Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Updated Rev 5 to Operational QA Program". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML12045A255  + (Updated Revision to Nine Mile Point, Units 1 & 2 - Emergency Action Levels, Attachments 4 and 5)
  • GNRO-2003/00002, Updated Risk Metrics for Extending the Emergency Diesel Generator Allowed Outage Time  + (Updated Risk Metrics for Extending the Emergency Diesel Generator Allowed Outage Time)
  • ML20058J334  + (Updated Ro:Liquid Radwaste Treatment Sys Inoperable for More than 31 Days After 820308.New Limiting Condition of Operation Procedure Issued on 820720.Minor Adjustments Made & Sys Rendered Operable on 820726)
  • ML20090D635  + (Updated Ro:On 711231,unit Tripped Offline as Result of Surveillance Testing.Sensor Support Accidentally Bumped Causing High Level Trip Sensor to Operate Resulting in Turbine Trip.Operator Given Review of Sys Response)
  • ML20076D702  + (Updated SAR Change Pages for RAIs NP-7-2 and NP-A-2)
  • ML20045H021  + (Updated SAR for 1993 for Fort Calhoun Station)
  • ML20107K687  + (Updated SAR for Univ of Lowell Research Reactor)
  • ML20092M289  + (Updated SAR in Support of License R-123 Renewal)
  • PNP 2012-009, Updated SDP Assessment of DC Panel D11-2 Fault  + (Updated SDP Assessment of DC Panel D11-2 Fault)
  • ML16279A517  + (Updated SER Containment Leak Rate to ACRS)
  • ML19319C524  + (Updated SER Input from Accident Analysis Branch Re Turbine & Tornado Missiles protection.Safety-related Sys Protected by Adequate Structural Barriers.Addl Info Required Re Facility Inherent Protection Against Tornado Missiles)
  • ML19329B483  + (Updated SER Re Operations Phase QA Program.Program Adequate)
  • ML20248B898  + (Updated SG Run Time Analysis Cycle 9)
  • ML18155A467  + (Updated Safety Analysis Report (UFSAR) Revision 35, Appendix L, Requirements of Renewed Operating Licenses)
  • ML18155A450  + (Updated Safety Analysis Report (USAR) Revision 35, Section 6, Engineered Safety Features)
  • ML18166A209  + (Updated Safety Analysis Report (USAR) Revision 35, Appendix G, Containment System Evaluation)
  • ML18155A465  + (Updated Safety Analysis Report (USAR) Revision 35, Appendix J, Pre-Operational and Startup Tests)
  • ML18155A466  + (Updated Safety Analysis Report (USAR) Revision 35, Appendix K, Containment Pressure Response to LOCA)
  • ML18155A445  + (Updated Safety Analysis Report (USAR) Revision 35, Section 1, Introduction and Summary Description)
  • ML18155A446  + (Updated Safety Analysis Report (USAR) Revision 35, Section 2, Site and Environs)
  • ML18155A455  + (Updated Safety Analysis Report (USAR) Revision 35, Section 11, Plant Power Conversion System)
  • ML18155A457  + (Updated Safety Analysis Report (USAR) Revision 35, Section 13, Plant Operations)
  • ML18155A449  + (Updated Safety Analysis Report (USAR) Revision 35, Section 5, Containment System)
  • ML18155A454  + (Updated Safety Analysis Report (USAR) Revision 35, Section 10, Plant Auxiliary Systems)
  • ML18166A204  + (Updated Safety Analysis Report (USAR) Revision 35, Section 14, Safety Analysis)