Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18031A824 + (Updated Table of NRC Representatives on ASME B&PV Code, Section III, Division 1 and Division 5 Committees)
- ML20100K346 + (Updated Tables 1A,1C & 2B to Effluent & Waste Disposal Semiannual Rept, for Jan-June 1984)
- ML20077G990 + (Updated Tables 1A,1C,2A & 2B Re Gaseous & Liquid Effluents to Semiannual Effluent Release Rept for Second Half 1990)
- ML20235J158 + (Updated Tables 1A,1C,2A & 2B of Calvert Cliffs Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept:First Half 1987)
- ML20214W527 + (Updated Tables 1A,1C,2A & 2B to Semiannual Effluent Release Rept for Second Half 1985)
- ML20058B907 + (Updated Tables 1C,2A,2B & Page 4 to Semiannual Effluent Release Rept for First Half 1990)
- ML20042F012 + (Updated Tables 1C,2A,2B,3A & Page 7 of Semiannual Effluent Release Release Rept for Second Half of 1989)
- PLA-7309, Updated Talen Energy Corp. Director Information Application for Approval of Indirect Transfer of Control + (Updated Talen Energy Corp. Director Information Application for Approval of Indirect Transfer of Control)
- PLA-7316, Updated Talen Energy Corporation Officer Information Application for Approval of Indirect Transfer of Control + (Updated Talen Energy Corporation Officer Information Application for Approval of Indirect Transfer of Control)
- ML14191B148 + (Updated Talking Points for July 17th Meeting with Exelon Regarding Braidwood and Byron AFW Cross-tie Amendment)
- ML19344E374 + (Updated Tech Spec Change Request 91,replacing 800814 Submittal.Consists of Proposed Revision to Tech Specs, Section 6 of App a & Section 5 of App B Re New Mgt Organization)
- ML18153C398 + (Updated Tech Spec Page 6.1-2 to Be Inserted in Place of Previously Submitted Page)
- ML091170368 + (Updated Tech Spec Pages, from Licensee, License Amendment Request Lic 08-0078, Administrative Revisions to the Technical Specifications to Correct Typographical Errors and Provide Clarification)
- ML20058N173 + (Updated Tech Specs Permitting Removal of Rod Sequence Control Sys & Reducing Rod Worth Minimizer Cutoff Setpoints to 10%-rated Thermal Power)
- NG-08-0312, Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications + (Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications)
- ML13316A007 + (Updated Technical Specifications Manual and Bases)
- ML12321A321 + (Updated Technical Specifications and Response to RAI 3 for the Nuclear Science Center Reactor)
- ML19269B706 + (Updated Technical Specifications for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor)
- ML19269B705 + (Updated Technical Specifications for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor)
- ML20033B539 + (Updated Testimony Re Impact of ECCS Analysis of Current NRC Position on Fuel Cladding Swelling & Rupture.Prof Qualifications Encl)
- ML20033B506 + (Updated Testimony Re Turbine Missiles.Nrc Estimated Turbine Exit Speed Was Too Low.Revised Values Do Not Change NRC Conclusions Re Turbine Missile Risks for Floating Nuclear Plant Design.Prof Qualifications Encl)
- ML20091L113 + (Updated Testimony of Cv Failla on Behalf of State of Ny Re Contention 24.F.2.Certificate of Svc Encl.Related Correspondence)
- ML20010C377 + (Updated Testimony of Gw Oprea,Jh Goldberg,Ri Moles & RA Fraza & W/Jg Dewease Testimony Added.Describes Until Mgt Organization & Plans for Operation of Facility.Related Correspondence)
- ML20050B908 + (Updated Testimony of LP Crocker Re Proposed Mgt Organization for Operations & of LP Crocker & GL Madsen Re Qualifications of Bechtel Power Corp & Ebasco Svcs,Inc.Prof Qualifications Encl)
- ML17333A289 + (Updated Thermal-Hydraulic Analysis of Spent Nuclear Fuel Pool DC Cook Nuclear Plant Indiana Michigan Power Co)
- ML20082B890 + (Updated Title Page to Inservice Insp Program.Part a: Piping Sys)
- ML20113C438 + (Updated Trac Analysis of 80% Double-Ended Cold-Leg Break for AP600)
- ML20057F163 + (Updated Trojan Nuclear Div Manual)
- ML20261H388 + (Updated UC Davis MNRC Reactor Proposed License Renewal Ipac Trust Resources Report)
- ML061800302 + (Updated UFSAR Supplement Information Supporting the Plant License Renewal Application)
- ML18151A435 + (Updated VEP-1-5A Operational QA Program Tr)
- ML20079C939 + (Updated VEP-1-5A, Operational QA Program Topical Rept)
- ML20078A540 + (Updated Vogtle Electric Generating Plant Unit 2 Readiness Review Module 3A Initial Test Program - Preoperational Test Phase)
- ML18038A067 + (Updated Vol 1 of Preservice Insp Plan. Eleven Oversize Sketches Encl)
- ML19312A246 + (Updated Work Plan for FAST/CR-III Fuel Vaporization & Transport Experiments)
- ML20211F344 + (Updated non-proprietary Page 2-4 of TR DPC-NE-2009)
- ML20245D324 + (Updated, Effluent & Waste Disposal Semiannual Rept,First Half 1988)
- ML20245D327 + (Updated, Effluent & Waste Disposal Semiannual Rept,Second Half 1988)
- ML041490065 + (Updated/Revised Hot List)
- ML041490063 + (Updated/Revised Hot List)
- ML041490060 + (Updated/Revised Hot List)
- ML041490059 + (Updated/Revised Hot List)
- ML041490054 + (Updated/Revised Hot List)
- ML100210904 + (Updated/Supplemental Information Concerning the Notices of Appearance of TVA Counsel Martin J.Oneill, Kathryn M. Sutton, and Lawrence J. Chandler)
- MN 12-013, Updated: 4/26/2012 - Seabrook Notice of Public Meeting No. 12-013 with NextEra Energy Seabrook, LLC + (Updated: 4/26/2012 - Seabrook Notice of Public Meeting No. 12-013 with NextEra Energy Seabrook, LLC)
- PMNS20180475, Updated: Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works + (Updated: Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works)
- PMNS20180473, Updated: Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works + (Updated: Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works)
- ML17338A542 + (Updates & Clarifies Commitment to Implement Operational QA Program.Questions Status of Reg Guide & Industry Standards Re QA Program)
- ML20054J150 + (Updates & Clarifies Info Previously Submitted Re IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety- Related Sys. Annual Maint/Testing Program Set Up. Coils in Nbfd Relays Will Be Replaced)
- ML20237H338 + (Updates & Clarifies Info Provided in 870313 Submittal Re SPDS Isolation Device Reactor Coolant Pump Power Monitors. Computer Multiplexer Provides 120 Db of Isolation Between Inputs for 140-volt Ac Input Vault.Sketch Encl)
- PY-CEI-NRR-0339, Updates & Clarifies Info in Chapter 13 of FSAR Re Plant Organization.Revised Encl FSAR Pages Will Be Included in Future Amend + (Updates & Clarifies Info in Chapter 13 of FSAR Re Plant Organization.Revised Encl FSAR Pages Will Be Included in Future Amend)