Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML21102A356 + (Update to Final Safety Analysis Report, Appendix a, Station Blackout (SBO))
- ML21102A336 + (Update to Final Safety Analysis Report, Chapter 8, Introduction to the Electrical Distribution Systems)
- ML21102A348 + (Update to Final Safety Analysis Report, Chapter 7, Instrumentation and Control)
- ML21102A346 + (Update to Final Safety Analysis Report, Chapter 15, Aging Management Programs and Time Limited Aging Analysis)
- ML21102A352 + (Update to Final Safety Analysis Report, Appendix B)
- ML21102A347 + (Update to Final Safety Analysis Report, Chapter 12, General)
- ML21102A354 + (Update to Final Safety Analysis Report, Chapter 14, Safety Analysis)
- NRC-2021-0009, Update to Final Safety Analysis Report, Chapter 2, Site and Environment + (Update to Final Safety Analysis Report, Chapter 2, Site and Environment)
- ML21102A344 + (Update to Final Safety Analysis Report, Chapter 3, Design Basis)
- ML21102A339 + (Update to Final Safety Analysis Report, Chapter 4, Design Basis)
- ML21102A345 + (Update to Final Safety Analysis Report, List of Effective Pages)
- ML21102A343 + (Update to Final Safety Analysis Report, Chapter 1, Introduction and Summary)
- ML21102A349 + (Update to Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems)
- ML21102A338 + (Update to Final Safety Analysis Report, Chapter 11, Waste Disposal Systems and Radiation Protection)
- ML21102A357 + (Update to Final Safety Analysis Report, Appendix T, Technical Requirements Manual)
- WBL-22-015, Update to Fire Protection Report + (Update to Fire Protection Report)
- WBL-23-042, Update to Fire Protection Report + (Update to Fire Protection Report)
- WBL-22-034, Update to Fire Protection Report Figures Redacted + (Update to Fire Protection Report Figures Redacted)
- ML25162A075 + (Update to Fire Protection Report, Revision 40)
- ML101060265 + (Update to Generic Letter 2008-01 Commitment, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML12023A049 + (Update to Generic Letter 2008-01 Commitment)
- LG-14-033, Update to Generic Ltr 2008-01 Commitment + (Update to Generic Ltr 2008-01 Commitment)
- ML062000369 + (Update to IP3 Technical Specifications Bases)
- ML061640093 + (Update to Independent Assessment Plan for Davis-Besse Operations Performance - Year 2006)
- ML032731420 + (Update to Individual Plant Examination of External Events Submittal Reports)
- B18694, Update to Information Regarding Change to Fire Protection Program + (Update to Information Regarding Change to Fire Protection Program)
- BVY 12-057, Update to Information Related to 10 CFR 50.63 Licensing Basis + (Update to Information Related to 10 CFR 50.63 Licensing Basis)
- BVY 06-087, Update to Information Related to 10CFR50.63 Licensing Basis + (Update to Information Related to 10CFR50.63 Licensing Basis)
- RS-03-166, Update to Information Supporting License Amendment Request to Permit Uprated Power Operation at Dresden, Units 2 & 3 and Quad Cities, Units 1 & 2 + (Update to Information Supporting License Amendment Request to Permit Uprated Power Operation at Dresden, Units 2 & 3 and Quad Cities, Units 1 & 2)
- ML20197B326 + (Update to Interim Deficiency Rept DER 86-20 Re Damper Seals Not Meeting Required Specs.Initially Reported on 860603. Evaluation of Root Cause Continuing.Complete Evaluation & Final Rept Forecast for 861113)
- ML20009G342 + (Update to Interim Deficiency Rept for Significant Const Deficiency 27 Re Switchgear Breaker Position Switch Operator Defect.Receipt of GE Instructions on Repair Methods Anticipated by 810731.Final Rept by 810831)
- ML20057A741 + (Update to Interim Part 21 Rept 93-002 Re ECCS Recirculation Phase Design Issues.Initially Reported on 930512. Westinghouse Still in Process of Evaluating Issue W/Regard to Effect of DGs Operating at TS Lower Limit Speed)
- ML14169A030 + (Update to Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62)
- ML13059A028 + (Update to Irradiated Fuel Management Plan)
- ML14119A120 + (Update to Irradiated Fuel Management Plan Pursuant to CFR 50.54(bb))
- BVY 14-085, Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) + (Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb))
- 3F1213-01, Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) + (Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb))
- PLA-7267, Update to July 11 Request for Order Approving Indirect Transfer of Control + (Update to July 11 Request for Order Approving Indirect Transfer of Control)
- 05000313/LER-1978-005, Update to LER 78-005/01x-1:on 780302,during Inservice Insp of Tubing,Five Tubes Exceeded Plugging Limit of 40% of Nominal Tube Wall Thickness.Caused by Oxiding Aqueous Corrosion Mechanism.Defective Tubes Plugged + (Update to LER 78-005/01x-1:on 780302,during Inservice Insp of Tubing,Five Tubes Exceeded Plugging Limit of 40% of Nominal Tube Wall Thickness.Caused by Oxiding Aqueous Corrosion Mechanism.Defective Tubes Plugged)
- 05000313/LER-1978-006, Update to LER 78-006/01x-1:on 780305,during Reinstallation of Primary Manway Cover,Two of 16 Studs Sheared Off at Base of Nut on Second Torque Sequence Pass.Caused by 90% Crack in Diameter on One Stud + (Update to LER 78-006/01x-1:on 780305,during Reinstallation of Primary Manway Cover,Two of 16 Studs Sheared Off at Base of Nut on Second Torque Sequence Pass.Caused by 90% Crack in Diameter on One Stud)
- 05000251/LER-1978-008, Update to LER 78-008/01X-1 on 780828:restricting Orifices Not Installed in Branch Connections from Containment Spray Headers to Emergency Containment Filter Spray Sys.Caused by Inadvertent Omission.Qc/Qa Program Initiated + (Update to LER 78-008/01X-1 on 780828:restricting Orifices Not Installed in Branch Connections from Containment Spray Headers to Emergency Containment Filter Spray Sys.Caused by Inadvertent Omission.Qc/Qa Program Initiated)
- 05000280/LER-1978-034, Update to LER 78-034/01X-2 on 781101:17 Spare Process Piping Containment Penetrations Were Not Capped.Condition Has Been Overlooked Since Const.Design Change Approved to Weld Caps on Open Ends + (Update to LER 78-034/01X-2 on 781101:17 Spare Process Piping Containment Penetrations Were Not Capped.Condition Has Been Overlooked Since Const.Design Change Approved to Weld Caps on Open Ends)
- 05000250/LER-1979-002, Update to LER 79-002/03X-1 on 790226:during Refueling Shutdown,Crack Found in Weld on Drain Line in B Accumulator Discharge Piping.Caused by Stress Due to Line Vibration. Elbows & Welds Replaced + (Update to LER 79-002/03X-1 on 790226:during Refueling Shutdown,Crack Found in Weld on Drain Line in B Accumulator Discharge Piping.Caused by Stress Due to Line Vibration. Elbows & Welds Replaced)
- 05000280/LER-1979-004, Update to LER 79-004/01X-2:on 790309,A/E Notified Util of Possible Nonconservatisms in Pipe Stress Code Used to Analyze Piping Sys & of Innaccurate Valve Weights Used by Error in Pipe Stress Analysis & Valve Weight + (Update to LER 79-004/01X-2:on 790309,A/E Notified Util of Possible Nonconservatisms in Pipe Stress Code Used to Analyze Piping Sys & of Innaccurate Valve Weights Used by Error in Pipe Stress Analysis & Valve Weight)
- 05000259/LER-1979-013, Update to LER 79-013/01X-2:on 790723,discovered 163 Deviations in 2,151 Expansion Anchors Inspected.Caused by Rebar Interference,Shortbolts & Improperly Seated Anchors. Program to Correct Anchors Ongoing W/Insp Effort + (Update to LER 79-013/01X-2:on 790723,discovered 163 Deviations in 2,151 Expansion Anchors Inspected.Caused by Rebar Interference,Shortbolts & Improperly Seated Anchors. Program to Correct Anchors Ongoing W/Insp Effort)
- 05000155/LER-1979-027, Update to LER 79-027/03X-1:on 791115,through Seat Leakage Occurred at Outlet Valve M07053 of Loop 2.Cause Not Determined by Vendor Investigation.Valve Packing Replaced & Valve Stem Gearing Lubricated + (Update to LER 79-027/03X-1:on 791115,through Seat Leakage Occurred at Outlet Valve M07053 of Loop 2.Cause Not Determined by Vendor Investigation.Valve Packing Replaced & Valve Stem Gearing Lubricated)
- ML19297C414 + (Update to LIC-500, Topical Report Process Public Workshop on Topical Report Transformation Process)
- LIC-14-0141, Update to License Amendment Request (LAR) 14-10; One-Time Extension of Technical Specification Surveillance Requirements + (Update to License Amendment Request (LAR) 14-10; One-Time Extension of Technical Specification Surveillance Requirements)
- NG-12-0107, Update to License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.5 (TAC ME7337 & ME7336) + (Update to License Amendment Request (TSCR-129): Application for Technical Specification Change Regarding Alternative Testing of Safety/Relief Valves Sections Affected: 3.4.3, 3.5.1, and 3.6.1.5 (TAC ME7337 & ME7336))
- CNL-15-074, Update to License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants + (Update to License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants)
- CNL-15-191, Update to License Amendment Request to Adopt NFPA 805 Performance- Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 (TAC Nos. MF1185, MF1186, and M + (Update to License Amendment Request to Adopt NFPA 805 Performance- Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 (TAC Nos. MF1185, MF1186, and MF1)