Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- U-604152, Transmittal of Revision 15 to Technical Specification Bases + (Transmittal of Revision 15 to Technical Specification Bases)
- U-604193, Transmittal of Revision 16 to Technical Specification Bases + (Transmittal of Revision 16 to Technical Specification Bases)
- ML092790336 + (Transmittal of Revision 17 to Hfsr/Loe/Loep)
- VPN-001-202, Transmittal of Revision 17 to PGE-J0691 Trojan- Independent Spent Fuel Storage Installation (ISFSI) Safety Analysis Report + (Transmittal of Revision 17 to PGE-J0691 Trojan- Independent Spent Fuel Storage Installation (ISFSI) Safety Analysis Report)
- ML13214A065 + (Transmittal of Revision 17 to Updated Final Safety Analysis Report)
- U-604257, Transmittal of Revision 17 to the Technical Specification Bases + (Transmittal of Revision 17 to the Technical Specification Bases)
- ML023450573 + (Transmittal of Revision 19 of the Technical Specifications Bases)
- U-604396, Transmittal of Revision 19 to the Clinton Power Station Technical Specification Bases + (Transmittal of Revision 19 to the Clinton Power Station Technical Specification Bases)
- ML24304A967 + (Transmittal of Revision 2 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles)
- ML022670616 + (Transmittal of Revision 2 of Davis-Besse Return to Service Plan)
- ML031340545 + (Transmittal of Revision 2 to EPIP RA-EP-02250, Radiation Monitoring Team Surveys)
- ML18283B371 + (Transmittal of Revision 2 to Response Concerning Electrical Connector Assemblies)
- ML032100573 + (Transmittal of Revision 20 of Indian Point Unit 2 Emergency Plan Implementing Procedure IP-1023, Operations Support Center)
- U-604454, Transmittal of Revision 20 to Technical Specification Bases + (Transmittal of Revision 20 to Technical Specification Bases)
- ML081790167 + (Transmittal of Revision 21 to Updated Safety Analysis Report)
- NL-08-0534, Transmittal of Revision 21 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Report, Technical Specification Bases Changes and Revised NRC Commitments Report + (Transmittal of Revision 21 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Report, Technical Specification Bases Changes and Revised NRC Commitments Report)
- NG-15-0138, Transmittal of Revision 23 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases + (Transmittal of Revision 23 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases)
- NG-17-0086, Transmittal of Revision 24 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases + (Transmittal of Revision 24 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases)
- ML19100A055 + (Transmittal of Revision 25 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases)
- NG-19-0024, Transmittal of Revision 25 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases + (Transmittal of Revision 25 of the DAEC Updated Final Safety Analysis Report and the Current DAEC Technical Specifications Bases)
- LIC-06-0138, Transmittal of Revision 3 of Fort Calhoun Station, Unit No. 1 (Fcs), Pressure Temperature Limits Report (PTLR) + (Transmittal of Revision 3 of Fort Calhoun Station, Unit No. 1 (Fcs), Pressure Temperature Limits Report (PTLR))
- ML022740488 + (Transmittal of Revision 3 to Davis-Besse Unit 1 Return to Service Plan)
- ML031900037 + (Transmittal of Revision 3 to RA-EP-02861, Emergency Plan Off Normal Occurence Procedure)
- CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out + (Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out)
- EPID:L-2023-LLA-0064 + (Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out)
- LIC-18-0021, Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan) + (Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan))
- L-17-359, Transmittal of Revision 31 to Emergency Plan + (Transmittal of Revision 31 to Emergency Plan)
- ML17347A112 + (Transmittal of Revision 31 to Emergency Plan)
- GNRO-2003/00003, Transmittal of Revision 34 of Physical Security Plan + (Transmittal of Revision 34 of Physical Security Plan)
- ML16168A330 + (Transmittal of Revision 34 to Updated Safety Analysis Report)
- ML030080073 + (Transmittal of Revision 38 of FNP-0-EP-0.0 - Emergency Plan for Farley Nuclear Plant)
- ML041040733 + (Transmittal of Revision 39 of Emergency Plan Implementing Procedure EIP-ZZ-00201, Notifications)
- ML031681283 + (Transmittal of Revision 4 to Table of Contents for Davis Besse Nuclear Power Station Emergency Procedure RA-EP-02820)
- ML031340577 + (Transmittal of Revision 41 Improved Technical Specifications Bases Manuals Unit 2)
- ML020590296 + (Transmittal of Revision 42 to Issue 4 of Beaver Valley Power Station (BVPS) Physical Security Plan (PSP) (Base Plan, Safeguards Contingency Plan & Training & Qualification Plan). Without Enclosure)
- ML031340575 + (Transmittal of Revision 43 of Improved Technical Specifications Manual Bases Unit 1)
- ML093350691 + (Transmittal of Revision 5 to Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.-)
- ML040860712 + (Transmittal of Revision 5 to the Defueled Safety Analysis Report, Revision 14 to the Safstor Quality Assurance Plan, and Revision 1 to the Technical Specifications Bases)
- ML031010240 + (Transmittal of Revision 6 of Davis-Besse Return to Service Plan, Revision 5 of Davis-Besse Restart Action Plan, Revison 5 of Davis-Besse Program Compliance Plan, & Revison 3 of Nuclear Operating Business Practice, Restart Readiness Review E)
- ML101940174 + (Transmittal of Revision 6 to the Physical Security Plan for R-110 and SNM 1373 Licenses)
- GO2-14-122, Transmittal of Revision 60 to the Columbia Generating Station Emergency Plan + (Transmittal of Revision 60 to the Columbia Generating Station Emergency Plan)
- U-603588, Transmittal of Revision 7 to Clinton Power Station Technical Specification Bases + (Transmittal of Revision 7 to Clinton Power Station Technical Specification Bases)
- ML022760488 + (Transmittal of Revision 7 to Fort Calhoun Security Training & Qualification Plan)
- VPN-008-200, Transmittal of Revision 7 to the Trojan Independent Spent Fuel Storage Installation Emergency Plan, PGE-1075 + (Transmittal of Revision 7 to the Trojan Independent Spent Fuel Storage Installation Emergency Plan, PGE-1075)
- NL-09-1692, Transmittal of Revision 8 to Security Plan + (Transmittal of Revision 8 to Security Plan)
- U-603640, Transmittal of Revision 8 to the Technical Specification Bases + (Transmittal of Revision 8 to the Technical Specification Bases)
- U-603708, Transmittal of Revision 9 to the Clinton Power Station Technical Specification Bases + (Transmittal of Revision 9 to the Clinton Power Station Technical Specification Bases)
- ML18026A620 + (Transmittal of Revision 9A of EPP 06-006 Procedure That Implements the Radiological Emergency Response Plan (RERP))
- ML18026A616 + (Transmittal of Revision 9A of EPP 06-006 Procedure That Implements the Radiological Emergency Response Plan (RERP))
- ML030770641 + (Transmittal of Revision EP-PS-101, Emergency Director (ED)-TSC Emergency Plan-Position Specific Procedure)
- ML18318A314 + (Transmittal of Revision of Four Procedures and One Form That Implement the Radiological Emergency Response Plan)
- ML19238A067 + (Transmittal of Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (Wcgs). Includes EPP 06-008, Rev. 1A)