Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML23217A001 + (U.S. Nuclear Regulatory Commission Export Import of Nuclear Equipment and Material)
- ML24353A345 + (U.S. Nuclear Regulatory Commission Feedback on White Papers Related to the Determination of T0 for H.B. Robinson Unit 2, Heat Number W5214)
- EPID:L-2024-RNW-0016 + (U.S. Nuclear Regulatory Commission Feedback on White Papers Related to the Determination of T0 for H.B. Robinson Unit 2, Heat Number W5214)
- ML24353A347 + (U.S. Nuclear Regulatory Commission Feedback on White Papers Related to the Determination of T0 for H.B. Robinson Unit 2, Heat Number W5214)
- ML23114A051 + (U.S. Nuclear Regulatory Commission Feedback Regarding NuScale White Paper: Carbon Free Power Project Decommissioning Cost Estimate Methodology (EPID L-202-LRO-0056))
- ML23272A192 + (U.S. Nuclear Regulatory Commission Feedback Regarding SMR, LLC (a Holtec International Company) White Paper on Human Factors Engineering Functional Requirements Analysis and Function Allocation for Chemical and Volume Control System)
- ML23272A191 + (U.S. Nuclear Regulatory Commission Feedback Regarding SMR, LLC (a Holtec International Company) White Paper on Human Factors Engineering Functional Requirements Analysis and Function Allocation for Chemical and Volume Control System)
- ML20205L415 + (U.S. Nuclear Regulatory Commission Final Safety Evaluation for Oklo, Inc. Topical Report Oklo-2019-14-NP, Revision 1, Quality Assurance Program Description - Design and Construction,)
- ML18005A340 + (U.S. Nuclear Regulatory Commission Fitara Actions and Milestones Table)
- ML21312A077 + (U.S. Nuclear Regulatory Commission Follow Up on the Process for Ongoing Assessment of Natural Hazards Information)
- ML25317A076 + (U.S. Nuclear Regulatory Commission Form 896, -A Topical Report Verification, for EPRI Report 3002033918, Risk-informed High Energy Line Break Evaluation Requirements)
- ML23111A090 + (U.S. Nuclear Regulatory Commission Form 897 Topical Report Withholding Determination for Westinghouse Electric Company Topical Report WCAP-18546-P/NP-A, Westinghouse Axiom Cladding for Use in Pressurized Water Reactor Fuel)
- ML23111A096 + (U.S. Nuclear Regulatory Commission Form 896 - a Topical Report Verification for Westinghouse Electric Company Topical Report WCAP-18546-P/NP-A, Westinghouse Axiom Cladding for Use in Pressurized Water Reactor Fuel)
- ML26037A235 + (U.S. Nuclear Regulatory Commission Form 897 Withholding Determination for Westinghouse Electric Company Topical Report WCAP-18850-P/NP-A)
- ML20245F820 + (U.S. Nuclear Regulatory Commission Functional Organization Charts.July 1, 1989)
- ML20035C200 + (U.S. Nuclear Regulatory Commission Functional Organization Charts.March 15, 1993)
- ML20034C711 + (U.S. Nuclear Regulatory Commission Functional Organization Charts.April 1, 1990)
- ML20064B074 + (U.S. Nuclear Regulatory Commission Functional Organization Charts.August 15, 1990)
- ML20094Q904 + (U.S. Nuclear Regulatory Commission Functional Organization Charts.January 31, 1992)
- ML20137M418 + (U.S. Nuclear Regulatory Commission Functional Organization Charts)
- ML20148T178 + (U.S. Nuclear Regulatory Commission Functional Organization Charts)
- ML20211F089 + (U.S. Nuclear Regulatory Commission Functional Organization Charts)
- ML20069B644 + (U.S. Nuclear Regulatory Commission Functional Organization Charts)
- ML20079Q057 + (U.S. Nuclear Regulatory Commission Functional Organization Charts)
- ML20113A115 + (U.S. Nuclear Regulatory Commission Functional Organization Charts)
- ML20070U234 + (U.S. Nuclear Regulatory Commission Functional Organization Charts)
- ML20203N031 + (U.S. Nuclear Regulatory Commission Human Factors Program Plan)
- ML20024E689 + (U.S. Nuclear Regulatory Commission Human Factors Program Plan)
- ML20098D997 + (U.S. Nuclear Regulatory Commission Human Factors Program Plan)
- ML21116A155 + (U.S. Nuclear Regulatory Commission Human Reliability Methods - Ltr - 21-0109-1)
- PMNS20240675, U.S. Nuclear Regulatory Commission Hybrid Public Meeting on the Licence Termination Plan for the Vallecitos Boiling Water Reactor + (U.S. Nuclear Regulatory Commission Hybrid Public Meeting on the Licence Termination Plan for the Vallecitos Boiling Water Reactor)
- PMNS20241401, U.S. Nuclear Regulatory Commission Hybrid Public Outreach Meeting on the Potential Palisades Nuclear Plant Restart + (U.S. Nuclear Regulatory Commission Hybrid Public Outreach Meeting on the Potential Palisades Nuclear Plant Restart)
- PMNS20250463, U.S. Nuclear Regulatory Commission Hybrid Public Outreach Meeting on the Potential Palisades Nuclear Plant Restart + (U.S. Nuclear Regulatory Commission Hybrid Public Outreach Meeting on the Potential Palisades Nuclear Plant Restart)
- ML20013F322 + (U.S. Nuclear Regulatory Commission Inspection Report 70-1151/2019-401 and Notice of Violation)
- ML021610348 + (U.S. Nuclear Regulatory Commission Inspection Manual (IMC 2602, Decommissioning Inspection Program for Fuel Cycle Facilities and Materials Licensees))
- IR 05000259/2018440 + (U.S. Nuclear Regulatory Commission Inspection Procedure 95001 Supplemental Inspection Report 05000259/2018440, 05000260/2018440 and 05000296/2018440 and Closed Regulatory Performance Meeting)
- IR 05000333/2011201 + (U.S. Nuclear Regulatory Commission Inspection Report Number 05000333-11-201 Cover Letter)
- ML20335A265 + (U.S. Nuclear Regulatory Commission Inspection Report 07001151/ 2020402)
- ML18355A578 + (U.S. Nuclear Regulatory Commission Inspection Report 701151/2018401)
- ML19100A136 + (U.S. Nuclear Regulatory Commission Inspection Report No. 70-27/2019-401)
- ML23195A038 + (U.S. Nuclear Regulatory Commission Inspection Report No. 72-1014/2023-201)
- IR 05000424/2016406 + (U.S. Nuclear Regulatory Commission Inspection Procedure 95001 Supplemental Inspection Report 05000424/2016406 and 05000425/2016406 and Closed Regulatory Performance Meeting - OUO Removed)
- ML22063B165 + (U.S. Nuclear Regulatory Commission Inspection Report No. 721004/2022201 and 07201042/2022201)
- ML20045A516 + (U.S. Nuclear Regulatory Commission Intern Graduation Ceremony for the Class of 1993)
- ML20149G537 + (U.S. Nuclear Regulatory Commission Intern Graduation Ceremony for the Class of 1997)
- ML12031A013 + (U.S. Nuclear Regulatory Commission Investigation Report No. 2-2010-058, CPN International, Inc)
- ML26016A536 + (U.S. Nuclear Regulatory Commission July 1, 2025, to September 30, 2025, Audit Report Pertaining to the Review of Topical Report Cable TR-R0, Condition Monitoring Methodology to Extend the Life of Cables (EPID L-2024-TOP-0030) - Enclosure)
- ML26016A535 + (U.S. Nuclear Regulatory Commission July 1, 2025, to September 30, 2025, Audit Report Pertaining to the Review of Topical Report Cable TR-R0, Condition Monitoring Methodology to Extend the Life of Cables (EPID L-2024-TOP-0030) - Memo)
- PMNS20180224, U.S. Nuclear Regulatory Commission Low-Level Radioactive Waste Program Public Meeting + (U.S. Nuclear Regulatory Commission Low-Level Radioactive Waste Program Public Meeting)
- ML19143A084 + (U.S. Nuclear Regulatory Commission March 18 - 19, 2019 Onsite Observation Visit Report for the Savannah River Site Tank Farms)
- IR 05000293/2014404 + (U.S. Nuclear Regulatory Commission Material Control and Accounting Program Inspection Report No. 05000293/2014404 Public Report)
- IR 05000352/2013406 + (U.S. Nuclear Regulatory Commission Material Control and Accounting Program Inspection Report No. 05000352-13-406 and 05000353-13-406)
- IR 05000027/2013406 + (U.S. Nuclear Regulatory Commission Material Control and Accounting Program Inspection Report No. 0500027-13-406 and 05000278-13-406)