links)
- HNP-10-005, Response to Request for Clarifications Regarding Relief Request 2R1-018 (← links)
- HNP-09-095, Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program (← links)
- HNP-12-027, Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5(tm) Cladding Implementation Schedule (← links)
- HNP-09-076, 90-Day Inservice Inspection (ISI) Summary Report (← links)
- HNP-09-056, Non-Security Sensitive Version of Original Request for License Amendment to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (← links)
- HNP-09-049, Submittal of Cycle 16 Core Operating Limits Report (← links)
- HNP-09-044, Submittal of Cycle 15 Core Operating Limits Report - Revision 1 (← links)
- HNP-08-045, Second Ten-Year Interval Inservice Inspection Program-Final Documentation Including Requests for Relief in Accordance with 10 CFR 50.55a (← links)
- HNP-08-119, Non-Security Sensitive Version of Supplement to Request for License Amendment to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001) Edition (← links)
- HNP-08-134, Response to Request for Additional Information Regarding Relief Request 13R-02 for the Third 10-Year Inservice Inspection Interval (← links)
- HNP-08-067, Supplement to Third Interval Inservice Inspection Relief Request 13R-02 Submittal (← links)
- HNP-08-038, Transmittal of Third Interval Inservice Inspection Program (← links)
- HNP-07-179, 90-Day Inservice Inspection (ISI) Summary Report (← links)
- HNP-07-160, 60-Day Response to NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (← links)
- HNP-07-142, Cycle 15 Core Operating Limits Report (← links)
- L-80-030, Request for Technical Assistance, Resolution of the Impact of Air Handler Unavailability on Technical Specification Equipment Based on Interpretation of GL 80-30 Dated April 10, 1980 and NRC Letter to Perry, Dated April 05, 2002 (← links)
- HNP-07-128, Response to Request for Additional Information (RAI) Regarding the Spring 2006 Refueling Outage 13 Steam Generator Tube Inspections (← links)
- HNP-07-127, Correction to Technical Specification Page in Amendment 125 (← links)
- HNP-07-092, Cycle 14 Core Operating Limits Report, Revision 1 (← links)
- HNP-07-073, Withdrawal of the Relief Request from ASME Code Inservice Testing Requirements for the Second 10-Year Interval (← links)
- HNP-07-042, Revision of the Relief Request from ASME OM Code Inservice Testing Requirements for the Third Ten-Year Interval Plan (← links)